Toronto address · Ward 19, Beaches-East York
2569 St Clair Ave E
The City of Toronto has 5 building permits since 2017 (4 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Heating and ventilation
Hvac - rev #1-relocate duct work construct new 2 storey sfd
Applied Jun 2, 2004 · issued Jun 7, 2004 · Permit 03 135604 HVA (revision 01)
- Inspections under way
Heating and ventilation
HVAC - CONSTRUCT NEW 2 STOREY SFDDEM 03-135603 - New Building
Applied Jun 26, 2003 · issued Aug 29, 2003 · Permit 03 135604 HVA
- Inspections under way
Residential building permit · New building
Construct new 2 storey sfddem 03-135603
Applied May 22, 2003 · issued Aug 29, 2003 · 1 home added · Permit 03 135604 BLD
- Inspections under way
Plumbing
Plumbing - CONSTRUCT NEW 2 STOREY SFDDEM 03-135603 - New Building
Applied May 22, 2003 · issued Aug 29, 2003 · Permit 03 135604 PLB
- Closed
Residential building permit · Demolition
Demolish existing bungalowbld 03-135604
Applied May 22, 2003 · issued Aug 29, 2003 · completed Oct 8, 2024 · 1 home removed · Permit 03 135603 DEM
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
16 storeys · 219 homes · Mixed use
450 m away · Rezoning · Under review · filed Jun 3, 2025
Neighbours’ Committee of Adjustment files within 250 m
1600 Woodbine Heights Blvd · Minor variance
To construct a new two-storey detached dwelling with a front integral garage, a covered front porch and stairs, a rear first-floor covered deck, and a rear basement walkout with stairs. The existing one-storey detached dwelling will be demolished.
250 m away · filed Jan 29, 2024 · Approved
54 Glenwood Cres · Minor variance
To alter the existing two-storey detached dwelling by constructing a two-storey rear and east side addition, an integral basement garage with a basement storage room addition, a one-storey front addition with a terrace (above the integral garage), , a first storey rear deck, asecond storey rear balcony, a front yard driveway, and paving along the east side and a portion of the rear yard.The existing rear attached garage will be demolished.
180 m away · filed Oct 1, 2023 · Approved
1 Denvale Rd · Minor variance
To construct a two-storey detached dwelling with an integrated front garage, a side ground level deck, and side basement walkout stairs.
60 m away · filed Feb 10, 2023 · Approved
15 Marilyn Cres · Minor variance
To construct a new detached dwelling with an attached garage. The existing detached garage will be demolished.
230 m away · filed Nov 13, 2020 · Approved
2579 St Clair Ave E · Minor variance
To construct a two-storey detached house with an integral garage, a rear basement walkout and a rear first floor deck.
80 m away · filed May 29, 2020 · Approved
16 Presteign Ave · Minor variance
To construct a new two-storey detached dwelling with an integral garage on the undersized conveyed lot described in Consent Application B0071/18TEY.
150 m away · filed Jul 20, 2018 · Approved
16 Presteign Ave · Consent
To obtain consent to sever the property into six residential lots of which three lots are irregular-shaped and three lots are undersized.
150 m away · filed Jul 20, 2018 · Approved
16 Presteign Ave · Minor variance
To construct a new two-storey detached dwelling with an integral garage on the undersized conveyed lot described in Consent Application B0071/18TEY.
150 m away · filed Jul 20, 2018 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.