Toronto address · Ward 9, Davenport
233 Salem Ave
The City of Toronto has 2 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Unknown
Construct rear basement entrance and interior partition walls for basement washroom
Applied Oct 15, 1990 · issued Oct 15, 1990 · completed Sep 23, 2026 · Permit 90 025135 BLD
- Closed
Plumbing · Unknown
Install new fixtures base: 1 wb, 1 bt, 1 wc, 1 laundry tub, 1 fd replace 4" building drains. Cost incl. 312564
Applied Oct 4, 1990 · issued Oct 5, 1990 · completed Sep 23, 2026 · Permit 90 024707 PLB
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
- Approved
Neighbours’ Committee of Adjustment files within 250 m
195 Hallam St · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a complete third storey addition with a rear balcony.
40 m away · filed Jan 15, 2026 · Approved
975 Dovercourt Rd · Minor variance
To convert the existing two-storey mixed-use building into a residential building (fourplex) by constructing a rear two-storey addition with a ground floor deck and stairs, and second and third storey balconies. Also, to construct a complete third storey addition. In addition, to construct a two-storey ancillary building to contain one garden suite. There will be a total of five residential dwelling units on this lot (four dwelling units within the main house and one dwelling unit within the ancillary building).
210 m away · filed Jan 20, 2025 · Deferred
725 Gladstone Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear second storey addition above the existing rear one-storey addition with a Juliet balcony, that will cantilever over the existing rear basement walkout. The existing ancillary building (detached garage), in the rear yard, abutting the laneway, will be maintained and unaltered.
210 m away · filed Jun 7, 2024 · Approved
205 Westmoreland Ave · Minor variance
To convert the existing two-and-one-half-storey semi-detached dwelling into a duplex by constructing a rear two-storey addition, a rear ground floor deck, a covered front porch with a second storey balcony. Also, to construct a new two-storey ancillary building (one car lift from a basement level and one laneway suite with a second storey balcony), in the rear yard, abutting the laneway. There will be a total of three residential dwelling units on this lot (two units within the main dwelling and one unit within the ancillary building).
110 m away · filed Apr 2, 2024 · Approved
181 Hallam St · Minor variance
To alter the existing two-storey townhouse dwelling by reconstructing and enlarging the rear one-storey addition with a rear ground floor deck and reconstructing the rear basement walkout.
50 m away · filed Jan 23, 2024 · Approved
216 Westmoreland Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear third storey addition with a rear third storey deck.
70 m away · filed Nov 16, 2023 · Approved
208 Bartlett Ave · Minor variance
To construct a new four-storey detached apartment building with front and rear balconies on the second, third and fourth storeys, as well as two parking spaces in the rear yard (accessed from Hallam Street). There will be a total of 8 dwelling units (seven one-bedroom and one two-bedroom units) on this lot. All existing buildings will be demolished.
140 m away · filed Nov 2, 2023 · Approved
27 Southview Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by a complete third storey addition, and a rear one-storey with a roof deck above. Also, to reconstruct the front porch and stairs.
220 m away · filed Jul 21, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.