Toronto address · Ward 15, Don Valley West
211 Ranleigh Ave
The City of Toronto has 5 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
HVAC - Proposal to construct third floor addition, basement underpinning, interior alterations, and new rear deck
Applied Aug 1, 2017 · issued Sep 1, 2017 · completed Nov 1, 2018 · Permit 17 209528 HVA
- Closed
Plumbing
Plumbing - Proposal to construct third floor addition, basement underpinning, interior alterations, and new rear deck
Applied Aug 1, 2017 · issued Sep 1, 2017 · completed Nov 1, 2018 · Permit 17 209528 PLB
- Closed
Small residential project · Multiple projects
Proposal to construct third floor addition, basement underpinning, interior alterations, new front concrete porch and new rear deck
Applied Aug 1, 2017 · issued Sep 1, 2017 · completed Nov 1, 2018 · Permit 17 209528 BLD
- Closed
Drains and site services
Drain - Proposal to construct third floor addition, basement underpinning, interior alterations, and new rear deck
Applied Aug 1, 2017 · issued Sep 1, 2017 · completed Nov 1, 2018 · Permit 17 209528 DRN
- Cancelled
Small residential project · Garage
To Construct a new rear detached garage to replace old shed
Applied Mar 9, 2017 · issued Apr 5, 2017 · completed Oct 16, 2025 · Permit 17 127066 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · NR addition
To construct a rear three-storey addition and interior alterations.
Decision: Approved (hearing May 4, 2017)
Filed Feb 22, 2017 · File A0159/17NY
What’s planned nearby
Development sites within 500 m
- Approved
4 storeys · 16 homes · Residential
440 m away · Site plan · Approved · filed Jun 30, 2022
- Under appeal
9 storeys · 40 homes · Residential
470 m away · Rezoning · Under appeal · filed Mar 3, 2023
Neighbours’ Committee of Adjustment files within 250 m
29 Kappele Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a new two-storey rear addition. The existing one-storey rear addition and deck would be demolished.
230 m away · filed Jun 30, 2025 · Approved
190 Ranleigh Ave · Minor variance
To construct a new two storey detached dwelling.
70 m away · filed Mar 10, 2025 · Approved
217 Wanless Ave · Minor variance
To construct a new detached dwelling. NOTE: This application was previously deferred at the Committee of Adjustment hearing on November 21, 2024.
210 m away · filed Oct 16, 2024 · Approved
107 Wanless Ave · Minor variance
To construct a third floor addition and a rear balcony to the existing house
220 m away · filed Sep 9, 2024 · Approved
174 Ranleigh Ave · Minor variance
To construct a one-storey addition to the front of the existing dwelling, a two-storey addition to the rear of the dwelling, in conjunction with other interior and exterior alterations. The applicant is also proposing to construct a new detached garage.
110 m away · filed Dec 5, 2023 · Approved
42 Kappele Ave · Minor variance
Proposal to construct a new single family detached dwelling. (Deferred from the hearing of 8 June 2023)
230 m away · filed Mar 29, 2023 · Approved
135 Roslin Ave · Minor variance
Proposal to construct a one-storey rear and side addition.
200 m away · filed Oct 12, 2022 · Approved
111 Ronan Ave · Minor variance
To construct a rear addition to the existing dwelling.
160 m away · filed Aug 30, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.