Toronto address · Ward 10, Spadina-Fort York
229 Ossington Ave
The City of Toronto has 3 building permits since 2017 (2 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Designated structure · Sign building permit related
To erect and display one illuminated projecting sign.**S**
Applied Sep 8, 2017 · issued Sep 21, 2017 · completed Sep 25, 2017 · Permit 17 229464 DST
- Inspections under way
Heating and ventilation
HVAC - Interior alterations to existing restaurant on the ground floor. 40 seats. Tenant - "Yours Truly".
Applied Nov 18, 2011 · issued Nov 24, 2011 · Permit 11 312126 HVA
- Inspections under way
Addition or alteration · Other
Proposal to replace existing front facade window on ground floor (restaurant) and two new window openings with balcony on second floor (dwelling unit).
Applied Jul 21, 2011 · issued Aug 31, 2011 · Permit 11 242982 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
10 storeys · 74 homes · Residential
20 m away · Site plan · Under review · filed Apr 1, 2026
Neighbours’ Committee of Adjustment files within 250 m
32 Argyle St · Minor variance
To alter the existing two-storey semi-detached townhouse dwelling by converting it to a semi-detached houseplex containing two dwelling units, by constructing a front porch with stairs, a front basement walkout, a rear two-storey addition (with a basement addition below), and a third storey addition with front and rear terraces (above the second storey). The existing rear two-storey and one-storey additions of the main dwelling will be demolished. Also, to alter the existing one-storey detached ancillary building (one-car garage abutting the laneway and Givins Street) in the rear yard by cons…
240 m away · filed Aug 28, 2026 · Hearing scheduled
303 Shaw St · Minor variance
220 m away · filed Jun 25, 2026 · Postponed
1083-1085 Dundas St W · Minor variance
To permit an eating establishment to occupy the entire ground floor area of the one-storey commercial building. The existing seven parking spaces, located on the vacant lands municipally known as 14R Halton Street, will be maintained and unaltered.
120 m away · filed Mar 2, 2026 · Refused
34 Grove Ave · Minor variance
To construct a new three-storey detached dwelling with a covered front porch, a front walkout basement, a front third storey terrace, and a rear third storey balcony. Also, to construct a two-storey detached ancillary building (containing a two-car garage with car lift and storage area), in the rear yard, abutting Skey Lane.
240 m away · filed Sep 3, 2025 · Refused
118 Givins St · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by enclosing a portion of the existing front porch. Also, to construct a front second storey balcony.
130 m away · filed Jun 11, 2025 · Approved
44 Argyle St · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey addition, and a front second storey balcony.
220 m away · filed May 13, 2025 · Approved
166 Ossington Ave · Minor variance
To legalize and maintain the separate ground-level entrance that was constructed without an authorized building permit. The existing dwelling unit will be maintained.
130 m away · filed Sep 5, 2024 · Approved
36 Halton St · Minor variance
To convert the existing three-storey (heritage) building into an apartment building by constructing a rear four-storey addition (north block), a side (east) three-storey addition (east wing), and a side (west) three-storey addition (west wing). There will be a total of 48 dwelling units on the lot. This proposal is subject to a Site Plan Control Application (not submitted).
90 m away · filed Jul 25, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.