Toronto address · Ward 15, Don Valley West
256 Airdrie Rd
The City of Toronto has 6 building permits since 2017 (2 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revision issued
Small residential project · Multiple projects
REV 01: ADD NEW BASEMENT WINDOW + WINDOW WELL AT FRONT ELEVATIONProposal for interior alterations and replacement of existing front porch with new covered porch and stairs.
Applied Jul 2, 2026 · issued Jul 7, 2026 · Permit 25 270966 BLD (revision 01)
- Closed
Heating and ventilation
HVAC - Proposal for interior alterations and replacement of existing front porch with new covered porch and stairs.
Applied Jan 21, 2026 · issued Feb 4, 2026 · completed Jun 19, 2026 · Permit 25 270966 HVA
- Inspections under way
Small residential project · Multiple projects
Proposal for interior alterations and replacement of existing front porch with new covered porch and stairs.
Applied Dec 31, 2025 · issued Jan 5, 2026 · Permit 25 270966 BLD
- Closed
Plumbing
Plumbing - Proposal for interior alterations and replacement of existing front porch with new covered porch and stairs.
Applied Dec 31, 2025 · issued Jan 5, 2026 · completed Jun 19, 2026 · Permit 25 270966 PLB
- Closed
Drains and site services
Drain - Proposal for interior alterations and replacement of existing front porch with new covered porch and stairs.
Applied Dec 31, 2025 · issued Jan 5, 2026 · completed Jun 19, 2026 · Permit 25 270966 DRN
- Closed
Small residential project · Party wall admin permits
Party wall admin permit for 15 227025 BLD 00 SR.
Applied Sep 23, 2015 · issued Nov 10, 2015 · completed Sep 11, 2025 · Permit 15 227043 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
8 storeys · 106 homes · Residential
270 m away · Condominium · Under review · filed Oct 8, 2021
- Under review
8 storeys · 143 homes · Residential
290 m away · Condominium · Under review · filed Oct 8, 2021
- Refused
7 storeys · 44 homes · Residential
490 m away · Rezoning · Refused · filed Sep 19, 2025
Neighbours’ Committee of Adjustment files within 250 m
230 Airdrie Rd · Minor variance
To construct a new ancillary building, containing a parking space, in the rear yard.
80 m away · filed May 21, 2026 · Approved
302 Airdrie Rd · Minor variance
To construct a new detached dwelling with a walkout basement.
230 m away · filed Feb 26, 2025 · Approved
105 Rumsey Rd · Minor variance
To construct a new detached dwelling. NOTE: This application was previously deferred at the Committee of Adjustment hearing on November 7, 2024.
150 m away · filed Oct 1, 2024 · Approved on condition
156 McRae Dr · Minor variance
To construct a 2 storey side and rear addition, new front and rear covered porch and new shed. Please note, this application was deferred on May 9, 2024, to allow the applicant to address missed variances.
190 m away · filed Mar 7, 2024 · Approved
295 Sutherland Dr · Minor variance
Proposal to construct a new 2 storey dwelling with a rear garage.
160 m away · filed Aug 3, 2023 · Approved
192 Randolph Rd · Minor variance
To construct a new 2 storey laneway suite.
240 m away · filed Feb 8, 2023 · Approved
296 Airdrie Rd · Minor variance
To construct a new two (2) storey addition to the existing dwelling.
210 m away · filed Aug 5, 2021 · Approved
158 Randolph Rd · Minor variance
To construct a two storey dwelling, and a two storey laneway suite with a carport.
200 m away · filed Jul 29, 2021 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.