Toronto address · Ward 4, Parkdale-High Park
24 Tyndall Ave
The City of Toronto has 13 building permits since 2017 (1 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Permit issued
Plumbing · Backflow prevention devices (Water only)
Proposal to install a backflow prevention device.
Applied Dec 11, 2025 · issued Jan 14, 2026 · Permit 25 265386 PSA
- Closed
Addition or alteration · Re-Roofing/Re-Cladding
Rev01: Repairs of stucco wall cladding; Wholesale removal of existing projected bricks on the east elevation and replacement with new EIFS system.Repairs of stucco wall cladding; isolated shelf angle replacement
Applied Dec 28, 2022 · issued Jan 30, 2023 · completed Apr 14, 2023 · Permit 22 206459 BLD (revision 01)
- Closed
Addition or alteration · Re-Roofing/Re-Cladding
Repairs of stucco wall cladding; isolated shelf angle replacement
Applied Sep 20, 2022 · issued Nov 9, 2022 · completed Apr 14, 2023 · Permit 22 206459 BLD
- Closed
Addition or alteration · Canopy w/o enclosure
Scope of work:REVISION - as built drawings - canopy framingReplacement of fabric canopy with new steel canopy, new cladding on both sides of main entrance door
Applied Mar 11, 2022 · issued Apr 13, 2022 · completed Jun 15, 2022 · Permit 19 202031 BLD (revision 01)
- Closed
Plumbing
Plumbing - Proposal for interior alterations to convert existing storage room in the basement to a fitness room with a new washroom.
Applied Jun 3, 2021 · issued Jun 24, 2021 · completed Dec 29, 2021 · Permit 21 165045 PLB
- Closed
Addition or alteration · Interior alterations
Proposal for interior alterations to convert existing storage room in the basement to a fitness room with a new washroom.
Applied Jun 3, 2021 · issued Jun 24, 2021 · completed Feb 1, 2022 · Permit 21 165045 BLD
- Closed
Heating and ventilation
HVAC - Proposal for interior alterations to convert existing storage room in the basement to a fitness room with a new washroom.
Applied Jun 3, 2021 · issued Jun 24, 2021 · completed Dec 24, 2021 · Permit 21 165045 HVA
- Closed
Addition or alteration · Garage Repair/Reconstruction
Underground parking garage repairs to level 1.
Applied Jan 27, 2021 · issued Mar 1, 2021 · completed Feb 10, 2022 · Permit 21 109516 BLD
- Closed
Addition or alteration · Other
Proposal for the rehabilitation of the hydro vault.
Applied Feb 10, 2020 · issued Mar 17, 2020 · completed Jan 5, 2021 · Permit 20 113998 BLD
- Closed
Fire and security upgrade · Standpipes
Replace fire booster pump and control with same size pump and control
Applied Nov 27, 2019 · issued Jan 6, 2020 · completed May 15, 2020 · Permit 19 254465 FSU
- Closed
Addition or alteration · Canopy w/o enclosure
Replacement of fabric canopy with new steel canopy, new cladding on both sides of main entrance door
Applied Aug 7, 2019 · issued Nov 7, 2019 · completed Jun 15, 2022 · Permit 19 202031 BLD
- Closed
Plumbing · Backflow prevention devices (Water only)
Installation of a backflow prevention device and thermal expansion tank
Applied Aug 1, 2019 · issued Aug 21, 2019 · completed Oct 1, 2019 · Permit 19 199306 PSA
Show 1 more permit
- Closed
Addition or alteration · Balcony/Guard repairs
Proposal for localized concrete repairs on balcony slabs for existing residential apartment building.
Applied Jan 25, 2019 · issued Feb 11, 2019 · completed Dec 18, 2020 · Permit 19 108671 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
- Under appeal
54-68 Fraser Avenue and 151 Liberty Street
55 storeys · 732 homes · Mixed use
400 m away · Rezoning · Under appeal · filed Jan 24, 2025
- Under review
1-3 Close Avenue and 78 Springhurst Avenue
8 storeys · 54 homes · Residential
410 m away · Site plan · Under review · filed Aug 4, 2026
- Under review
39-53 Fraser Avenue, 38-42 Pardee Avenue and 135 Liberty Street
11 storeys · Residential
440 m away · Site plan · Under review · filed Dec 22, 2021
- Approved
10 storeys · 92 homes · Residential
450 m away · Site plan · Approved · filed May 26, 2025
- Under appeal
145 Cowan Avenue and 1304 King Street West
18 storeys · 230 homes · Residential
460 m away · Rezoning · Under appeal · filed Oct 12, 2023
Neighbours’ Committee of Adjustment files within 250 m
1 Thorburn Ave · Minor variance
To construct a one-storey ancillary building (detached garage) in the rear yard.
190 m away · filed Oct 17, 2022 · Approved
47 Spencer Ave · Minor variance
To convert the existing 5-storey building from 56 units to 60 units by converting a portion of the underground garage into residential suites and amenity space.
100 m away · filed Jun 11, 2022 · Approved
52 Cowan Ave · Consent
To obtain consent to create a new easement/right-of-way on the north side of 52 Cowan Avenue, in benefit of 54 Cowan Avenue.
240 m away · filed Feb 8, 2022 · Approved
54 Cowan Ave · Consent
To obtain consent to create a new easement/right-of-way on the south side of 54 Cowan Avenue, in benefit of 52 Cowan Avenue.
240 m away · filed Dec 30, 2021 · Approved
54 Cowan Ave · Minor variance
To permit the conversion of a rooming house into a three-unit dwelling without the benefit of a permit. Also, to alter the dwelling by constructing a rear second storey addition with a deck and a complete third storey addition.
240 m away · filed Aug 26, 2021 · Approved
21 Cowan Ave · Minor variance
To alter the existing two-storey row house by constructing a third storey addition and a first storey rear deck.
160 m away · filed Mar 11, 2021 · Approved
60 Tyndall Ave · Minor variance
To alter the existing apartment building, containing 69 residential units and 49 parking spaces, by converting a storage room into an additional dwelling unit and a new storage room.
90 m away · filed Feb 1, 2021 · Approved
25 Springhurst Ave · Minor variance
To construct a new three-storey detached dwelling with a front porch, front and rear third storey balconies, and a rear ground floor deck. Also, to construct a one-storey ancillary building (detached garage) in the rear yard of the property, abutting the laneway.
120 m away · filed Dec 22, 2020 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.