Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

254 Greenwood Ave

The City of Toronto has 8 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Multiple projects

    Revision to - create a new window opening (clouded in plan and elevation)Interior renovation to convert single family dwelling to a triplex dwelling.

    Applied Jun 23, 2025 · issued Jul 15, 2025 · completed Nov 19, 2025 · Permit 25 142004 BLD (revision 01)

    Closed
  • Drains and site services

    Drain - Interior renovation to convert single family dwelling to a triplex dwelling.

    Applied Jun 17, 2025 · issued Jun 25, 2025 · completed Jun 25, 2025 · Permit 25 142004 DRN

    Closed
  • Heating and ventilation

    HVAC - Interior renovation to convert single family dwelling to a triplex dwelling.

    Applied Apr 9, 2025 · issued Jun 6, 2025 · completed Nov 4, 2025 · Permit 25 142004 HVA

    Closed
  • Plumbing

    Plumbing - Interior renovation to convert single family dwelling to a triplex dwelling.

    Applied Apr 9, 2025 · issued Jun 6, 2025 · completed Nov 4, 2025 · Permit 25 142004 PLB

    Closed
  • Small residential project · Multiple projects

    Interior renovation to convert single family dwelling to a triplex dwelling.

    Applied Apr 9, 2025 · issued Jun 6, 2025 · completed Nov 19, 2025 · 2 homes added · Permit 25 142004 BLD

    Closed
  • Small residential project · Multiple projects

    Proposal for underpinning and interior alterations.

    Applied Apr 3, 2025 · issued Apr 9, 2025 · completed Aug 13, 2025 · Permit 25 139156 BLD

    Closed
  • Plumbing

    Plumbing - Interior alterations to existing SFD to all floors.Fee does not include 2nd floor (min. alt.) - Interior Alterations

    Applied Feb 17, 2006 · issued Mar 21, 2006 · completed Jun 20, 2025 · Permit 06 110700 PLB

    Closed
  • Small residential project · Interior alterations

    Interior alterations to existing SFD to all floors.Fee does not include 2nd floor (min. alt.)

    Applied Feb 17, 2006 · issued Mar 21, 2006 · completed Jun 20, 2025 · Permit 06 110700 BLD

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · New R building

    To construct a two-storey ancillary building (containing one garden suite) in the rear yard of the property, abutting Bloomfield Avenue. The existing shed will be demolished. There will be a total of four residential dwelling units on the lot (three dwelling units within the main house and one dwelling unit within the garden suite).

    Decision: Withdrawn

    Filed Sep 17, 2024 · File A0826/24TEY

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 1250 Gerrard St E · Minor variance

    To alter the existing three-storey mixed-use rowhouse dwelling by constructing a rear three-storey addition with a basement walkout, and an exterior fire escape staircase leading to all the levels. Also, to construct one ground level office space, and four residential dwelling units within this dwelling. There will be a total of five bicycle parking spaces provided in the rear yard. The existing ground level commercial space (coin laundry facility) will be maintained and unaltered.

    160 m away · filed Jan 8, 2026 · Approved

  • 44 Sandford Ave · Minor variance

    To legalize and to maintain a one-storey detached ancillary building (containing one laneway suite) in the rear yard, abutting the laneway. This ancillary building was constructed without an authorized building permit.

    70 m away · filed Nov 12, 2025 · Approved

  • 12 Sandford Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a third-storey addition, and a front yard parking pad.

    160 m away · filed Jun 18, 2025 · Approved

  • 33 Prust Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear second storey addition (enclosing the existing second storey deck for habitable space).

    200 m away · filed Oct 28, 2024 · Approved

  • 52 Glenside Ave · Minor variance

    To construct a new two-and-one-half-storey detached dwelling with a front integral garage, a rear ground floor deck, a front second storey balcony, a front third floor patio on the roof of the second storey below, and a side and rear (southwest) third floor rooftop terrace. The existing rear detached garage and dwelling will be demolished.

    170 m away · filed Jun 21, 2024 · Approved

  • 42 Sandford Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear ground level deck, and a front basement walkout entry and stairs. Also, to reconstruct the front enclosed porch and stairs. The existing rear ancillary building (detached garage) will be maintained and unaltered. There will be a total of two residential dwelling units on this lot.

    80 m away · filed Mar 6, 2024 · Approved

  • 21 Sandford Ave · Minor variance

    To alter the existing detached two-and-one-half-storey dwelling by constructing a new rear first storey deck addition, a new swimming pool in the rear yard and a rear two-storey detached ancillary building (garage). The existing detached garage will be demolished.

    140 m away · filed Nov 2, 2023 · Approved

  • 88 Redwood Ave · Minor variance

    To construct a new three-storey detached dwelling with a side (south) third storey terrace. Also, to construct a new one-storey ancillary building (detached garage), in the rear yard, abutting the laneway.

    140 m away · filed Oct 25, 2023 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.