Toronto address · Ward 3, Etobicoke-Lakeshore
257 Berry Rd
The City of Toronto has 6 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
HVAC - 1st & 2nd storey addition and basement second suite. Review in conjunction with 23 195281 BLD 01 SR.
Applied Dec 11, 2023 · issued Apr 22, 2024 · completed Mar 31, 2025 · Permit 23 195281 HVA
- Closed
Plumbing
Plumbing - 1st & 2nd storey addition and basement second suiteProposal to create secondary suite in the basement, construct interior alterations and relocate rear second floor bay windows.
Applied Dec 11, 2023 · issued Jan 30, 2024 · completed Mar 17, 2025 · Permit 23 195281 PLB (revision 01)
- Closed
Small residential project · Multiple projects
Revision 01. 1st & 2nd storey addition and conversion of building type from Detached House to Duplex (new 2nd dwelling unit in basement).Proposal to construct interior alterations and relocate rear second floor bay windows.
Applied Dec 11, 2023 · issued Jan 30, 2024 · completed Mar 26, 2025 · 1 home added · Permit 23 195281 BLD (revision 01)
- Closed
Plumbing
Plumbing - Proposal to create secondary suite in the basement, construct interior alterations and relocate rear second floor bay windows.
Applied Aug 29, 2023 · issued Sep 26, 2023 · completed Mar 17, 2025 · Permit 23 195281 PLB
- Closed
Small residential project · Multiple projects
Proposal to construct interior alterations and relocate rear second floor bay windows. (Secondary Suite has been removed.)NOTE: 01 Revision permit converts building type from Detached House to Duplex.
Applied Aug 29, 2023 · issued Sep 26, 2023 · completed Mar 26, 2025 · Permit 23 195281 BLD
- Closed
Drains and site services
Drain - Proposal to create secondary suite in the basement, construct interior alterations and relocate rear second floor bay windows.
Applied Aug 29, 2023 · issued Sep 26, 2023 · completed Mar 17, 2025 · Permit 23 195281 DRN
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
96 Prince Edward Dr S · Minor variance
To permit a front yard parking pad.
200 m away · filed Jul 24, 2026 · Refused
18 Greenmount Crt · Minor variance
To construct a two-storey rear addition. A previous Committee of Adjustment application (A0600/22EYK) approved variances related to lot coverage, side yard setback and building length.
230 m away · filed May 13, 2026 · Approved
231 Berry Rd · Minor variance
To construct a new detached dwelling with an attached garage.
190 m away · filed May 14, 2025 · Approved
25 Beaucourt Rd · Minor variance
To construct a second storey addition above the existing dwelling.
240 m away · filed Feb 26, 2025 · Approved
22 Beaucourt Rd · Minor variance
To construct a new detached dwelling with an attached garage.
180 m away · filed Jan 15, 2024 · Approved
5 Elderidge Ave · Minor variance
To construct a second storey addition above the existing dwelling, a new covered front porch and covered and uncovered decks in the rear yard.
240 m away · filed Dec 7, 2022 · Approved
18 Greenmount Crt · Minor variance
To construct a two-storey east side addition.
230 m away · filed Nov 30, 2022 · Approved
7 Clueson Pk · Minor variance
To construct a second storey addition.
160 m away · filed Jul 15, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.