Toronto address · Ward 19, Beaches-East York
22 Edgewood Ave
The City of Toronto has 6 building permits since 2017 (3 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Drains and site services · Back water valve (Sewer only)
Proposed installation of mainline backwater valve on the main sewer line.
Applied Sep 3, 2024 · issued Sep 9, 2024 · completed Nov 25, 2024 · Permit 24 207335 DRN
- Inspections under way
Small residential project · Deck
Proposal to replace rear deck.
Applied Dec 4, 2023 · issued Dec 8, 2023 · Permit 23 232501 BLD
- Closed
Plumbing
Plumbing - Proposed second storey rear addition over existing SFD.
Applied Aug 28, 2023 · issued Sep 15, 2023 · completed Nov 25, 2024 · Permit 23 194769 PLB
- Closed
Small residential project · Addition(s)
Proposed second storey rear addition over existing SFD.
Applied Aug 28, 2023 · issued Sep 6, 2023 · completed Nov 25, 2024 · Permit 23 194769 BLD
- Inspections under way
Small residential project · Interior alterations
Interior alterations to the ground floor - kitchen renovation, remove load bearing wall, new powder room, front closet and enclosing wall at existing den
Applied Feb 26, 2021 · issued Mar 12, 2021 · Permit 21 120721 BLD
- Inspections under way
Plumbing
Plumbing - Interior alterations to the ground floor - kitchen renovation, remove load bearing wall, new powder room, front closet and enclosing wall at existing den
Applied Feb 26, 2021 · issued Mar 12, 2021 · Permit 21 120721 PLB
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
10 storeys · 168 homes · Mixed use
320 m away · Rezoning · Approved · filed Apr 28, 2025
- Under review
6 storeys · 91 homes · Mixed use
320 m away · Site plan · Under review · filed Nov 7, 2021
Neighbours’ Committee of Adjustment files within 250 m
66 Edgewood Ave · Minor variance
To construct a new two-storey garden suite with a front basement walkout, a front ground floor entrance with external stairs, and north and south side second storey green roofs, in the rear yard of the lot. The existing two-storey detached main dwelling on the lot will remain unaltered.
170 m away · filed Jan 20, 2024 · Approved
55 Maughan Cres · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear one-storey addition, a rear uncovered deck, a new front porch and stairs, and an air conditioner on the rear wall. Also, to construct an ancillary building (shed) in the side (north) yard.
80 m away · filed Mar 10, 2023 · Approved
9 Maughan Cres · Minor variance
To alter the existing two-storey detached dwelling by constructing a two-storey side and rear addition (above and rear of the existing garage).
160 m away · filed Jan 19, 2023 · Approved
81 Robbins Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a one-storey addition along the side (east) and rear (south) walls, and a rear ground level deck.
150 m away · filed Oct 3, 2022 · Approved
43 Orchard Park Blvd · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a two-storey rear addition with a new rear ground-level deck and a new rear basement walkout.
240 m away · filed Dec 20, 2021 · Withdrawn
21 Hemlock Ave · Minor variance
To maintain the side deck and stairs that were constructed beyond the limits of a building permit.
110 m away · filed Nov 17, 2021 · Approved
73 Robbins Ave · Minor variance
To legalize and to maintain the ancillary building (shed) and covered deck that were constructed in the rear yard of the property without the benefit of a building permit.
170 m away · filed Oct 26, 2021 · Approved
36 Oliver Mews · Minor variance
To alter the existing three-storey townhouse by constructing a rear second storey deck.
200 m away · filed Jul 23, 2021 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.