Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 15, Don Valley West

2511 Yonge St

The City of Toronto has 2 building permits since 2017 (1 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Addition or alteration · Interior alterations

    Alter plans as approved under the base BP: 02-155075 by enlarging the opening of the wall on the ground floor from 10' wide opening to approx 22' wide.

    Applied Aug 6, 2002 · issued Aug 7, 2002 · Permit 02 155075 BLD (revision 01)

    Permit issued
  • Addition or alteration · Interior alterations

    Build 10' wide opening at ground floor to combine 2 retail units into 1 unit, plus interior renovation. The remaining ground floor retail unit and second floor plus basement stay unchange.

    Applied Jul 18, 2002 · issued Jul 18, 2002 · completed Jun 8, 2026 · Permit 02 155075 BLD

    Closed (dormant)

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 2561 Yonge St · Minor variance

    To alter the existing building by adding a rear second storey addition.

    150 m away · filed Sep 4, 2025 · Approved

  • 2551 Yonge St · Minor variance

    To construct 1 storey slab on grade rear addition to an existing ground floor retail unit

    100 m away · filed May 30, 2024 · Approved

  • 2400 Yonge St · Minor variance

    To alter the developments standards, as approved by Site Specific Zoning By-law 1207-2022, including changes to the tower heights, gross floor area, and parking space lengths. The southern tower will increase from 101.2 metres to 110.1 metres and the north tower will increase 83.2 metres to 92.1 metres.

    250 m away · filed Feb 8, 2024 · Approved

  • 14 St Clements Ave · Minor variance

    Proposal to alter existing two storey daycare with a one storey addition on the north side, enclosed vestibule on the south side and two outdoor platforms, on the north and south side of the building.

    100 m away · filed Apr 4, 2023 · conditional approval

  • 37 Sherwood Ave · Minor variance

    To construct a shed/cabana in the rear yard.

    210 m away · filed Sep 23, 2022 · Approved

  • 2576 Yonge St · Minor variance

    To conduct interior alterations to the existing structure.

    190 m away · filed Jan 24, 2022 · Approved

  • 21 St Clements Ave · Minor variance

    To construct a three (3) storey addition to the west along with exterior alterations of the existing school.

    80 m away · filed Nov 10, 2021 · Approved

  • 2567 Yonge St · Minor variance

    To permit two new barrier free parking spaces.

    170 m away · filed Apr 28, 2021 · Approved

Everything planned in Don Valley West

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.