The City of Toronto has 9 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Pool fence enclosure

    Proposal for pool installation and pool shed building

    Applied Dec 2, 2020 · completed Dec 3, 2020 · Permit 20 224907 BLD

    Closed
  • New house · New building

    REV03: Revision to permit 18-131119 BLD 03 as per bubbled area. Proposal to raise basement slab and main floor at rear elevation as well as change to attic location.REVISION#2 - WINDOW SIZE CHANGE, GLAZING PERCENTAGE CHANGE, interior alterationsconstruct new 2 storey house with finished basement

    Applied Oct 31, 2019 · completed Dec 11, 2019 · Permit 18 131119 BLD (revision 04)

    Cancelled
  • New house · New building

    REVISION#2 - WINDOW SIZE CHANGE, GLAZING PERCENTAGE CHANGE, interior alterationsconstruct new 2 storey house with finished basement

    Applied Oct 16, 2019 · issued Oct 30, 2019 · completed Jan 15, 2021 · Permit 18 131119 BLD (revision 03)

    Closed
  • Heating and ventilation

    HVAC - construct new 2 storey house with finished basement

    Applied Mar 19, 2019 · issued Oct 15, 2019 · completed Dec 17, 2020 · Permit 18 131119 HVA

    Closed
  • New house · New building

    REVISION - changes to the shoring and foundation designconstruct new 2 storey house with finished basement

    Applied Oct 15, 2018 · issued Nov 9, 2018 · completed Jan 15, 2021 · Permit 18 131119 BLD (revision 01)

    Closed
  • New house · New building

    construct new 2 storey house with finished basement

    Applied Mar 19, 2018 · issued Jun 8, 2018 · completed Jan 15, 2021 · 1 home added · Permit 18 131119 BLD

    Closed
  • Plumbing

    Plumbing - construct new 2 storey house with finished basement

    Applied Mar 19, 2018 · issued Jun 8, 2018 · completed Dec 17, 2020 · Permit 18 131119 PLB

    Closed
  • Demolition

    demolish existing house

    Applied Mar 19, 2018 · issued Aug 16, 2018 · completed Apr 30, 2019 · 1 home removed · Permit 18 131126 DEM

    Closed
  • Drains and site services

    Drain - construct new 2 storey house with finished basement

    Applied Mar 19, 2018 · issued Jun 8, 2018 · completed Dec 17, 2020 · Permit 18 131119 DRN

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · New R building

    To construct a new two-storey detached dwelling with integral garage and rear deck.

    Decision: Approved (hearing Jun 7, 2017)

    Filed Oct 17, 2016 · File A1012/16TEY

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 222 Chaplin Cres · Minor variance

    To alter the existing one-storey detached by constructing a complete second storey addition, and a front and side (east) one-storey addition (with a basement addition below). A portion of the existing driveway at the southeast corner of the lot will be reconstructed.

    160 m away · filed Sep 14, 2026 · Postponed

  • 35 Braemar Ave · Minor variance

    To construct a new two-storey detached ancillary building (to contain one garden suite with two parking spaces), in the rear yard of the existing two-storey detached dwelling. There will be a total of four residential dwelling units on this lot (three units within the main building, and one unit within the ancillary building).

    220 m away · filed Apr 15, 2026 · Approved

  • 242 Forest Hill Rd · Minor variance

    To construct a new three-storey detached dwelling (including a basement extension below with a walkout), with an integral garage, a front covered porch with stairs and a rear covered patio platform. Also, a new front driveway will be constructed on the east side of the lot. The existing detached garage will be demolished.

    200 m away · filed Jul 21, 2025 · Approved

  • 238 Forest Hill Rd · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a one-storey front addition to the existing attached garage, and a rear second storey addition.

    170 m away · filed May 12, 2025 · Approved

  • 38 Braemar Ave · Minor variance

    To construct a new three-storey detached dwelling with a front integral garage, a front second level porch with stairs, and a rear second level deck with stairs.

    210 m away · filed Mar 6, 2025 · Approved

  • 242 Forest Hill Rd · Minor variance

    To construct a new three-storey detached dwelling with an integral garage, a covered front porch with stairs, side (west) stairs, a rear third storey balcony, a rear ground floor covered patio with stairs, a rear basement walkout, and an in-ground swimming pool.

    200 m away · filed Jan 8, 2025 · Refused

  • 205 Forest Hill Rd · Minor variance

    To construct a new three-storey detached dwelling with an integral garage, a rear ground floor deck, a rear second storey balcony, a rear third storey terrace, and a rear basement walkout.

    60 m away · filed Dec 2, 2024 · Approved

  • 221 Chaplin Cres · Minor variance

    To construct a new three-storey detached dwelling with an integral garage, a covered front porch with stairs, a rear second floor deck with stairs, and a rear basement (ground floor) walkout with a patio.

    210 m away · filed Aug 27, 2024 · Refused

Everything planned in Toronto-St. Paul's

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.