The City of Toronto has 12 building permits since 2017 (9 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Partial permit · Partial permit - structural framing

    Part Permit - Proposal to construct 9 new stacked townhouses

    Applied Sep 23, 2025 · completed Mar 31, 2026 · Permit 24 120723 STR

    Superseded
  • Partial permit · Partial permit - foundation

    Part Permit - Proposal to construct 9 new stacked townhouses

    Applied Mar 21, 2025 · completed Mar 31, 2026 · Permit 24 120723 FND

    Cancelled
  • Conditional permit · Inside and outside drains

    Conditional Permit - Drain - Proposal to construct 9 new stacked townhouses

    Applied Feb 28, 2025 · issued Apr 8, 2025 · Permit 24 120723 STS

    Inspections under way
  • Development charges deferral

    Deferred Fees from folder 24 120723 (RSN-5404655) ZoningProcess RSN 74432594

    Applied Jul 15, 2024 · Permit 24 120723 BLD

    Open
  • Drains and site services

    Drain - Proposal to construct 9 new stacked townhouses

    Applied Feb 29, 2024 · issued May 14, 2025 · Permit 24 120723 DRN

    Inspections under way
  • New building

    Proposal to construct 9 new stacked townhouses

    Applied Feb 29, 2024 · 9 homes added · Permit 24 120723 BLD

    Under review
  • Heating and ventilation

    HVAC - Proposal to construct 9 new stacked townhouses

    Applied Feb 29, 2024 · issued May 14, 2025 · Permit 24 120723 HVA

    Permit issued
  • Plumbing

    Plumbing - Proposal to construct 9 new stacked townhouses

    Applied Feb 29, 2024 · issued May 14, 2025 · Permit 24 120723 PLB

    Inspections under way
  • Addition or alteration · Interior alterations

    Revision #1: Changes to floors 2 - 9 included to relocate closet and washroom.Proposed interior alterations to existing 9 storey apartment building to convert storage space on 2nd to 9th floors to create eight new batchelor units.

    Applied Apr 18, 2012 · issued Apr 24, 2012 · Permit 11 104107 BLD (revision 01)

    Revision issued
  • Addition or alteration · Interior alterations

    Proposed interior alterations to existing 9 storey apartment building to convert storage space on 2nd to 9th floors to create eight new batchelor units.

    Applied Jan 10, 2011 · issued Jun 1, 2011 · 8 homes added · Permit 11 104107 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Proposed interior alterations to existing 9 storey apartment building to convert storage space on 2nd to 9th floors to creat eight new batchelor units.

    Applied Jan 10, 2011 · issued Jun 1, 2011 · completed Oct 26, 2017 · Permit 11 104107 HVA

    Closed
  • Residential building permit · Alteration to existing building

    BALCONY & EXPOSED CONCRET REPAIRCarrie requested that we issue and mail out permit to Peter Ostercil. mailed on may12/00

    Applied May 8, 2000 · issued May 12, 2000 · Permit 00 148622 CMB

    Inspections under way

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · Other

    To construct a new three-storey stacked townhouse building with nine residential units. A previous Committee of Adjustment application (A377/10EYK) approved variances relating to parking.

    Decision: Approved (hearing Nov 24, 2022)

    Filed Sep 15, 2022 · File A0471/22EYK

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 2255 Keele St · Minor variance

    To legalize and to maintain the location of the existing building and the restaurant and office space within the building. The existing building encroaches beyond the rear and south side lot lines.

    190 m away · filed Feb 8, 2024 · Approved

  • 2265 Keele St · Minor variance

    To convert the existing second storey into nine residential units and two offices.

    240 m away · filed Nov 8, 2022 · Approved

  • 2050 Keele St · Minor variance

    To convert the basement of the existing building into 9 additional dwelling units.

    220 m away · filed Oct 2, 2022 · Approved

  • 2221 Keele St · Minor variance

    To permit a temporary sales presentation centre and essential service tank.

    150 m away · filed Nov 29, 2019 · Approved

  • 16 Ingram Dr · Minor variance

    To construct a one-storey office building.

    130 m away · filed Aug 18, 2016 · Approved

  • 24 Ingram Dr · Minor variance

    To permit a vehicle dealership within the existing service station in an industrial building that contains multiple tenants.

    210 m away · filed Mar 5, 2015 · Deferred

Everything planned in York South-Weston

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.