The City of Toronto has 12 building permits since 2017 (10 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Partial permit · Partial permit - shoring

    Part Permit - The proposed development consists of a Central Podium + Tower (26 storey's + MPH) This permit covers work associated with the Central Podium/Tower (23 Buckingham Street for the Central Tower residential, 29 Buckingham Street for the retail and 35 Buckingham Street for the office).

    Applied Aug 15, 2023 · Permit 22 232879 SHO

    Under review
  • Alternative solution

    It is proposed to provide 65 mm standpipe system hose valve connections in general conformance with the2015 National Building Code (NBC) and the 2013 Edition of NFPA 14, `Standard for Installation ofStandpipe and Hose System¿ (as referenced by the NBC) in this fully sprinklered building.The 65 mm hose connections will be provided in lieu of hose stations (38 mm and 65 mm hose valves, 38mm hose and nozzle) required by the 2012 Ontario Building Code. The standpipe system and hoseconnections will be located within exit stair enclosures.

    Applied May 17, 2023 · completed May 18, 2023 · Permit 23 146979 ALT

    Cancelled
  • Alternative solution

    It is proposed to provide 65 mm standpipe system hose valve connections in general conformance with the2015 National Building Code (NBC) and the 2013 Edition of NFPA 14, `Standard for Installation ofStandpipe and Hose System¿ (as referenced by the NBC) in this fully sprinklered building.The 65 mm hose connections will be provided in lieu of hose stations (38 mm and 65 mm hose valves, 38mm hose and nozzle) required by the 2012 Ontario Building Code. The standpipe system and hoseconnections will be located within exit stair enclosures.

    Applied May 17, 2023 · Permit 23 146981 ALT

    Application received
  • Alternative solution

    It is proposed to provide 65 mm standpipe system hose valve connections in general conformance with the2015 National Building Code (NBC) and the 2013 Edition of NFPA 14, `Standard for Installation ofStandpipe and Hose System¿ (as referenced by the NBC) in this fully sprinklered building.The 65 mm hose connections will be provided in lieu of hose stations (38 mm and 65 mm hose valves, 38mm hose and nozzle) required by the 2012 Ontario Building Code. The standpipe system and hoseconnections will be located within exit stair enclosures.

    Applied May 17, 2023 · Permit 23 146976 ALT

    Application received
  • Plumbing

    Plumbing - The proposed development consists of 3 levels of underground parking, North Tower (12 storey's +MPH) (39 Buckingham Street).

    Applied Nov 24, 2022 · Permit 22 232714 PLB

    Under review
  • Heating and ventilation

    HVAC - The proposed development consists of 3 levels of underground parking, North Tower (12 storey's +MPH) (39 Buckingham Street).

    Applied Nov 24, 2022 · Permit 22 232714 HVA

    Under review
  • New building

    The proposed development consists of 3 levels of underground parking, North Tower (12 storey's +MPH) (39 Buckingham Street).

    Applied Nov 24, 2022 · 106 homes added · Permit 22 232714 BLD

    Under review
  • Plumbing

    Plumbing - The proposed development consists of a Central Podium + Tower (26 storey's + MPH) This permit covers work associated with the Central Podium/Tower (23 Buckingham Street for the Central Tower residential, 29 Buckingham Street for the retail and 35 Buckingham Street for the office).

    Applied Nov 24, 2022 · Permit 22 232879 PLB

    Under review
  • New building

    The proposed development consists of a Central Podium + Tower (26 storey's + MPH) This permit covers work associated with the Central Podium/Tower (23 Buckingham Street for the Central Tower residential, 29 Buckingham Street for the retail and 35 Buckingham Street for the office).

    Applied Nov 24, 2022 · 264 homes added · Permit 22 232879 BLD

    Under review
  • Heating and ventilation

    HVAC - The proposed development consists of a Central Podium + Tower (26 storey's + MPH) This permit covers work associated with the Central Podium/Tower (23 Buckingham Street for the Central Tower residential, 29 Buckingham Street for the retail and 35 Buckingham Street for the office).

    Applied Nov 24, 2022 · Permit 22 232879 HVA

    Under review
  • Addition or alteration · Shoring

    Proposed installation of shoring system for soil remediation purposes

    Applied Apr 25, 2022 · issued Oct 14, 2022 · Permit 22 138238 BLD

    Permit issued
  • Demolition

    Demolition of existing vacant structure/building

    Applied Mar 4, 2022 · issued Apr 26, 2022 · completed Jun 5, 2023 · Permit 22 119767 DEM

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 181 Melrose St · Minor variance

    To construct a two-storey west side addition and a second storey rear addition.

    200 m away · filed Mar 13, 2026 · Approved

  • 4 Milton St · Minor variance

    To construct a two-storey rear addition.

    190 m away · filed Oct 10, 2025 · Approved

  • 162 Melrose St · Minor variance

    To construct a new detached dwelling with an attached garage.

    220 m away · filed Oct 18, 2024 · Approved

  • 162 Melrose St · Minor variance

    To construct a new detached dwelling with an attached garage.

    220 m away · filed Oct 18, 2024 · Approved

  • 162 Melrose St · Consent

    To obtain consent to sever the property into two undersized residential lots.

    220 m away · filed Oct 18, 2024 · Approved

  • 150 Melrose St · Minor variance

    To construct a new garden suite in the rear yard.

    250 m away · filed Jan 11, 2024 · Approved

  • 21-25 Windsor St · Consent

    To obtain consent to sever the lot into three lots and to create multiple easements/ right-of-ways.

    160 m away · filed Aug 21, 2023 · Approved

  • 2 Audley St · Minor variance

    To construct a 27 and 23-storey mixed use building, connected by a shared 4 to 8-storey podium.

    150 m away · filed Jul 27, 2023 · Deferred

Everything planned in Etobicoke-Lakeshore

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.