Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 10, Spadina-Fort York

22 Lakeshore Ave

The City of Toronto has 5 building permits since 2017 (4 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    Plumbing - Proposal to construct new two-storey single family detached dwelling (139.86m2). Also see related demolition file 09-123368, and PAL file 07-235822.

    Applied Feb 18, 2010 · issued Feb 24, 2010 · Permit 09 123359 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal to construct new two-storey single family detached dwelling (139.86m2). Also see related demolition file 09-123368, and PAL file 07-235822.

    Applied Feb 18, 2010 · issued Feb 24, 2010 · Permit 09 123359 HVA

    Inspections under way
  • New house · New building

    Nov 17/09: Revision to floor heights (See revision clouds)Proposal to construct new two-storey single family detached dwelling (139.86m2). Also see related demolition file 09-123368, and PAL file 07-235822.

    Applied Nov 17, 2009 · issued Nov 24, 2009 · Permit 09 123359 BLD (revision 01)

    Revision issued
  • New house · New building

    Proposal to construct new two-storey single family detached dwelling (139.86m2). Also see related demolition file 09-123368, and PAL file 07-235822.

    Applied Apr 3, 2009 · issued Apr 22, 2009 · 1 home added · Permit 09 123359 BLD

    Inspections under way
  • Demolition

    Proposal to demolish existing one-storey single family detached dwelling (78.73m2). Also see replacement building file 09-123359, and PAL file 07-235822.

    Applied Apr 3, 2009 · issued May 1, 2009 · completed Jul 10, 2018 · Permit 09 123368 DEM

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 11 Third St · Minor variance

    To alter the existing one-and-one-half-storey detached dwelling by constructing a rear second storey addition. Also, to permit and maintain the existing rear ground floor deck with a trellis and stairs.

    200 m away · filed Feb 27, 2026 · Approved

  • 20 Withrow St · Minor variance

    To construct a temporary outdoor shelter pavilion (for community gatherings)/staging area (for supplies and equipment during the reconstruction of Wards Island Clubhouse).

    120 m away · filed May 16, 2025 · Approved

  • 2 Lakeshore Ave · Minor variance

    To alter the existing one-and-one-half-storey detached dwelling by constructing a rear two-storey addition (the existing rear one-storey addition will be demolished), a complete second storey addition (the existing roof and dormers will be demolished), and a new ground floor front and side (north) covered porch with front and rear stairs (the existing front porch will be demolished).

    240 m away · filed Aug 15, 2024 · Approved

  • 5 Fourth St · Minor variance

    To construct a new two-storey detached dwelling with a front porch, a front second storey balcony, and a rear and side ground floor deck having ramp access from the front lot line. A new rear yard accessory building will also be constructed.

    160 m away · filed Nov 5, 2021 · Withdrawn

Everything planned in Spadina-Fort York

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.