Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 3, Etobicoke-Lakeshore

217 Lake Shore Dr

The City of Toronto has 5 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    Rev 01: Changes to hvac HVAC - To construct ground and second floor addition, front porch, interior alterations to existing two storey dwelling

    Applied Feb 8, 2021 · issued Mar 1, 2021 · completed Sep 30, 2022 · Permit 20 200318 HVA (revision 01)

    Closed
  • Small residential project · Multiple projects

    Rev 01: Changes to the front porch area and second-floor floor layout, see bubbled areas. To construct ground and second floor addition, front porch, interior alterations to existing two storey dwelling

    Applied Feb 8, 2021 · issued Mar 1, 2021 · completed Oct 7, 2022 · Permit 20 200318 BLD (revision 01)

    Closed
  • Heating and ventilation

    HVAC - To construct ground and second floor addition, front porch, interior alterations to existing two storey dwelling

    Applied Sep 29, 2020 · issued Oct 16, 2020 · completed Sep 30, 2022 · Permit 20 200318 HVA

    Closed
  • Plumbing

    Plumbing - To construct ground and second floor addition, front porch, interior alterations to existing two storey dwelling

    Applied Sep 29, 2020 · issued Oct 16, 2020 · completed Sep 30, 2022 · Permit 20 200318 PLB

    Closed
  • Small residential project · Multiple projects

    To construct ground and second floor addition, front porch, interior alterations to existing two storey dwelling

    Applied Sep 29, 2020 · issued Oct 16, 2020 · completed Oct 7, 2022 · Permit 20 200318 BLD

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To construct a two-storey front addition.

    Decision: Approved (hearing Sep 15, 2020)

    Filed Jun 17, 2020 · File A0224/20EYK

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 155 Lake Shore Dr · Minor variance

    To convert an existing ground floor storage room into one additional dwelling unit. A total of 34 dwelling units are proposed.

    200 m away · filed Mar 17, 2026 · Hearing scheduled

  • 36 Eleventh St · Minor variance

    To construct a new semi-detached garage in the rear yard.

    230 m away · filed Sep 3, 2025 · Approved

  • 33 Twelfth St · Minor variance

    To construct a new detached dwelling with an attached garage.

    190 m away · filed Jun 13, 2023 · Approved

  • 175 Lake Shore Dr · Minor variance

    To construct a new detached dwelling with an attached garage.

    180 m away · filed Feb 23, 2023 · Refused

  • 175 Lake Shore Dr · Consent

    To obtain consent to sever the property into three undersized residential lots.

    180 m away · filed Feb 23, 2023 · Refused

  • 175 Lake Shore Dr · Minor variance

    To construct a new detached dwelling with an attached garage.

    180 m away · filed Feb 23, 2023 · Refused

  • 175 Lake Shore Dr · Minor variance

    To construct a new detached dwelling with an attached garage.

    180 m away · filed Feb 23, 2023 · Refused

  • 180 Lake Shore Dr · Minor variance

    To construct a new detached dwelling with an attached garage.

    110 m away · filed Jul 29, 2022 · Approved

Everything planned in Etobicoke-Lakeshore

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.