Toronto address · Ward 3, Etobicoke-Lakeshore
2230 Lake Shore Blvd W
The City of Toronto has 17 building permits since 2017 (8 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Designated structure · Sign building permit related
Proposal to erect and display three illuminated wall signs displayign static copy on the first storye of the southeast elevation, two measuring 0.91 m by 0.91 m and one measuring 3.63 m by 0.71 m. ***PHYSIO FIRST*****
Applied Jan 10, 2018 · issued Feb 2, 2018 · completed Mar 29, 2018 · Permit 18 102662 DST
- Closed
Heating and ventilation
Rev 01 - HVAC - Convert the existing vacant space to a Top Modern Nail Salon
Applied Oct 3, 2017 · issued Oct 5, 2017 · completed Jun 9, 2026 · Permit 17 124893 HVA (revision 01)
- Inspections under way
Addition or alteration · Interior alterations
Proposal to construct interior alterations for tenant fit-up Physio Therapy
Applied Sep 27, 2017 · issued Nov 16, 2017 · Permit 17 239677 BLD
- Inspections under way
Plumbing
Plumbing - Proposal to construct interior alterations for tenant fit-up Physio Therapy
Applied Sep 27, 2017 · issued Nov 16, 2017 · Permit 17 239677 PLB
- Inspections under way
Heating and ventilation
HVAC - Proposal to construct interior alterations for tenant fit-up Physio Therapy
Applied Sep 27, 2017 · issued Nov 16, 2017 · Permit 17 239677 HVA
- Closed
Plumbing
Plumbing - Convert the existing vacant space to a Top Modern Nail Salon
Applied Mar 6, 2017 · issued Apr 4, 2017 · completed Dec 27, 2017 · Permit 17 124893 PLB
- Closed
Addition or alteration · Interior alterations
Convert the existing vacant space to a Top Modern Nail Salon
Applied Mar 6, 2017 · issued Apr 4, 2017 · completed Jan 7, 2026 · Permit 17 124893 BLD
- Closed
Heating and ventilation
HVAC - Convert the existing vacant space to a Top Modern Nail Salon
Applied Mar 6, 2017 · issued Apr 6, 2017 · completed Jun 9, 2026 · Permit 17 124893 HVA
- Revocation pending
Drains and site services
Drain - To construct one 44 storey condominium building with townhouses, commercial complex and 4 levels of underground parking garage. Inside underground drains Inside Drains (Underground)
Applied May 7, 2010 · issued May 20, 2010 · Permit 09 183571 DRN
- Inspections under way
Heating and ventilation
HVAC - To construct one 44 storey condominium building with townhouses, commercial complex and 4 levels of underground parking garage.
Applied Oct 30, 2009 · issued Aug 12, 2011 · Permit 09 183571 HVA
- Inspections under way
Plumbing
Plumbing - To construct one 44 storey condominium building with townhouses, commercial complex and 4 levels of underground parking garage.
Applied Oct 30, 2009 · issued Aug 12, 2011 · Permit 09 183571 PLB
- Revocation pending
Drains and site services · Inside and outside drains
Drain - To construct one 44 storey condominium building with townhouses, commercial complex and 4 levels of underground parking garage. Site Servicing Only
Applied Oct 30, 2009 · issued Jan 15, 2010 · Permit 09 183571 STS
Show 5 more permits
- Inspections under way
New building
To construct one 44 storey condominium building with 9 townhouse units, commercial complex and 4 levels of underground parking garage.See 09-160040-BLD for shoring
Applied Oct 29, 2009 · issued Feb 23, 2012 · 342 homes added · Permit 09 183571 BLD
- Inspections under way
Addition or alteration · Shoring
Shoring for four levels of uderground garage for future development of residential / townhouses / commercial building for "Beyond the Sea" - Phase 3. - SHORING ONLY RE: 09-183571
Applied Aug 19, 2009 · issued Nov 23, 2009 · Permit 09 160040 BLD
- Closed
Heating and ventilation · Special ventilation system
Increase kitchen exhaust canopy and new washroom exhaust fans in an existing restaurant
Applied Jun 15, 2006 · issued Mar 14, 2014 · completed Sep 11, 2026 · Permit 06 147225 MSA
- Inspections under way
Plumbing · Fixtures/Roof Drains: other
New hub drain and grease interceptor in the kitchen of an existing restaurant.
Applied Jun 15, 2006 · issued Jul 13, 2006 · Permit 06 147234 PSA
- Closed (dormant)
Plumbing · Other
''wharf fish market'' fixtures
Applied Sep 1, 1998 · issued Oct 6, 1998 · completed Jun 8, 2026 · Permit 98 083893 PLB
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
2256 Lake Shore Boulevard West
18 storeys · 594 homes · Mixed use
170 m away · Site plan · Under review · filed Sep 7, 2022
- Under review
2150-2194 Lake Shore Boulevard West and 23 Park Lawn Road
Not stated in the file
220 m away · Site plan · Under review · filed Apr 7, 2022
- Under review
2189 Lake Shore Boulevard West
59 storeys · Mixed use
250 m away · Site plan · Under review · filed Apr 27, 2022
- Under review
Neighbours’ Committee of Adjustment files within 250 m
2200 Lake Shore Blvd W · Consent
To obtain consent to a partial discharge of a mortgage and to obtain a construction mortgage.
150 m away · filed Nov 9, 2015 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.