Toronto address · Ward 5, York South-Weston
2275-2285 Keele St
The City of Toronto has 6 building permits since 2017 (6 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Permit issued
Addition or alteration · Other
Propopal to replace existing exterior wall with curtain wall.
Applied Dec 19, 2022 · issued Mar 28, 2023 · Permit 22 240753 BLD
- Permit issued
Addition or alteration · Addition(s)
Proposal to construct a new two storey side addition to existing bakery.
Applied Dec 11, 2019 · issued Oct 29, 2021 · Permit 19 259873 BLD
- Revision issued
Addition or alteration · Interior alterations
Revision to 08-230219 with respect of restaurant layout. (Interior alterations to create space for new take-out restaurant tenant. Previously retail.)
Applied Mar 12, 2009 · issued Mar 30, 2009 · Permit 08 230219 BLD (revision 01)
- Inspections under way
Addition or alteration · Interior alterations
Interior alterations to create space for new take-out restaurant tenant. Previously retail.
Applied Dec 17, 2008 · issued Jan 6, 2009 · Permit 08 230219 BLD
- Inspections under way
Plumbing
Plumbing - Interior alterations to create space for new take-out restaurant tenant. Previously restaurant. Fixtures
Applied Dec 17, 2008 · issued Jan 13, 2009 · Permit 08 230219 PLB
- Inspections under way
Heating and ventilation
HVAC - Special ventilation system. Interior alterations to create space for new take-out restaurant tenant. Previously restaurant.
Applied Dec 17, 2008 · issued Jan 13, 2009 · Permit 08 230219 HVA
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · NR addition
To legalize and to maintain rear two-storey additions and a one-storey rear addition.
Decision: Approved (hearing Aug 29, 2019)
Filed Apr 30, 2019 · File A0257/19EYK
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
9 Densley Ave · Minor variance
To permit a recreational use (padel court) within the rear of the existing industrial building.
70 m away · filed Apr 22, 2026 · Approved
9 Densley Ave · Minor variance
To permit a parking deficiency.
70 m away · filed May 22, 2024 · Approved
2255 Keele St · Minor variance
To legalize and to maintain the location of the existing building and the restaurant and office space within the building. The existing building encroaches beyond the rear and south side lot lines.
120 m away · filed Feb 8, 2024 · Approved
2265 Keele St · Minor variance
To convert the existing second storey into nine residential units and two offices.
70 m away · filed Nov 8, 2022 · Approved
15 Milford Ave · Minor variance
To construct a one-storey addition along the rear side of the existing buildings at 17 and 21 Milford Avenue.
200 m away · filed Oct 11, 2022 · Refused
2319 Keele St · Minor variance
To convert the ground floor of the existing building into a restaurant.
250 m away · filed Jun 18, 2019 · Approved
25 Milford Ave · Minor variance
To convert the second storey office into a residential dwelling.
240 m away · filed Sep 17, 2018 · Deferred
2294 Keele St · Minor variance
To construct a second and third floor addition and to convert the existing comercial building into a mixed-use commercial/residential building.
90 m away · filed Mar 21, 2017 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.