Toronto address · Ward 8, Eglinton-Lawrence
2596 Yonge St
The City of Toronto has 3 building permits since 2017 (3 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Plumbing
Plumbing - Proposed REMOVAL OF EXISTING DEMISING WALL BETWEEN 2594 AND 2596 YONGE STREET AND FIT OUT TO CREATE OPTICAL GLASSES STORE. UNOCCUPIED BASEMENT STORAGE AND 2ND FLOOR RESIDENTIAL TO REMAIN UNCHANGED
Applied Feb 16, 2023 · issued Apr 13, 2023 · Permit 23 114880 PLB
- Inspections under way
Addition or alteration · Interior alterations
Proposed REMOVAL OF EXISTING DEMISING WALL BETWEEN 2594 AND 2596 YONGE STREET AND FIT OUT TO CREATE OPTICAL GLASSES STORE. UNOCCUPIED BASEMENT STORAGE AND 2ND FLOOR RESIDENTIAL TO REMAIN UNCHANGED
Applied Feb 16, 2023 · issued Apr 13, 2023 · Permit 23 114880 BLD
- Inspections under way
Heating and ventilation
HVAC - Proposed REMOVAL OF EXISTING DEMISING WALL BETWEEN 2594 AND 2596 YONGE STREET AND FIT OUT TO CREATE OPTICAL GLASSES STORE. UNOCCUPIED BASEMENT STORAGE AND 2ND FLOOR RESIDENTIAL TO REMAIN UNCHANGED
Applied Feb 16, 2023 · issued Apr 13, 2023 · Permit 23 114880 HVA
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
2674-2704 Yonge Street and 19 Alexandra Boulevard
13 storeys · 208 homes · Residential
250 m away · Site plan · Approved · filed Nov 4, 2025
- Approved
2490-2514 Yonge Street, 10-20 Castlefield Avenue and 567 Duplex Avenue
15 storeys · 161 homes · Mixed use
270 m away · Condominium · Approved · filed May 14, 2025
- Under review
35 storeys · 377 homes · Residential
500 m away · Site plan · Under review · filed Sep 19, 2022
Neighbours’ Committee of Adjustment files within 250 m
34 Craighurst Ave · Minor variance
To construct a two-storey and second storey addition to the rear of the existing dwelling, in conjunction with other interior and exterior alterations.
110 m away · filed Jul 27, 2026 · Deferred
12 Blythwood Rd · Minor variance
To alter the existing two-storey detached dwelling and construct a two-storey rear addition.
250 m away · filed Apr 7, 2026 · Approved
2561 Yonge St · Minor variance
To alter the existing building by adding a rear second storey addition.
120 m away · filed Sep 4, 2025 · Approved
4 Brynhurst Crt · Minor variance
To construct a new dwelling. Please note a previous application (File # A0092/25NY) with respect to the subject property, was before the Committee of Adjustment on Thursday, April 17, 2025, which was ultimately approved on condition.
180 m away · filed Aug 8, 2025 · Approved
33 Lytton Blvd · Minor variance
To construct an inground pool in the rear yard.
210 m away · filed Apr 25, 2025 · Approved
4 Brynhurst Crt · Minor variance
To construct a new dwelling.
180 m away · filed Feb 3, 2025 · Approved
83 Sheldrake Blvd · Minor variance
To construct a new detached 3 storey dwelling.
240 m away · filed Jun 14, 2024 · Approved
2551 Yonge St · Minor variance
To construct 1 storey slab on grade rear addition to an existing ground floor retail unit
160 m away · filed May 30, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.