Toronto address · Ward 3, Etobicoke-Lakeshore
21 Medulla Ave
The City of Toronto has 8 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Plumbing
REV 01- Changes as bubbled drawings.Revision to original design of process drain pipe. Proposed underslab connection not found. Piping design re-routed overhead. Original Pump specification revised.
Applied Jul 25, 2021 · issued Aug 23, 2021 · completed Nov 19, 2021 · Permit 18 124977 PLB (revision 01)
- Closed
Addition or alteration · Addition(s)
REVISION#1: Correction of non-compliance to 3.4.4.4.(1) under permit no. 18 124977 BLD. Construction of shaftwall enclosure to isolate equipment related process piping from 'exit' stairwall.CONSTRUCTION OF A TWO STOREY ADDITION TO EAST SIDE OF BUILDING. EXISTING BUILDING AND ADDITION ARE USED FOR FOOD PROCESSING. MAIN FLOOR IS FOOD PROCESSING. SECOND FLOOR IS BUILDING SERVICES.
Applied Sep 11, 2020 · issued Oct 9, 2020 · completed Dec 29, 2021 · Permit 18 124977 BLD (revision 01)
- Closed
Drains and site services · Site service
Proposed replacement of segment of fire water line.
Applied Nov 19, 2018 · issued Nov 27, 2018 · completed Jan 16, 2019 · Permit 18 257950 STS
- Closed
Addition or alteration · Addition(s)
Construction of a two storey addition to east side of building. Existing building and addition are used for food processing. Main floor is food processing. Second floor is building services.
Applied Mar 5, 2018 · issued Apr 25, 2018 · completed Dec 29, 2021 · Permit 18 124977 BLD
- Closed
Heating and ventilation
Hvac - construction of a two storey addition to east side of building. Existing building and addition are used for food processing. Main floor is food processing. Second floor is building services.
Applied Mar 5, 2018 · issued Apr 25, 2018 · completed Dec 14, 2021 · Permit 18 124977 HVA
- Closed
Plumbing
Plumbing - CONSTRUCTION OF A TWO STOREY ADDITION TO EAST SIDE OF BUILDING. EXISTING BUILDING AND ADDITION ARE USED FOR FOOD PROCESSING. MAIN FLOOR IS FOOD PROCESSING. SECOND FLOOR IS BUILDING SERVICES.
Applied Mar 5, 2018 · issued Apr 25, 2018 · completed Nov 19, 2021 · Permit 18 124977 PLB
- Closed
Drains and site services · Inside and outside drains
Install (1) interceptor and backflow preventer and sani and water pipes connecting at the property line.
Applied Feb 3, 2014 · issued Mar 20, 2014 · completed Oct 30, 2018 · Permit 14 112633 STS
- Closed
Drains and site services · Inside and outside drains
Removal of three single floor drains and replace with new trench drains. Construction of new exterior process drain to facilitate drain cleaning outside the food processing area. Construction of new interior drain to new short segment of floor drain for "Sunrise Soya"
Applied Jun 2, 2008 · issued Jun 17, 2008 · completed May 4, 2017 · Permit 08 164748 STS
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
106 North Queen St · Minor variance
To construct a one-storey north side addition.
190 m away · filed Jan 12, 2021 · Approved
18 Medulla Ave · Minor variance
To construct a one-storey rear addition.
140 m away · filed Jul 20, 2019 · Approved
25 Coronet Rd · Minor variance
250 m away · filed Dec 4, 2018 · Application withdrawn
35 Coronet Rd · Consent
To obtain consent to sever the property into two lots and to create easements/ right-of-way for the purpose of vehicular access and parking.
190 m away · filed Dec 1, 2015 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.