The City of Toronto has 7 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Proposal to construct third storey addition and interior alterations.**** See CofA Decision ****

    Applied Sep 24, 2020 · issued Sep 28, 2020 · completed Jun 14, 2021 · Permit 20 176348 HVA

    Closed
  • Plumbing

    Plumbing - Proposal to construct third storey addition and interior alterations.

    Applied Aug 4, 2020 · issued Aug 13, 2020 · completed Jun 14, 2021 · Permit 20 176348 PLB

    Closed
  • Small residential project · Other

    Proposal to construct third storey addition and interior alterations.**** See CofA Decision ****

    Applied Aug 4, 2020 · issued Aug 13, 2020 · completed Jun 22, 2021 · Permit 20 176348 BLD

    Closed
  • Drains and site services · Back water valve (Sewer only)

    Applied Mar 11, 2020 · issued Mar 11, 2020 · completed Apr 20, 2020 · Permit 20 124910 DRN

    Closed
  • Drains and site services

    Drain - Proposed basement interior alterations and underpinning

    Applied Jan 31, 2020 · issued Feb 11, 2020 · completed Jun 14, 2021 · Permit 20 110884 DRN

    Closed
  • Plumbing

    Plumbing - Proposed basement interior alterations and underpinning

    Applied Jan 31, 2020 · issued Feb 11, 2020 · completed Jun 14, 2021 · Permit 20 110884 PLB

    Closed
  • Small residential project · Multiple projects

    Proposed basement interior alterations and underpinning

    Applied Jan 31, 2020 · issued Feb 11, 2020 · completed Jun 14, 2021 · Permit 20 110884 BLD

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To alter the existing 2½ storey detached dwelling by performing interior renovations and constructing a rear one-storey addition, rear second storey roof terrace, and a third storey addition.

    Decision: Approved (hearing Mar 11, 2020)

    Filed Oct 30, 2019 · File A1132/19TEY

    Closed

What’s planned nearby

Development sites within 500 m

  • 157 Hallam Street

    4 homes · Residential

    240 m away · Condominium · Approved · filed Jun 18, 2025

    Approved

Neighbours’ Committee of Adjustment files within 250 m

  • 195 Hallam St · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a complete third storey addition with a rear balcony.

    110 m away · filed Jan 15, 2026 · Approved

  • 815 Gladstone Ave · Minor variance

    To alter the existing two-storey detached dwelling (duplex) by converting the existing front integral garage into habitable space. Also, to install a front yard parking pad (to replace the existing reverse slope driveway, which will be filled in), abutting Gladstone Avenue.

    130 m away · filed Apr 17, 2025 · Application withdrawn

  • 725 Gladstone Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear second storey addition above the existing rear one-storey addition with a Juliet balcony, that will cantilever over the existing rear basement walkout. The existing ancillary building (detached garage), in the rear yard, abutting the laneway, will be maintained and unaltered.

    200 m away · filed Jun 7, 2024 · Approved

  • 205 Westmoreland Ave · Minor variance

    To convert the existing two-and-one-half-storey semi-detached dwelling into a duplex by constructing a rear two-storey addition, a rear ground floor deck, a covered front porch with a second storey balcony. Also, to construct a new two-storey ancillary building (one car lift from a basement level and one laneway suite with a second storey balcony), in the rear yard, abutting the laneway. There will be a total of three residential dwelling units on this lot (two units within the main dwelling and one unit within the ancillary building).

    240 m away · filed Apr 2, 2024 · Approved

  • 181 Hallam St · Minor variance

    To alter the existing two-storey townhouse dwelling by reconstructing and enlarging the rear one-storey addition with a rear ground floor deck and reconstructing the rear basement walkout.

    170 m away · filed Jan 23, 2024 · Approved

  • 216 Westmoreland Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear third storey addition with a rear third storey deck.

    210 m away · filed Nov 16, 2023 · Approved

  • 208 Bartlett Ave · Minor variance

    To construct a new four-storey detached apartment building with front and rear balconies on the second, third and fourth storeys, as well as two parking spaces in the rear yard (accessed from Hallam Street). There will be a total of 8 dwelling units (seven one-bedroom and one two-bedroom units) on this lot. All existing buildings will be demolished.

    90 m away · filed Nov 2, 2023 · Approved

  • 314 Westmoreland Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling (currently under construction, as approved by Minor Variance Application Number A1089/21TEY) by constructing a rear exterior staircase (three levels). Also, to install a secondary suite on the second and third storeys.

    250 m away · filed Oct 30, 2023 · Approved

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.