Toronto address · Ward 3, Etobicoke-Lakeshore
219 Sheldon Ave
The City of Toronto has 5 building permits since 2017 (2 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Small residential project · Multiple projects
Proposal to construct front addition, second storey addition and interior alterations to existing dwelling
Applied Apr 7, 2020 · issued Jun 10, 2020 · Permit 20 129437 BLD
- Inspections under way
Heating and ventilation
HVAC - Proposal to construct front addition, second storey addition and interior alterations to existing dwelling
Applied Apr 7, 2020 · issued Jun 10, 2020 · Permit 20 129437 HVA
- Closed
Plumbing
Plumbing - Proposal to construct front addition, second storey addition and interior alterations to existing dwelling
Applied Apr 7, 2020 · issued Jun 10, 2020 · completed Aug 20, 2021 · Permit 20 129437 PLB
- Closed
Drains and site services
Drain - Proposal to construct front addition, second storey addition and interior alterations to existing dwelling
Applied Apr 7, 2020 · issued Jun 10, 2020 · completed Aug 20, 2021 · Permit 20 129437 DRN
- Closed
Drains and site services · Back water valve (Sewer only)
Back Water Valve (Sewer only)
Applied Jan 26, 2017 · issued Jan 26, 2017 · completed Feb 2, 2017 · Permit 17 109223 DRN
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To construct a second storey addition above the existing dwelling.
Decision: Approved (hearing Dec 5, 2019)
Filed Nov 6, 2019 · File A0570/19EYK
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
493 Valermo Dr · Minor variance
140 m away · filed Jun 12, 2026 · Postponed
212 Alderbrae Ave · Minor variance
To construct a new duplex with an attached garage.
160 m away · filed Mar 20, 2025 · Refused
212 Alderbrae Ave · Consent
To obtain consent to sever the property into two undersized residential lots.
160 m away · filed Mar 20, 2025 · Refused
212 Alderbrae Ave · Minor variance
To construct a new duplex with an attached garage.
160 m away · filed Mar 20, 2025 · Refused
454 Valermo Dr · Minor variance
To construct a second storey west side platform.
110 m away · filed Oct 25, 2024 · Approved
493 Valermo Dr · Minor variance
To construct a basement walk-out and widen the existing driveway.
140 m away · filed Sep 2, 2024 · Approved
59 Lunness Rd · Minor variance
100 m away · filed Jul 4, 2024 · Application withdrawn
59 Lunness Rd · Minor variance
100 m away · filed Jul 4, 2024 · Application withdrawn
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.