Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 10, Spadina-Fort York

235 Ossington Ave

The City of Toronto has 3 building permits since 2017 (1 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing · Backflow prevention devices (Water only)

    Proposal to install a backflow prevention device in an existing commercial building.

    Applied Aug 18, 2021 · issued Sep 13, 2021 · completed Nov 28, 2022 · Permit 21 200384 PSA

    Closed
  • Designated structure · Sign building permit related

    To erect and display one illuminated wall sign.****CIBC****

    Applied Dec 3, 2019 · completed Feb 20, 2020 · Permit 19 254667 DST

    Cancelled
  • Addition or alteration · Interior alterations

    Removal of existing banking hall furniture and replacement with new digital banking furniture and light fixtures including finishes throughout the public areas. Electrical and minor mechanical work.

    Applied Jun 4, 2019 · issued Jul 3, 2019 · Permit 19 165691 BLD

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 303 Shaw St · Minor variance

    220 m away · filed Jun 25, 2026 · Postponed

  • 1083-1085 Dundas St W · Minor variance

    To permit an eating establishment to occupy the entire ground floor area of the one-storey commercial building. The existing seven parking spaces, located on the vacant lands municipally known as 14R Halton Street, will be maintained and unaltered.

    130 m away · filed Mar 2, 2026 · Refused

  • 34 Grove Ave · Minor variance

    To construct a new three-storey detached dwelling with a covered front porch, a front walkout basement, a front third storey terrace, and a rear third storey balcony. Also, to construct a two-storey detached ancillary building (containing a two-car garage with car lift and storage area), in the rear yard, abutting Skey Lane.

    240 m away · filed Sep 3, 2025 · Refused

  • 118 Givins St · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by enclosing a portion of the existing front porch. Also, to construct a front second storey balcony.

    140 m away · filed Jun 11, 2025 · Approved

  • 44 Argyle St · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey addition, and a front second storey balcony.

    240 m away · filed May 13, 2025 · Approved

  • 166 Ossington Ave · Minor variance

    To legalize and maintain the separate ground-level entrance that was constructed without an authorized building permit. The existing dwelling unit will be maintained.

    150 m away · filed Sep 5, 2024 · Approved

  • 36 Halton St · Minor variance

    To convert the existing three-storey (heritage) building into an apartment building by constructing a rear four-storey addition (north block), a side (east) three-storey addition (east wing), and a side (west) three-storey addition (west wing). There will be a total of 48 dwelling units on the lot. This proposal is subject to a Site Plan Control Application (not submitted).

    100 m away · filed Jul 25, 2024 · Approved

  • 1200 Dundas St W · Minor variance

    To alter the development standards, as approved under Site Specific Zoning By-law 398-2022, for the eight-storey mixed-use building (which is currently under construction) by reducing the number of three-bedroom dwelling units.

    170 m away · filed Jun 21, 2024 · Refused

Everything planned in Spadina-Fort York

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.