Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 8, Eglinton-Lawrence

2564 Yonge St

The City of Toronto has 6 building permits since 2017 (5 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Proposal for interior alterations to the ground floor to combine two existing commerical units into a single take-out restaurant

    Applied Jul 15, 2026 · issued Aug 27, 2026 · Permit 26 201634 HVA

    Permit issued
  • Plumbing

    Plumbing - Proposal for interior alterations to the ground floor to combine two existing commerical units into a single take-out restaurant

    Applied Jul 15, 2026 · issued Aug 27, 2026 · Permit 26 201634 PLB

    Permit issued
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to the ground floor to combine two existing commerical units into a single take-out restaurant

    Applied Jul 14, 2026 · issued Aug 19, 2026 · Permit 26 201634 BLD

    Permit issued
  • Plumbing · Backflow prevention devices (Water only)

    Replace backflow preventer

    Applied Apr 9, 2024 · issued May 7, 2024 · Permit 24 134195 PSA

    Permit issued
  • Plumbing · Backflow prevention devices (Water only)

    Install one back flow prevention device.

    Applied Sep 14, 2017 · issued Oct 19, 2017 · completed Nov 29, 2017 · Permit 17 233047 PSA

    Closed
  • Addition or alteration · Interior alterations

    New Interior Alterations to MR. SUSHI- 10 Seats

    Applied Oct 24, 2012 · issued Nov 21, 2012 · Permit 12 267912 BLD

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 34 Craighurst Ave · Minor variance

    To construct a two-storey and second storey addition to the rear of the existing dwelling, in conjunction with other interior and exterior alterations.

    210 m away · filed Jul 27, 2026 · Deferred

  • 2561 Yonge St · Minor variance

    To alter the existing building by adding a rear second storey addition.

    40 m away · filed Sep 4, 2025 · Approved

  • 4 Brynhurst Crt · Minor variance

    To construct a new dwelling. Please note a previous application (File # A0092/25NY) with respect to the subject property, was before the Committee of Adjustment on Thursday, April 17, 2025, which was ultimately approved on condition.

    250 m away · filed Aug 8, 2025 · Approved

  • 4 Brynhurst Crt · Minor variance

    To construct a new dwelling.

    250 m away · filed Feb 3, 2025 · Approved

  • 2551 Yonge St · Minor variance

    To construct 1 storey slab on grade rear addition to an existing ground floor retail unit

    60 m away · filed May 30, 2024 · Approved

  • 101 Briar Hill Ave · Minor variance

    To construct a new detached dwelling with rear deck and basement walkout.

    250 m away · filed Oct 27, 2023 · Approved

  • 86 Albertus Ave · Minor variance

    Proposal to construct a two storey dwelling with a covered porch, rear deck and rear walkout. This application was previously deferred on September 28th to allow the applicant to address Urban Forestry's comments and the neighbors concerns.

    210 m away · filed Aug 8, 2023 · Approved

  • 14 St Clements Ave · Minor variance

    Proposal to alter existing two storey daycare with a one storey addition on the north side, enclosed vestibule on the south side and two outdoor platforms, on the north and south side of the building.

    70 m away · filed Apr 4, 2023 · conditional approval

Everything planned in Eglinton-Lawrence

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.