Toronto address · Ward 19, Beaches-East York
21 Neville Park Blvd
The City of Toronto has 4 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Designated structure · Retaining wall
construct retaining wall at north side of property
Applied Oct 31, 2002 · issued Oct 31, 2002 · completed Apr 22, 2026 · Permit 02 185766 DST
- Closed
Small residential project · Multiple projects
alter plnas by constructing 3rd floor larger, see as built plans..
Applied Feb 28, 2002 · issued Nov 8, 2002 · completed Apr 22, 2026 · Permit 01 178604 BLD (revision 01)
- Closed
Heating and ventilation
Hvac - alter h.v.a.c. System. See building permit no. 01-178604
Applied Sep 20, 2001 · issued Nov 13, 2001 · completed Apr 22, 2026 · Permit 01 178604 HVA
- Closed
Small residential project · Multiple projects
construct 2 storey and basement additiion at rear with deck. construct 3rd floor dormer at rear with roof deck at 3rd floor level.
Applied Sep 20, 2001 · issued Nov 13, 2001 · completed Apr 22, 2026 · Permit 01 178604 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
20 Balmy Ave · Minor variance
To permit a front (south) yard parking pad (located on a private driveway that does not lead directly to a garage) and construct a driveway, abutting Balmy Avenue. Also, to construct a new front walkway.
160 m away · filed Jan 26, 2026 · Approved
6 Munro Park Ave · Minor variance
To alter the existing three-storey detached dwelling by constructing a front one-storey addition (partial front porch enclosure), a side (south) one-storey addition, a rear one-storey addition, and a rear third storey addition. The accessory structure (gym) in the rear yard is under construction as approved by Building Permit 24 201485 BLD 00 SR.
190 m away · filed Sep 23, 2024 · Approved
428 Lake Front · Minor variance
To construct a new three-storey detached dwelling with an integral garage.
230 m away · filed Nov 21, 2023 · Approved
87 Neville Park Blvd · Consent
To obtain consent to create an easement/right-of-way.
160 m away · filed May 25, 2022 · Approved
44 Nursewood Rd · Minor variance
To construct a new three-storey detached dwelling with a front integral garage, a rear basement walkout, and rear second and third storey balconies.
70 m away · filed Mar 19, 2022 · Approved
44 Nursewood Rd · Minor variance
To construct a new three-storey detached dwelling with an integral garage,
70 m away · filed Nov 16, 2021 · Refused
18 Munro Park Ave · Minor variance
To construct a third storey addition with a rear rooftop deck to the existing dwelling.
160 m away · filed Jul 22, 2021 · Approved
2455 Queen St E · Minor variance
To convert the existing two-storey, mixed-use building containing retail uses on the ground floor and one dwelling unit at the second storey into a three-storey, mixed-use building containing retail uses on the ground floor and two dwelling units on the second and third stories by constructing: a rear second storey addition with a rear balcony; a full third storey addition with a rear balcony; and a rear staircase providing access to the second and third storeys.
170 m away · filed Dec 16, 2020 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.