Toronto address · Ward 9, Davenport
220 Gilbert Ave
The City of Toronto has 3 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
HVAC - Proposed underpinning, basement finishing, interior alterations to existing ground floor, 2nd and 3rd floor additions, third floor deck, rear ground floor deck, basement walkout.
Applied Mar 19, 2017 · issued Apr 18, 2017 · completed Nov 16, 2017 · Permit 17 130277 HVA
- Closed
Plumbing
Plumbing - Proposed underpinning, basement finishing, interior alterations to existing ground floor, 2nd and 3rd floor additions, third floor deck, rear ground floor deck, basement walkout.
Applied Mar 17, 2017 · issued Apr 18, 2017 · completed Nov 16, 2017 · Permit 17 130277 PLB
- Closed
Small residential project · Multiple projects
Proposed underpinning, basement finishing, interior alterations to existing ground floor, 2nd and 3rd floor additions, third floor deck, rear ground floor deck, basement walkout.
Applied Mar 17, 2017 · issued Apr 18, 2017 · completed Nov 16, 2017 · Permit 17 130277 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To construct a rear basement walk-out, a second and third floor addition, and a rear yard deck.
Decision: Approved (hearing Jan 26, 2017)
Filed Nov 9, 2016 · File A0875/16EYK
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
343 Blackthorn Ave · Minor variance
To construct a new fourplex and a new as of right garden suite in the rear.
240 m away · filed May 8, 2026 · Approved
225 Caledonia Rd · Minor variance
To construct a new one-storey detached ancillary building (one-car garage) in the rear yard, abutting the laneway. The existing garage will be demolished.
200 m away · filed May 15, 2025 · Approved
201 Gilbert Ave · Minor variance
To construct a new one-storey detached ancillary building (one-car garage) in the rear yard of the existing two-storey dwelling, abutting the laneway.
70 m away · filed May 12, 2025 · Approved
66 Innes Ave · Minor variance
To alter the existing one-storey detached dwelling by constructing a complete second storey addition. Also, to remove the enclosed front porch and construct a covered front porch.
230 m away · filed May 31, 2024 · Approved
225 Gilbert Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a two-storey rear and side (north) addition, a side (north) basement walkout, and a rear ground floor deck.
40 m away · filed Feb 26, 2024 · Approved
195 Gilbert Ave · Minor variance
To construct a new one-storey ancillary building (detached garage), in the rear yard, abutting the laneway. The existing garage in the rear yard will be demolished.
90 m away · filed Dec 29, 2023 · Approved
289 Blackthorn Ave · Minor variance
To alter the existing two-storey townhouse dwelling by constructing a two-storey rear addition with a ground floor deck, and to reconstruct the front porch stairs. The existing one-storey rear addition will be demolished.
230 m away · filed May 3, 2022 · Approved
229 Caledonia Rd · Minor variance
To alter the existing two-storey detached dwelling by constructing a complete third storey addition with a deck, a rear ground level deck, a front second storey deck, and a rear second storey balcony.
190 m away · filed Apr 14, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.