Toronto address · Ward 15, Don Valley West
2409 Yonge St
The City of Toronto has 8 building permits since 2017 (4 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
HVAC - Proposed interior finishes for a dessert cafe
Applied Aug 30, 2022 · issued Nov 8, 2022 · completed Oct 30, 2025 · Permit 22 197850 HVA
- Inspections under way
Plumbing
Plumbing - Proposed interior finishes for a dessert cafe
Applied Aug 30, 2022 · issued Nov 8, 2022 · Permit 22 197850 PLB
- Inspections under way
Addition or alteration · Interior alterations
Proposed interior finishes for a dessert cafe
Applied Aug 30, 2022 · issued Nov 8, 2022 · Permit 22 197850 BLD
- Closed
Plumbing
Plumbing - Proposed interior alteration to an existing medical office unt.
Applied Mar 20, 2018 · issued Apr 10, 2018 · completed Jun 4, 2018 · Permit 18 131731 PLB
- Closed
Addition or alteration · Interior alterations
Proposed interior alteration to an existing medical office unt.
Applied Mar 20, 2018 · issued Apr 5, 2018 · completed May 7, 2018 · Permit 18 131731 BLD
- Closed
Heating and ventilation
HVAC - Proposed interior alteration to an existing medical office unt.
Applied Mar 20, 2018 · issued Apr 10, 2018 · completed Jul 23, 2026 · Permit 18 131731 HVA
- Inspections under way
Addition or alteration · Interior alterations
Demolition of existing partitions, construction of new interior partitions, HVAC, lighting , electrical and finishes to existing office suite
Applied May 9, 2016 · issued Jun 16, 2016 · Permit 16 152592 BLD
- Inspections under way
Addition or alteration · Interior alterations
Demolition of existing partitions and construction of new , ceiling retained, and new plumbing fixtures and locations. Unit 301
Applied Dec 3, 2015 · issued Jan 26, 2016 · Permit 15 260457 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
40 storeys · 524 homes · Residential
160 m away · Rezoning · Under review · filed Dec 24, 2025
- Under review
39 storeys · 412 homes · Mixed use
160 m away · Site plan · Under review · filed Apr 8, 2022
- Under review
56 storeys · 1,370 homes · Residential
170 m away · Subdivision · Under review · filed Oct 1, 2021
- Under review
24 storeys · 306 homes · Mixed use
170 m away · Site plan · Under review · filed Jun 30, 2022
- Approved
49 storeys · 1,112 homes · Mixed use
210 m away · Rezoning · Approved · filed Nov 9, 2021
- Under review
50 storeys · 323 homes · Residential
210 m away · Site plan · Under review · filed Jul 13, 2022
Neighbours’ Committee of Adjustment files within 250 m
74 Roselawn Ave · Minor variance
To construct a three-storey detached dwelling. File Nos. B0015/26NY, A0262/26NY and A0263/26NY will be jointly considered.
230 m away · filed Jun 30, 2026 · Tentatively scheduled
74 Roselawn Ave · Consent
To obtain consent to sever the existing property into 2 residential lots and construct 2 new three-storey dwellings. File numbers B0015/26NY, A0262/26NY. and A0263/26NY will be jointly considered.
230 m away · filed Jun 30, 2026 · Tentatively scheduled
74 Roselawn Ave · Minor variance
To construct a new three-storey detached dwelling. File Nos. B0015/26NY, A0262/26NY and A0263/26NY will be jointly considered.
230 m away · filed Jun 30, 2026 · Tentatively scheduled
49 Roselawn Ave · Minor variance
To permit an office use at the existing dwelling, with a second storey east to west addition linking to 47 Roselawn Avenue.
160 m away · filed Jul 31, 2024 · Approved
47 Roselawn Ave · Minor variance
To permit an office use at the existing dwelling, with a second storey east to west addition linking to 49 Roselawn Avenue.
150 m away · filed Jul 31, 2024 · Approved
2400 Yonge St · Minor variance
To alter the developments standards, as approved by Site Specific Zoning By-law 1207-2022, including changes to the tower heights, gross floor area, and parking space lengths. The southern tower will increase from 101.2 metres to 110.1 metres and the north tower will increase 83.2 metres to 92.1 metres.
50 m away · filed Feb 8, 2024 · Approved
40 Broadway Ave · Minor variance
To permit an additional 4 storeys on top of the previously approved 39-storey tower. Cross-reference Site Plan Control Application 22 132571 NNY 15 SA. NOTE: This application was previously deferred at the Committee of Adjustment hearing on January 23, 2025.
180 m away · filed Jul 18, 2023 · Approved
40 Broadway Ave · Consent
To obtain consent to sever the property into two lots and create various easements/rights-of way.
180 m away · filed Nov 18, 2022 · Tentatively scheduled
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.