Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 19, Beaches-East York

23 Glenburn Ave

The City of Toronto has 5 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Multiple projects

    REV01- Revision to existing permit as per bubbled drawings attached.Proposed basement alterations, interior alterations, front bay window addition, rear deck and 2 storey rear addition.

    Applied Aug 14, 2018 · issued Aug 24, 2018 · completed Jun 27, 2019 · Permit 17 193440 BLD (revision 01)

    Closed
  • Heating and ventilation

    HVAC - Proposed basement alterations, interior alterations, front bay window addition, rear deck and 2 storey rear addition.

    Applied Mar 12, 2018 · issued Mar 14, 2018 · completed Jun 27, 2019 · Permit 17 193440 HVA

    Closed
  • Plumbing

    Plumbing - Proposed basement alterations, interior alterations, front bay window addition, rear deck and 2 storey rear addition.

    Applied Jul 6, 2017 · issued Dec 5, 2017 · completed Jun 27, 2019 · Permit 17 193440 PLB

    Closed
  • Small residential project · Multiple projects

    Proposed basement alterations, interior alterations, front bay window addition, rear deck and 2 storey rear addition.

    Applied Jul 6, 2017 · issued Dec 5, 2017 · completed Jun 27, 2019 · Permit 17 193440 BLD

    Closed
  • Drains and site services

    Drain - Proposed basement alterations, interior alterations, front bay window addition, rear deck and 2 storey rear addition.

    Applied Jul 6, 2017 · issued Dec 5, 2017 · completed Jun 27, 2019 · Permit 17 193440 DRN

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 68 Glencrest Blvd · Minor variance

    To alter the existing one-storey ancillary building (detached garage, abutting Glencrest Boulevard and Squires Avenue) by constructing a second storey addition to contain a garden suite. There will be an exterior staircase along the north wall to access this garden suite.

    220 m away · filed Oct 20, 2023 · Approved

  • 2949 St Clair Ave E · Minor variance

    To construct a new three-storey detached dwelling with an integrated garage and a rear second storey balcony.

    150 m away · filed Jan 4, 2023 · Approved

  • 2915 St Clair Ave E · Minor variance

    Proposing to add a vehicle dealership that would use 3/7 parking spaces on the existing lot. The existing autobody repair shop is a legal non-conforming use.

    220 m away · filed Oct 3, 2022 · Postponed

  • 68 Glencrest Blvd · Minor variance

    To alter the existing one-storey detached dwelling by constructing a complete second storey addition and to replace the existing attached garage with a two-storey rear addition. Also, to construct a one-storey ancillary building (detached garage) in the rear yard, gaining access from Squires Avenue.

    220 m away · filed Apr 20, 2022 · Approved

  • 154 Pitt Ave · Minor variance

    To demolish existing dwelling and construct new two-storey dwelling.

    220 m away · filed Nov 10, 2021 · Application withdrawn

  • 154 Pitt Ave · Consent

    To obtain consent to sever the property into two residential lots. Existing dwelling to be demolished and two new detached dwellings to be constructed.

    220 m away · filed Nov 10, 2021 · Application withdrawn

  • 154 Pitt Ave · Minor variance

    To demolish existing dwelling and construct new two-storey dwelling.

    220 m away · filed Nov 10, 2021 · Application withdrawn

  • 75 Holmstead Ave · Minor variance

    To alter the existing one-storey detached dwelling by constructing a complete second storey addition, a rear two-storey addition, a front porch, and a rear ground floor deck.

    220 m away · filed Aug 15, 2021 · Approved

Everything planned in Beaches-East York

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.