Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 5, York South-Weston

2265 Keele St

The City of Toronto has 9 building permits since 2017 (8 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Addition or alteration · Interior alterations

    Proposal for interior alterations of second floor.

    Applied May 25, 2026 · issued May 26, 2026 · Permit 26 166765 BLD

    Permit issued
  • Plumbing

    Plumbing - Proposal for interior alterations of second floor.

    Applied May 25, 2026 · issued Jun 1, 2026 · Permit 26 166765 PLB

    Permit issued
  • Heating and ventilation

    HVAC - Proposal for interior alterations of second floor.

    Applied May 25, 2026 · issued Jun 1, 2026 · Permit 26 166765 HVA

    Permit issued
  • Plumbing

    Revision to 16 263279 PLB - Addition/renovation of existing building (non-residential) to retail space. Plumbing - Proposal to renovate the ground floor and basement and convert the use from office to retail. Fill in the loading ramp along the north side of the building and construct a new entrance addition. Second floor to remain as office use.

    Applied Aug 15, 2019 · issued Nov 19, 2019 · Permit 16 263279 PLB (revision 01)

    Revision issued
  • Heating and ventilation

    Revision to 16 263279 HVA - Addition/renovation of existing building (non-residential) to retail space. HVAC - Proposal to renovate the ground floor and basement and convert the use from office to retail. Fill in the loading ramp along the north side of the building and construct a new entrance addition. Second floor to remain as office use.

    Applied Aug 15, 2019 · issued Jul 28, 2020 · Permit 16 263279 HVA (revision 01)

    Revision issued
  • Drains and site services · Site service

    Drain - Proposal to renovate the ground floor and basement and convert the use from court offices to retail. Fill in the loading ramp along the north side of the building and construct a new entrance addition. Second floor to remain as office use.

    Applied Feb 20, 2018 · issued Nov 9, 2018 · Permit 16 263279 STS

    Inspections under way
  • Addition or alteration · Multiple projects

    Proposal to renovate the ground floor and basement and convert the use from court offices to retail. Fill in the loading ramp along the north side of the building and construct a new entrance addition. Second floor to remain as office use.

    Applied Dec 12, 2016 · issued Mar 23, 2021 · completed Oct 1, 2021 · Permit 16 263279 BLD

    Closed
  • Heating and ventilation

    HVAC - Proposal to renovate the ground floor and basement and convert the use from office to retail. Fill in the loading ramp along the north side of the building and construct a new entrance addition. Second floor to remain as office use.

    Applied Dec 12, 2016 · issued Oct 6, 2017 · Permit 16 263279 HVA

    Inspections under way
  • Plumbing

    Plumbing - Proposal to renovate the ground floor and basement and convert the use from office to retail. Fill in the loading ramp along the north side of the building and construct a new entrance addition. Second floor to remain as office use.

    Applied Dec 12, 2016 · issued Oct 6, 2017 · Permit 16 263279 PLB

    Inspections under way

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · Other

    To convert the existing second storey into nine residential units and two offices.

    Decision: Approved (hearing Jan 26, 2023)

    Filed Nov 8, 2022 · File A0568/22EYK

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 9 Densley Ave · Minor variance

    To permit a recreational use (padel court) within the rear of the existing industrial building.

    70 m away · filed Apr 22, 2026 · Approved

  • 9 Densley Ave · Minor variance

    To permit a parking deficiency.

    70 m away · filed May 22, 2024 · Approved

  • 2255 Keele St · Minor variance

    To legalize and to maintain the location of the existing building and the restaurant and office space within the building. The existing building encroaches beyond the rear and south side lot lines.

    60 m away · filed Feb 8, 2024 · Approved

  • 2110 Keele St · Minor variance

    To construct a new three-storey stacked townhouse building with nine residential units. A previous Committee of Adjustment application (A377/10EYK) approved variances relating to parking.

    240 m away · filed Sep 15, 2022 · Approved

  • 2275-2285 Keele St · Minor variance

    To legalize and to maintain rear two-storey additions and a one-storey rear addition.

    70 m away · filed Apr 30, 2019 · Approved

  • 2294 Keele St · Minor variance

    To construct a second and third floor addition and to convert the existing comercial building into a mixed-use commercial/residential building.

    140 m away · filed Mar 21, 2017 · Approved

  • 16 Ingram Dr · Minor variance

    To construct a one-storey office building.

    240 m away · filed Aug 18, 2016 · Approved

  • 24 Ingram Dr · Minor variance

    To permit a vehicle dealership within the existing service station in an industrial building that contains multiple tenants.

    250 m away · filed Mar 5, 2015 · Deferred

Everything planned in York South-Weston

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.