Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 13, Toronto Centre

260 Yonge St

The City of Toronto has 51 building permits since 2017 (18 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Designated structure · Sign building permit related

    1 overhanging structure sign**SIMONS**

    Applied Aug 27, 2026 · completed Aug 28, 2026 · Permit 26 227124 DST

    Cancelled
  • Addition or alteration · Interior alterations

    REV 1: PER ATTACHED DETAIL SHEETProposal for Alteration of existing retail suite, new internal partitions, doors and hardware, storefronts and finishes. Alterations to existing mechanical ductwork and electrical distribution. New vertical transportation (elevator, staircase)

    Applied Sep 30, 2025 · issued Nov 5, 2025 · Permit 24 251212 BLD (revision 01)

    Revision issued
  • Heating and ventilation

    REV 1: PER ATTACHED DETAIL SHEETHVAC - Proposal for Alteration of existing retail suite, new internal partitions, doors and hardware, storefronts and finishes. Alterations to existing mechanical ductwork and electrical distribution. New vertical transportation (elevator, staircase)

    Applied Sep 30, 2025 · issued Oct 24, 2025 · Permit 24 251212 HVA (revision 01)

    Revision issued
  • Plumbing

    REV 1: PER ATTACHED DETAIL SHEETPlumbing - Proposal for Alteration of existing retail suite, new internal partitions, doors and hardware, storefronts and finishes. Alterations to existing mechanical ductwork and electrical distribution. New vertical transportation (elevator, staircase)

    Applied Sep 30, 2025 · issued Oct 24, 2025 · Permit 24 251212 PLB (revision 01)

    Revision issued
  • Heating and ventilation

    Revision: see Mechanical¿s Memo in drawing set

    Applied Aug 13, 2025 · issued Sep 24, 2025 · completed Jan 9, 2026 · Permit 24 243692 HVA (revision 02)

    Closed
  • Designated structure · Sign building permit related

    1 wall sign + 1 overhanging structure sign**EATALY**

    Applied Jun 18, 2025 · issued Jun 27, 2025 · completed Dec 11, 2025 · Permit 25 179486 DST

    Closed
  • Plumbing

    Rev 03 - Alterations to an existing storage space at the Toronto Eaton Centre converted to an office area for the Toronto Police Services.Rev 02 - Revised plansPlumbing - Proposed alterations to existing space on levels 3, 4, & 5 back to base building, including the dmeolition of existing facade for future tenant facades.

    Applied Jun 11, 2025 · issued Jul 14, 2025 · completed Jan 8, 2026 · Permit 24 102861 PLB (revision 03)

    Closed
  • Heating and ventilation

    Rev 04 - Alterations to an existing storage space at the Toronto Eaton Centre converted to an office area for the Toronto Police Services.Rev 03 - Revised plansRevision #01 - Proposed alterations and renovations to re-demise the existing space at the Toronto Eaton Centre occupied by Nordstrom on Levels 3, 4 and 5 back to Base Building; including the demolition of the existing Facade for future Tenant Facades.HVAC - Proposed alterations to existing space on levels 3, 4, & 5 back to base building, including the demolition of existing facade for future tenant facades.

    Applied Jun 11, 2025 · issued Jul 11, 2025 · completed Jan 9, 2026 · Permit 24 102861 HVA (revision 04)

    Closed
  • Addition or alteration · Interior alterations

    Rev 03 - Alterations to an existing storage space at the Toronto Eaton Centre converted to an office area for the Toronto Police Services.Rev 02 - Revised plansRevision #01 - Proposed alterations and renovations to re-demise the existing space at the Toronto Eaton Centre occupied by Nordstrom on Levels 3, 4 and 5 back to Base Building; including the demolition of the existing Facade for future Tenant Facades.Proposed alterations to existing space on levels 3, 4, & 5 back to base building, including the dmeolition of existing facade for future tenant facades.

    Applied Jun 11, 2025 · issued Jul 10, 2025 · completed Feb 6, 2026 · Permit 24 102861 BLD (revision 03)

    Closed
  • Designated structure · Sign building permit related

    2 Projecting Signs on the third storey, east elevation and 2 wall signs, third storey,one on the east and one on the south elevation. (Approved as per variance # 25-173005)3 Wall Signs on the first storey, east elevation.**SIMONS**

    Applied May 12, 2025 · issued Sep 11, 2025 · Permit 25 158205 DST

    Permit issued
  • Heating and ventilation

    HVAC - Proposed addition of Fire Hose Cabinet in sales area, fitting room adjustment (removed few stalls added more sales area), and new Fan coil unit in staff lounge.

    Applied Feb 28, 2025 · issued Apr 8, 2025 · completed Dec 24, 2025 · Permit 25 123291 HVA

    Closed
  • Addition or alteration · Interior alterations

    Proposed addition of Fire Hose Cabinet in sales area, fitting room adjustment (removed few stalls added more sales area), and new Fan coil unit in staff lounge.

    Applied Feb 28, 2025 · issued Apr 8, 2025 · completed Feb 4, 2026 · Permit 25 123291 BLD

    Closed
Show 39 more permits
  • Alternative solution

    This Alternative Solution addresses the approach developed to permit the vertical stair opening within the Nike - Rise suite (CRU 300/A038S on Levels 3 and 4 of the Toronto Eaton Centre (TEC) located in Toronto, Ontario. It is proposed to have a 1.8 m wide by 3.7 m high vertical opening in the fire separation to allow movement of occupants to and from the stair. The total area of the vertical opening will be 6.7 m2. Refer to the LRI Report dated February 24, 2025 for more information.

    Applied Feb 26, 2025 · completed Mar 6, 2025 · Permit 25 122201 ALT

    Approved
  • Addition or alteration · Interior alterations

    Revision 01 - see cover letter attached to drawingsNew tenant - Proposed interior/exterior alerations

    Applied Feb 26, 2025 · issued Mar 6, 2025 · completed Jul 2, 2026 · Permit 24 243692 BLD (revision 01)

    Closed
  • Heating and ventilation

    Revision 01 - see cover letter attached to drawingsHVAC - New tenant - Proposed interior/exterior alerations

    Applied Feb 26, 2025 · issued Mar 7, 2025 · completed Jan 9, 2026 · Permit 24 243692 HVA (revision 01)

    Closed
  • Plumbing

    Rev 02 - Revised plansPlumbing - Proposed alterations to existing space on levels 3, 4, & 5 back to base building, including the dmeolition of existing facade for future tenant facades.

    Applied Jan 31, 2025 · issued Mar 4, 2025 · completed Jan 8, 2026 · Permit 24 102861 PLB (revision 02)

    Closed
  • Heating and ventilation

    Rev 03 - Revised plansRevision #01 - Proposed alterations and renovations to re-demise the existing space at the Toronto Eaton Centre occupied by Nordstrom on Levels 3, 4 and 5 back to Base Building; including the demolition of the existing Facade for future Tenant Facades.HVAC - Proposed alterations to existing space on levels 3, 4, & 5 back to base building, including the demolition of existing facade for future tenant facades.

    Applied Jan 31, 2025 · issued Mar 4, 2025 · completed Jan 9, 2026 · Permit 24 102861 HVA (revision 03)

    Closed
  • Designated structure · Sign building permit related

    1 Roof Sign

    Applied Jan 8, 2025 · issued Feb 6, 2025 · completed May 21, 2025 · Permit 25 102506 DST

    Closed
  • Addition or alteration · Interior alterations

    Rev 02 - Revised plansRevision #01 - Proposed alterations and renovations to re-demise the existing space at the Toronto Eaton Centre occupied by Nordstrom on Levels 3, 4 and 5 back to Base Building; including the demolition of the existing Facade for future Tenant Facades.Proposed alterations to existing space on levels 3, 4, & 5 back to base building, including the dmeolition of existing facade for future tenant facades.

    Applied Dec 20, 2024 · issued Apr 28, 2025 · completed Feb 6, 2026 · Permit 24 102861 BLD (revision 02)

    Closed
  • Heating and ventilation

    HVAC - Proposal for Alteration of existing retail suite, new internal partitions, doors and hardware, storefronts and finishes. Alterations to existing mechanical ductwork and electrical distribution. New vertical transportation (elevator, staircase)

    Applied Dec 17, 2024 · issued Mar 7, 2025 · Permit 24 251212 HVA

    Inspections under way
  • Addition or alteration · Interior alterations

    Proposal for Alteration of existing retail suite, new internal partitions, doors and hardware, storefronts and finishes. Alterations to existing mechanical ductwork and electrical distribution. New vertical transportation (elevator, staircase)

    Applied Dec 17, 2024 · issued Mar 7, 2025 · Permit 24 251212 BLD

    Inspections under way
  • Plumbing

    Plumbing - Proposal for Alteration of existing retail suite, new internal partitions, doors and hardware, storefronts and finishes. Alterations to existing mechanical ductwork and electrical distribution. New vertical transportation (elevator, staircase)

    Applied Dec 17, 2024 · issued Mar 7, 2025 · Permit 24 251212 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - Addition of fire hose cabinet (Previous permit #24 101073 BA)

    Applied Dec 5, 2024 · completed Dec 17, 2024 · Permit 24 246891 HVA

    Cancelled
  • Addition or alteration · Interior alterations

    Addition of fire hose cabinet (Previous permit #24 101073 BA)

    Applied Dec 4, 2024 · completed Dec 17, 2024 · Permit 24 246891 BLD

    Cancelled
  • Plumbing

    Plumbing - New tenant - Proposed interior/exterior alerations

    Applied Nov 26, 2024 · issued Jan 10, 2025 · completed Nov 10, 2025 · Permit 24 243692 PLB

    Closed
  • Addition or alteration · Interior alterations

    New tenant - Proposed interior/exterior alerations

    Applied Nov 26, 2024 · issued Jan 10, 2025 · completed Jul 2, 2026 · Permit 24 243692 BLD

    Closed
  • Heating and ventilation

    HVAC - New tenant - Proposed interior/exterior alerations

    Applied Nov 26, 2024 · issued Jan 27, 2025 · completed Jan 9, 2026 · Permit 24 243692 HVA

    Closed
  • Addition or alteration · Interior alterations

    Structural work - drilling holes in floor slab for plumbing rough-in only for new tenant, Separate tenant fit up permit will be required later day for full interior fit up

    Applied Aug 26, 2024 · issued Sep 20, 2024 · Permit 24 203762 BLD

    Inspections under way
  • Plumbing

    Plumbing - Interior alterations for structural work for plumbing rough-in only for new tenant

    Applied Aug 26, 2024 · issued Sep 20, 2024 · completed Nov 10, 2025 · Permit 24 203762 PLB

    Closed
  • Plumbing

    Plumbing - Proposed alterations to existing space on levels 3, 4, & 5 back to base building, including the dmeolition of existing facade for future tenant facades.

    Applied Apr 12, 2024 · issued May 15, 2024 · completed Jan 8, 2026 · Permit 24 102861 PLB

    Closed
  • Addition or alteration · Interior alterations

    Revision #01 - Proposed alterations and renovations to re-demise the existing space at the Toronto Eaton Centre occupied by Nordstrom on Levels 3, 4 and 5 back to Base Building; including the demolition of the existing Facade for future Tenant Facades.Proposed alterations to existing space on levels 3, 4, & 5 back to base building, including the dmeolition of existing facade for future tenant facades.

    Applied Apr 8, 2024 · issued Jul 18, 2024 · completed Feb 6, 2026 · Permit 24 102861 BLD (revision 01)

    Closed
  • Heating and ventilation

    Revision #01 - Proposed alterations and renovations to re-demise the existing space at the Toronto Eaton Centre occupied by Nordstrom on Levels 3, 4 and 5 back to Base Building; including the demolition of the existing Facade for future Tenant Facades.HVAC - Proposed alterations to existing space on levels 3, 4, & 5 back to base building, including the demolition of existing facade for future tenant facades.

    Applied Apr 8, 2024 · issued May 13, 2024 · completed Jan 9, 2026 · Permit 24 102861 HVA (revision 01)

    Closed
  • Addition or alteration · Interior alterations

    Proposed alterations to existing space on levels 3, 4, & 5 back to base building, including the dmeolition of existing facade for future tenant facades.

    Applied Jan 9, 2024 · issued Mar 12, 2024 · completed Feb 6, 2026 · Permit 24 102861 BLD

    Closed
  • Heating and ventilation

    HVAC - Proposed alterations to existing space on levels 3, 4, & 5 back to base building, including the demolition of existing facade for future tenant facades.

    Applied Jan 9, 2024 · issued Feb 27, 2024 · completed Jan 9, 2026 · Permit 24 102861 HVA

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations for a new retail tenant - 'Winners' at Level 1 (Unit 2 / previously Unit N114B) in the Eaton Centre. [290 Yonge St / 1 / 33 Dundas St W]

    Applied Jan 4, 2024 · issued Mar 8, 2024 · completed Aug 28, 2024 · Permit 24 101073 BLD

    Closed
  • Heating and ventilation

    HVAC - Interior fit out for a new Winners store.

    Applied Jan 4, 2024 · issued Mar 8, 2024 · Permit 24 101073 HVA

    Inspections under way
  • Plumbing

    Plumbing - Interior fit out for a new Winners store.

    Applied Jan 4, 2024 · issued Mar 8, 2024 · completed Aug 20, 2024 · Permit 24 101073 PLB

    Closed
  • Addition or alteration · Interior alterations

    REVISION 01: escalator PitAdding new escalator Pit

    Applied Aug 14, 2023 · issued Sep 13, 2023 · Permit 23 163805 BLD (revision 01)

    Revision issued
  • Addition or alteration · Interior alterations

    Adding new escalator Pit

    Applied Jun 20, 2023 · issued Jul 20, 2023 · Permit 23 163805 BLD

    Permit issued
  • Heating and ventilation

    HVAC - Adding new escalator Pit

    Applied Jun 20, 2023 · issued Aug 9, 2023 · Permit 23 163805 HVA

    Permit issued
  • Designated structure · Sign building permit related

    To erect and display one illuminated wall sign**BMO**See ZSV (22-176477)

    Applied Nov 21, 2022 · issued Dec 5, 2022 · completed Feb 14, 2024 · Permit 22 231457 DST

    Closed
  • Addition or alteration · Interior alterations

    REV 01: reduced size of the opening in the floor slab on the 7th floor & revision to structural drawingsProposal for interior alterations for tenant improvement renovations on existing vacant Level 8 [6th Floor] & Level 9 [7th Floor] for an existing office tenant - 'BMO'. Scope: create an opening in the 7th floor slab for future Auditorium, add walkways / bridges on the 6th & 7th floors, add guard rails around the South Atrium on the 6th & 7th floors. (This proposal is tied to 21 106235 BLD 00 BA & BLD 01 BA.)

    Applied Jul 27, 2022 · issued Sep 1, 2022 · Permit 22 127084 BLD (revision 01)

    Revision issued
  • Designated structure · Sign building permit related

    To erect and display one illuminated ground sign, displaying static copy located along the north frontage, perpendicular to Dundas St W. The sign contains two sign faces, each measuring 2.46 metres by 1.07 metres at a height of 2.74 metres.***BMO***

    Applied May 18, 2022 · issued Jun 17, 2022 · completed Jul 26, 2023 · Permit 22 148544 DST

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations for tenant improvement renovations on existing vacant Level 8 [6th Floor] & Level 9 [7th Floor] for an existing office tenant - 'BMO'. Scope: create an opening in the 7th floor slab for future Auditorium, add walkways / bridges on the 6th & 7th floors, add guard rails around the South Atrium on the 6th & 7th floors. (This proposal is tied to 21 106235 BLD 00 BA & BLD 01 BA.)

    Applied Mar 25, 2022 · issued May 20, 2022 · Permit 22 127084 BLD

    Inspections under way
  • Plumbing

    Plumbing - Construct interior alterations on the 6th and 7th floors for BMO

    Applied Mar 25, 2022 · issued May 19, 2022 · Permit 22 127084 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - Construct interior alterations on the 6th and 7th floors for BMO

    Applied Mar 25, 2022 · issued May 19, 2022 · Permit 22 127084 HVA

    Inspections under way
  • Heating and ventilation · Other

    Proposal for the addition of wall mounted a/c units and a new exhaust fan

    Applied Aug 9, 2019 · issued Aug 19, 2019 · completed Dec 23, 2019 · Permit 19 203284 MSA

    Closed
  • Addition or alteration · Interior alterations

    Construct interior alterations to floors 25 & 26 for LINKEDIN (206m2)

    Applied Oct 30, 2018 · issued Nov 13, 2018 · completed Apr 6, 2022 · Permit 18 249641 BLD

    Closed
  • Plumbing

    Plumbing - Construct interior alterations to floors 25 & 26 for LINKEDIN (206m2)

    Applied Oct 30, 2018 · issued Dec 3, 2018 · completed Feb 16, 2022 · Permit 18 249641 PLB

    Closed
  • Heating and ventilation

    HVAC - Construct interior alterations to floors 25 & 26 for LINKEDIN (206m2)

    Applied Oct 30, 2018 · issued Dec 3, 2018 · completed Dec 10, 2021 · Permit 18 249641 HVA

    Closed
  • Heating and ventilation · Alter: add on /Ductwork

    Proposed removal of two existing VAV's and replacement with two new fan powered VAV boxes in an existing retail space (Nordstrom).

    Applied Mar 26, 2018 · issued Apr 20, 2018 · Permit 18 134432 MSA

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

  • 239-247 Yonge Street

    67 storeys · 774 homes · Mixed use

    40 m away · Site plan · Under review · filed Jan 8, 2025

    Under review
  • 237 Victoria Street

    24 storeys · 256 homes · Residential

    150 m away · Site plan · Under review · filed Sep 1, 2022

    Under review
  • 483-491 Bay Street and 20 Albert Street

    Not stated in the file

    170 m away · Subdivision · Under review · filed Sep 24, 2021

    Under review
  • 56-66 Bond Street

    6 storeys · Residential

    180 m away · Site plan · Under review · filed Dec 1, 2021

    Under review
  • 33 Dundas Street East

    Residential

    180 m away · Condominium · Under review · filed Oct 1, 2025

    Under review
  • 15 Richmond Street East

    71 storeys · 565 homes · Mixed use

    220 m away · Site plan · Under review · filed Sep 16, 2022

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 247 Yonge St · Minor variance

    To permit a place of amusement (arcade) use on this subject lot.

    60 m away · filed Aug 9, 2024 · Approved

  • 65 Dundas St E · Minor variance

    To convert the existing hotel building into an apartment building with a total of 280 affordable housing units.

    230 m away · filed Aug 16, 2022 · Approved

  • 15 Shuter St · Minor variance

    To alter, the historic Massey Hall concert venue, by constructing, an eight storey rear addition with passerelles, along the east and west elevations of the building.

    140 m away · filed Mar 27, 2018 · Approved

  • 1 Dundas St W · Minor variance

    To erect a structure on the rooftop of 20 Queen Street West to support the establishment of a sign. 20 Queen Street West is a convenience address.

    170 m away · filed Jan 24, 2018 · Approved

  • 2 Queen St W · Minor variance

    To alter the two 6 ½-storey buildings by constructing: a one-storey addition which will contain office and retail use, a green roof, and to remove the metal over-cladding from the buildings.

    230 m away · filed Apr 6, 2017 · Approved

Everything planned in Toronto Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.