Toronto address · Ward 11, University-Rosedale
258 College St
The City of Toronto has 4 building permits since 2017 (3 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Fire and security upgrade · Sprinklers
Extending sprinkler system
Applied Nov 9, 2007 · issued Nov 30, 2007 · Permit 07 277803 FSU
- Inspections under way
Addition or alteration · Interior alterations
Alter storefront. Interior alterations to convert existing coffee shop to New Tim Hortons. 43 seats. Confirmed address is 455 Spadina Avenue.
Applied Jul 23, 2007 · issued Oct 1, 2007 · Permit 07 246086 BLD
- Inspections under way
Plumbing
Plumbing - Interior alterations to convert existing coffee shop to New Tim Hortons. 43 seats.
Applied Jul 23, 2007 · issued Oct 1, 2007 · Permit 07 246086 PLB
- Closed (dormant)
Heating and ventilation
HVAC - Interior alterations to convert existing coffee shop to New Tim Hortons. 43 seats.
Applied Jul 23, 2007 · issued Oct 1, 2007 · completed Jun 8, 2026 · Permit 07 246086 HVA
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
9 storeys · 109 homes · Mixed use
120 m away · Site plan · Under review · filed Apr 20, 2022
- Approved
- Under review
- Under review
191-199 College Street and 74-76 Henry Street
31 storeys · 492 homes · Mixed use
360 m away · Site plan · Under review · filed Aug 28, 2022
- Under review
18 storeys · Non-residential
480 m away · Site plan · Under review · filed Jun 1, 2022
Neighbours’ Committee of Adjustment files within 250 m
281 College St · Minor variance
To alter the existing three-storey mixed-use building by converting the office unit (occupying the rear portion of the ground level) into one additional residential dwelling unit. The exising retail unit (occupying the front portion of the ground level), and two residential units (occupying the second and third levels) will be maintained.
110 m away · filed Dec 18, 2025 · Approved
13 Oxford St · Minor variance
To alter the existing two-storey townhouse by constructing a fire shutter on the west side of the previously approved two-storey rear addition.
210 m away · filed Apr 27, 2021 · Approved
6 Nassau St · Minor variance
To construct five four-storey townhouse dwellings.
240 m away · filed Feb 28, 2021 · Approved
33 Oxford St · Minor variance
To complete interior alterations to an existing two-storey, semi-detached dwelling; and, to rebuild the existing front porch, front second floor balcony rear one storey roof.
250 m away · filed Feb 26, 2020 · Approved
251 College St · Minor variance
To alter the existing 25-storey student residence building by constructing a new staff lounge in a portion of level 00 that is currently occupied by 84 bicycle parking spaces.
70 m away · filed Sep 5, 2019 · Approved
13 Oxford St · Minor variance
To alter the existing two-storey townhouse by constructing a rear two-storey addition and to legalize and to maintain the front porch and air conditioning unit.
210 m away · filed May 12, 2019 · Approved
250 College St · Consent
To obtain consent for a long term lease of 41 years and to create a reciprocal right-of-way/easement.
60 m away · filed May 4, 2017 · Approved
462 Spadina Ave · Minor variance
Extending the third floor by raising the ceiling of the third floor with an addition to the third floor for a balcony, mezzanine and office space. Raise ceiling of the third floor.
90 m away · filed Feb 8, 2017 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.