Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

220 Gilbert Ave

The City of Toronto has 3 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Proposed underpinning, basement finishing, interior alterations to existing ground floor, 2nd and 3rd floor additions, third floor deck, rear ground floor deck, basement walkout.

    Applied Mar 19, 2017 · issued Apr 18, 2017 · completed Nov 16, 2017 · Permit 17 130277 HVA

    Closed
  • Plumbing

    Plumbing - Proposed underpinning, basement finishing, interior alterations to existing ground floor, 2nd and 3rd floor additions, third floor deck, rear ground floor deck, basement walkout.

    Applied Mar 17, 2017 · issued Apr 18, 2017 · completed Nov 16, 2017 · Permit 17 130277 PLB

    Closed
  • Small residential project · Multiple projects

    Proposed underpinning, basement finishing, interior alterations to existing ground floor, 2nd and 3rd floor additions, third floor deck, rear ground floor deck, basement walkout.

    Applied Mar 17, 2017 · issued Apr 18, 2017 · completed Nov 16, 2017 · Permit 17 130277 BLD

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To construct a rear basement walk-out, a second and third floor addition, and a rear yard deck.

    Decision: Approved (hearing Jan 26, 2017)

    Filed Nov 9, 2016 · File A0875/16EYK

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 343 Blackthorn Ave · Minor variance

    To construct a new fourplex and a new as of right garden suite in the rear.

    240 m away · filed May 8, 2026 · Approved

  • 225 Caledonia Rd · Minor variance

    To construct a new one-storey detached ancillary building (one-car garage) in the rear yard, abutting the laneway. The existing garage will be demolished.

    200 m away · filed May 15, 2025 · Approved

  • 201 Gilbert Ave · Minor variance

    To construct a new one-storey detached ancillary building (one-car garage) in the rear yard of the existing two-storey dwelling, abutting the laneway.

    70 m away · filed May 12, 2025 · Approved

  • 66 Innes Ave · Minor variance

    To alter the existing one-storey detached dwelling by constructing a complete second storey addition. Also, to remove the enclosed front porch and construct a covered front porch.

    230 m away · filed May 31, 2024 · Approved

  • 225 Gilbert Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a two-storey rear and side (north) addition, a side (north) basement walkout, and a rear ground floor deck.

    40 m away · filed Feb 26, 2024 · Approved

  • 195 Gilbert Ave · Minor variance

    To construct a new one-storey ancillary building (detached garage), in the rear yard, abutting the laneway. The existing garage in the rear yard will be demolished.

    90 m away · filed Dec 29, 2023 · Approved

  • 289 Blackthorn Ave · Minor variance

    To alter the existing two-storey townhouse dwelling by constructing a two-storey rear addition with a ground floor deck, and to reconstruct the front porch stairs. The existing one-storey rear addition will be demolished.

    230 m away · filed May 3, 2022 · Approved

  • 229 Caledonia Rd · Minor variance

    To alter the existing two-storey detached dwelling by constructing a complete third storey addition with a deck, a rear ground level deck, a front second storey deck, and a rear second storey balcony.

    190 m away · filed Apr 14, 2022 · Approved

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.