Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

260 Delaware Ave

The City of Toronto has 8 building permits since 2017 (5 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Multiple projects

    Revision 02: Proposal to create a Secondary Suite within the basementFront basement walkout, New foundation wall at front, minor alteration to 1st and 2nd floor and plumbingUnderpin existing b'ment foundations and install 3 pc bath and laundry in b'ment.

    Applied Jan 4, 2024 · issued Feb 15, 2024 · 1 home added · Permit 14 122755 BLD (revision 02)

    Revision issued
  • Heating and ventilation

    Rev 01 - single zone to 2 zone duct system HVAC - Underpin existing b'ment foundations and install 3 pc bath and laundry in b'ment.

    Applied Jan 30, 2018 · issued Feb 6, 2018 · completed Apr 29, 2026 · Permit 14 122755 HVA (revision 01)

    Closed
  • Heating and ventilation

    HVAC - Underpin existing b'ment foundations and install 3 pc bath and laundry in b'ment.

    Applied Oct 27, 2014 · issued Oct 29, 2014 · completed Apr 29, 2026 · Permit 14 122755 HVA

    Closed
  • Plumbing

    Plumbing - Underpin existing b'ment foundations and install 3 pc bath and laundry in b'ment.

    Applied Apr 22, 2014 · issued Apr 22, 2014 · Permit 14 122755 PLB (revision 01)

    Revision issued
  • Small residential project · Multiple projects

    Front basement walkout, New foundation wall at front, minor alteration to 1st and 2nd floor and plumbingUnderpin existing b'ment foundations and install 3 pc bath and laundry in b'ment.

    Applied Apr 8, 2014 · issued Apr 22, 2014 · Permit 14 122755 BLD (revision 01)

    Revision issued
  • Drains and site services

    Drain - Underpin existing b'ment foundations and install 3 pc bath and laundry in b'ment.

    Applied Feb 27, 2014 · issued Mar 5, 2014 · completed Apr 29, 2026 · Permit 14 122755 DRN

    Closed
  • Small residential project · Multiple projects

    Underpin existing b'ment foundations and install 3 pc bath and laundry in b'ment.

    Applied Feb 27, 2014 · issued Mar 5, 2014 · Permit 14 122755 BLD

    Inspections under way
  • Plumbing

    Plumbing - Underpin existing b'ment foundations and install 3 pc bath and laundry in b'ment.

    Applied Feb 27, 2014 · issued Mar 5, 2014 · Permit 14 122755 PLB

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

  • 798 Dovercourt Road

    Residential

    130 m away · Condominium · Approved · filed Nov 14, 2024

    Approved
  • 157 Hallam Street

    4 homes · Residential

    470 m away · Condominium · Approved · filed Jun 18, 2025

    Approved

Neighbours’ Committee of Adjustment files within 250 m

  • 800 Dovercourt Rd · Consent

    To obtain consent for the technical severance of the property for the purpose of re-establishing two residential lots which merged on title.

    110 m away · filed Jul 13, 2026 · Hearing scheduled

  • 942 Bloor St W · Minor variance

    To construct a new three-storey mixed-use building (the foundation of the existing building will be maintained), with eight third storey side (west) juliet balconies. There will be three commercial units that will occupy the ground floor and basement, and four residential dwelling units that will occupy the second and third storeys of the building on the lot.

    220 m away · filed Dec 1, 2025 · Approved

  • 225 Delaware Ave · Minor variance

    To convert the existing four-storey detached dwelling from a fourplex into a six unit apartment building by constructing a front and a rear fourth storey addition with balconies, and two enclosed rooftop stair access structures leading to private rooftop terraces, along with interior alterations. The existing rear ancillary building (garden suite) will be maintained and unaltered. There will be a total of seven residential dwelling units on this lot (six units within the main apartment building and one unit within the ancillary building).

    130 m away · filed Jun 12, 2025 · Deferred

  • 238 Delaware Ave · Minor variance

    To construct a new one-storey ancillary building (detached garage) in the rear yard of the property, abutting the private laneway.

    60 m away · filed May 13, 2025 · Approved

  • 822 Ossington Ave · Minor variance

    To alter the existing one-storey ancillary building (detached garage, abutting Pasquino Lane), in the rear yard of the existing two-and-one-half-storey detached dwelling (triplex), by constructing a complete second storey addition (for the purpose of one laneway suite on the second level and maintaining one parking space on the ground level). There will be a total of four residential dwelling units on this lot (three units within the main dwelling and one unit within the ancillary building).

    200 m away · filed Oct 25, 2024 · Approved

  • 431 Concord Ave · Minor variance

    To alter the existing one-storey ancillary building (detached garage abutting the laneway) by constructing a second storey addition (to contain one laneway suite that will occupy both levels). There will be a total of four residential dwelling units on this lot (three units within the main dwelling and one unit within the ancillary building).

    230 m away · filed Sep 20, 2024 · Refused

  • 301 Delaware Ave · Minor variance

    To permit the existing rear third storey addition, which was constructed without an authorized building permit.

    130 m away · filed May 2, 2024 · Approved

  • 386 Concord Ave · Minor variance

    To construct a new two-storey laneway suite.

    150 m away · filed Jan 26, 2024 · Approved

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.