Toronto address · Ward 19, Beaches-East York
234 Queensdale Ave
The City of Toronto has 4 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
HVAC - Proposal to perform interior alterations to all floor levels.
Applied Feb 26, 2025 · issued Mar 10, 2025 · completed Sep 1, 2026 · Permit 25 121920 HVA
- Closed
Plumbing
Plumbing - Proposal to perform interior alterations to all floor levels.
Applied Feb 26, 2025 · issued Mar 4, 2025 · completed Sep 1, 2026 · Permit 25 121920 PLB
- Closed
Small residential project · Interior alterations
Proposal to perform interior alterations to all floor levels.
Applied Feb 26, 2025 · issued Mar 4, 2025 · completed Sep 1, 2026 · Permit 25 121920 BLD
- Closed
Drains and site services
Drain - Proposal to perform interior alterations to all floor levels.
Applied Feb 26, 2025 · issued Mar 4, 2025 · completed Sep 1, 2026 · Permit 25 121920 DRN
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
478 Milverton Blvd · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a front one-storey addition (porch enclosure).
240 m away · filed Apr 28, 2026 · Approved
27 Frater Ave · Minor variance
To construct a new three-storey detached dwelling (basement level is considered the first storey), with an integral garage and a widened driveway (located on the east side), a front second storey covered porch with stairs, a rear second storey deck with stairs, and a rear first storey walkout.
160 m away · filed Jan 28, 2026 · Approved
701 Sammon Ave · Minor variance
To alter the existing two-storey semi-detached dwelling (houseplex) by enclosing the front porch into habitable space, and to construct a front basement walkout, a rear two-storey addition, as well as a rear ground floor deck with stairs. There will be a total of two residential dwelling units on this lot (one unit occupying the basement level, and one unit occupying the first and second levels).
60 m away · filed Jan 21, 2026 · Approved
564 Milverton Blvd · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition (mudroom) with stairs, in line with the existing rear one-storey partial addition.
200 m away · filed Jan 16, 2026 · Approved
156 Glebemount Ave · Minor variance
To alter the existing two-storey mixed use building by converting the ground level commercial unit into one residential dwelling unit. There will be a total of three residential dwelling units on this lot.
140 m away · filed Jun 3, 2025 · Refused
183 Glebemount Ave · Minor variance
To construct a new three-storey detached dwelling with a front covered porch with stairs, a front integral garage, a rear first storey walkout, and a rear second storey deck with stairs. There will be a total of two residential dwelling units on this lot (one unit occupying the first level, and one unit on the second and third levels).
210 m away · filed May 16, 2025 · Approved
274 Queensdale Ave · Minor variance
To permit the existing enclosed front porch that was converted into habitable space of the two-storey detached dwelling.
220 m away · filed Mar 13, 2025 · Approved
236 Queensdale Ave · Minor variance
To alter the existing one-storey detached dwelling by constructing a complete second storey addition, a front porch, and a rear ground floor deck with stairs.
10 m away · filed Oct 17, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.