Toronto address · Ward 14, Toronto-Danforth
24 Mallon Ave
The City of Toronto has 1 building permit since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Party wall admin permits
Proposal for party wall admin permit related to 26 Mallon, 17-257664
Applied Nov 15, 2017 · issued Nov 21, 2017 · completed Mar 12, 2024 · Permit 17 262552 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
58 Jones Ave · Minor variance
To construct a new detached four-storey apartment building (containing seven residential dwelling units) with a front entrance with stairs, a side (north) covered entrance with stairs, a rear ground floor entrance with stairs and a partially enclosed waste storage in the front yard. Also, to construct a rear detached two-storey ancillary building (containing one laneway suite) with a rear (west) covered entrance and one visitor parking space, abutting the laneway. Further, to construct a rear one-storey detached ancillary building (containing 12 bicycle parking spaces). There will be a total…
250 m away · filed Jun 25, 2026 · Approved
99 Dagmar Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a complete third storey addition, and a rear three-storey addition with a front covered porch, a rear basement walkout, a rear ground floor deck with stairs, and two rear juliet balconies. Also, to construct a new rear one-storey ancillary building (one-car garage), abutting Dundas Street East. There will be a total of two residential dwelling units on this lot (one unit occupying the basement level, and one unit occupying the first, second, and third levels).
70 m away · filed Jun 17, 2026 · Hearing scheduled
12 Audley Ave · Minor variance
To alter the existing one-storey detached dwelling by constructing a rear ground floor addition and a rear deck with stairs.
230 m away · filed Jun 17, 2026 · Approved
64 Brooklyn Ave · Minor variance
To alter the existing three-storey detached dwelling by constructing one, two, and three-storey additions along the entire portion of the south side wall (including a basement level, a front integral garage, an elevator and stairs, a rear walkout basement, and a rear second storey terrace).
250 m away · filed Apr 23, 2026 · Approved
22 Galt Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a new rear one-storey ground floor addition, a deck with stairs and a rear basement walkout.
160 m away · filed Mar 5, 2026 · Approved
75 Badgerow Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a front covered porch with stairs.
200 m away · filed May 27, 2025 · Approved
9 Peyton Lane · Minor variance
To construct a new three-storey detached building (fourplex - four residential dwelling units - refer to the basement floor plan whereby one dwelling unit is partially above another dwelling unit). Each residential dwelling unit will have an integral garage, and a rear partially covered second floor balcony. This proposal has been reviewed as a building abutting side lot lines as the lot does not abut a municipal street. Also, the existing two-storey detached building (currently abutting Peyton Lane) will be maintained and unaltered.
180 m away · filed Apr 28, 2025 · Postponed
9 Peyton Lane · Minor variance
180 m away · filed Apr 28, 2025 · Application withdrawn
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.