Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 10, Spadina-Fort York

218 Queens Quay W

The City of Toronto has 7 building permits since 2017 (5 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing · Backflow prevention devices (Water only)

    Install premise isolation backflow preventer

    Applied Feb 4, 2025 · issued Mar 4, 2025 · Permit 25 112637 PSA

    Inspections under way
  • Addition or alteration · Garage Repair/Reconstruction

    Parking garage repairs

    Applied Feb 10, 2022 · issued Mar 10, 2022 · Permit 22 113000 BLD

    Permit issued
  • Heating and ventilation · Other

    Fire and smoke damper replacement

    Applied Mar 4, 2019 · issued Apr 18, 2019 · Permit 19 121374 MSA

    Permit issued
  • Plumbing · Piping: other buildings

    Proposal to replace kitec piping in multiple suites within existing condo buildings. See attached for detailed list of suite numbers. Also see separate permit for additional tower at 208 QUEENS QUAY W.

    Applied Jun 28, 2018 · issued Jul 20, 2018 · completed May 15, 2019 · Permit 18 186069 PSA

    Closed
  • Plumbing · Piping: other buildings

    Replacement of Kitec piping in suite 2511.

    Applied Mar 27, 2018 · issued Apr 18, 2018 · Permit 18 135019 PSA

    Permit issued
  • Plumbing · Piping: other buildings

    Replacement of Kitec piping in suite 2409.

    Applied Mar 27, 2018 · issued Apr 18, 2018 · Permit 18 135008 PSA

    Permit issued
  • Fire and security upgrade · Electromagnetic locks

    Install 1 maglock to 2nd floor terrace exit

    Applied Mar 3, 2005 · issued Mar 3, 2005 · completed Jan 29, 2026 · Permit 05 112751 FSU

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

  • 200 Queens Quay West

    59 storeys · 1,024 homes · Mixed use

    70 m away · Condominium · Under review · filed Nov 3, 2021

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 200 Queens Quay W · Minor variance

    90 m away · filed Aug 12, 2026 · Application withdrawn

  • 200 Queens Quay W · Minor variance

    To alter the development standards (as approved under Site Specific Zoning By-law 1012-2022), for a new 59-storey mixed-use building (with four levels of below-grade parking, and a total of 974 dwelling units, of which 78 units are affordable rental units), by reducing the minimum number of residential visitor parking spaces and long-term bicycle parking spaces.

    90 m away · filed Sep 22, 2025 · Approved

  • 200 Queens Quay W · Minor variance

    To alter the development standards (as approved under Site Specific Zoning By-law 1012-2022), for a new 59-storey mixed-use building, by reducing the minimum number of residential dwelling units that shall contain two or more bedrooms.

    90 m away · filed Oct 26, 2023 · Approved

  • 1 York St · Consent

    To obtain consent to sever portions of the land for the purpose of lot additions to correct a minor intrusion (west side balconies) into the commerical lands.

    210 m away · filed Sep 19, 2017 · Approved

  • 1 York St · Consent

    To obtain consent to sever portions of the land for the purpose of lot additions and to create various easements.

    210 m away · filed Jun 13, 2017 · Approved

Everything planned in Spadina-Fort York

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.