Toronto address · Ward 11, University-Rosedale
259 College St
The City of Toronto has 5 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Addition or alteration · Interior alterations
Rev01: Structural plan for equipment support
Applied Oct 26, 2021 · issued Nov 3, 2021 · completed Feb 4, 2022 · Permit 21 133223 BLD (revision 01)
- Closed
Heating and ventilation
REV01: changes as per drawings
Applied Oct 26, 2021 · issued Nov 8, 2021 · completed Feb 15, 2022 · Permit 21 133223 HVA (revision 01)
- Closed
Addition or alteration · Interior alterations
Proposal for interior alteration converting a vacant space into a new restaurant.
Applied Mar 29, 2021 · issued Apr 13, 2021 · completed Feb 4, 2022 · Permit 21 133223 BLD
- Closed
Heating and ventilation
HVAC - Proposal for interior alteration converting a vacant space into a new restaurant.
Applied Mar 29, 2021 · issued Apr 21, 2021 · completed Feb 15, 2022 · Permit 21 133223 HVA
- Closed
Plumbing
Plumbing - Proposal for interior alteration converting a vacant space into a new restaurant.
Applied Mar 29, 2021 · issued Apr 19, 2021 · completed Feb 2, 2022 · Permit 21 133223 PLB
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
9 storeys · 109 homes · Mixed use
160 m away · Site plan · Under review · filed Apr 20, 2022
- Approved
- Under review
- Under review
191-199 College Street and 74-76 Henry Street
31 storeys · 492 homes · Mixed use
350 m away · Site plan · Under review · filed Aug 28, 2022
- Under review
18 storeys · Non-residential
470 m away · Site plan · Under review · filed Jun 1, 2022
Neighbours’ Committee of Adjustment files within 250 m
281 College St · Minor variance
To alter the existing three-storey mixed-use building by converting the office unit (occupying the rear portion of the ground level) into one additional residential dwelling unit. The exising retail unit (occupying the front portion of the ground level), and two residential units (occupying the second and third levels) will be maintained.
110 m away · filed Dec 18, 2025 · Approved
23 Ross St · Minor variance
To construct a new two-storey detached ancillary building (containing one garden suite), with a cantilevered second storey in the rear yard. There will be a total of five residential dwelling units on this lot (four units within the main dwelling, and one unit within the ancillary building).
230 m away · filed Oct 28, 2025 · Approved
24 Nassau St · Minor variance
To legalize and maintain the construction of a rear one-storey addition to the existing two-storey detached dwelling.
250 m away · filed Sep 2, 2021 · Approved
13 Oxford St · Minor variance
To alter the existing two-storey townhouse by constructing a fire shutter on the west side of the previously approved two-storey rear addition.
180 m away · filed Apr 27, 2021 · Approved
6 Nassau St · Minor variance
To construct five four-storey townhouse dwellings.
200 m away · filed Feb 28, 2021 · Approved
33 Oxford St · Minor variance
To complete interior alterations to an existing two-storey, semi-detached dwelling; and, to rebuild the existing front porch, front second floor balcony rear one storey roof.
220 m away · filed Feb 26, 2020 · Approved
251 College St · Minor variance
To alter the existing 25-storey student residence building by constructing a new staff lounge in a portion of level 00 that is currently occupied by 84 bicycle parking spaces.
50 m away · filed Sep 5, 2019 · Approved
13 Oxford St · Minor variance
To alter the existing two-storey townhouse by constructing a rear two-storey addition and to legalize and to maintain the front porch and air conditioning unit.
180 m away · filed May 12, 2019 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.