Toronto address · Ward 17, Don Valley North
23 Maureen Dr
The City of Toronto has 3 building permits since 2017 (1 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Interior alterations
Rev 01 : Proposal for Ground Floor; kitchen redesign, removal of non-load bearing walls and alternating existing powder room plumbing fixtures. Second Floor; added new stacked washer and dryer. Proposal for interior alterations to an existing 2 storey SFD-detached dwelling.
Applied Mar 31, 2025 · issued Apr 2, 2025 · completed Nov 18, 2025 · Permit 24 197924 BLD (revision 01)
- Inspections under way
Plumbing
Plumbing - Proposal for interior alterations to an existing 2 storey SFD-detached dwelling.
Applied Aug 14, 2024 · issued Aug 21, 2024 · Permit 24 197924 PLB
- Closed
Small residential project · Interior alterations
Proposal for interior alterations to an existing 2 storey SFD-detached dwelling.
Applied Aug 14, 2024 · issued Aug 21, 2024 · completed Nov 18, 2025 · Permit 24 197924 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
49 storeys · 1,184 homes · Residential
110 m away · Rezoning · Under review · filed Mar 17, 2022
- Approved
1001-1019 Sheppard Avenue East
31 storeys · 990 homes · Residential
260 m away · Condominium · Approved · filed May 29, 2025
- Under review
48 storeys · 1,238 homes · Mixed use
270 m away · Site plan · Under review · filed Mar 21, 2024
- Under review
63-75 Ethennonnhawahstihnen' Lane and 1001 Sheppard Avenue East
39 storeys · 867 homes · Mixed use
300 m away · Site plan · Under review · filed Mar 25, 2024
- Under appeal
33 storeys · 452 homes · Mixed use
410 m away · Site plan · Under appeal · filed Mar 10, 2022
- Under appeal
32 storeys · 705 homes · Mixed use
420 m away · Rezoning · Under appeal · filed Oct 14, 2022
Neighbours’ Committee of Adjustment files within 250 m
23 Ambrose Rd · Minor variance
To alter the existing detached dwelling by constructing a second storey addition, a rear two-storey addition and a rear deck. Please note that more than 50% of the existing building's main walls are to be demolished, therefore, the proposal is considered a new dwelling. NOTE: This application was previously deferred at the Committee of Adjustment hearing on October 23, 2025.
230 m away · filed Sep 10, 2025 · Approved
35 Blue Ridge Rd · Minor variance
To construct a two storey rear addition, deck and basement walkout. Please note, the applicastion was deferred on February 1. 2024, to allow the applicant to revise the plans.
190 m away · filed Nov 30, 2023 · Approved
1019 Sheppard Ave E · Consent
To permit non-exclusive easements for pedestrian and vehicular access over portions of Canadian Tire Corporation (CTC) land, and Canadian Tire Properties Inc. (CTPI) land, in favour of the Concord site (25, 35, 55, 65 and 75 Billes Heights and 18, 20, 28, 32, 38, 62 and 68 Esther Shiner Boulevard). Related planning files (Concord site). Related planning files include A0670/20NY, and 19 155827 NY 17 SA.
180 m away · filed Feb 16, 2022 · Approved
1009 Sheppard Ave E · Consent
To permit non-exclusive easements for pedestrian and vehicular access over portions of Canadian Tire Corporation (CTC) land, and Canadian Tire Properties Inc. (CTPI) land, in favour of the Concord site (25, 35, 55, 65 and 75 Billes Heights and 18, 20, 28, 32, 38, 62 and 68 Esther Shiner Boulevard). Related planning files (Concord site). Related planning files include A0670/20NY, and 19 155827 NY 17 SA.
160 m away · filed Feb 16, 2022 · Approved
1001 Sheppard Ave E · Minor variance
A mixed use building with three towers (19, 31 and 27 storeys) and a total gross floor area of 82,241.56 sq.m. 990 dwelling units, 754 bicycle parking spaces, 1,079 parking spaces and 3 loading space are proposed.
220 m away · filed Dec 15, 2020 · Approved
21 Arrowstook Rd · Minor variance
To construct a new dwelling.
120 m away · filed Mar 1, 2019 · Approved
1001 Sheppard Ave E · Minor variance
To legalize and maintain the existing undersized underground parking spaces.
220 m away · filed Dec 6, 2018 · Approved
1001 Sheppard Ave E · Minor variance
To construct two towers of 33 and 36 storeys linked by a podium containing lobby and amenity space together with townhouse units, total 692 dwelling units and 674 parking spaces.
220 m away · filed Jun 29, 2017 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.