The City of Toronto has 19 building permits since 2017 (16 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revision issued
Heating and ventilation
Revision 3 - Updated kitchen designHVAC - PHASE 1 - Basement Level 02 to Level 7Proposal for interior demolition to prepare for change of use and construction to convert existing hotel to affordable housing.
Applied Oct 23, 2025 · issued Oct 27, 2025 · Permit 22 217753 HVA (revision 03)
- Revision issued
Heating and ventilation
REVISION - The MUA on the roof was not captured properly in the previous BPHVAC - PHASE 1 - Basement Level 02 to Level 7Proposal for interior demolition to prepare for change of use and construction to convert existing hotel to affordable housing.
Applied Jul 14, 2025 · issued Jul 15, 2025 · Permit 22 217753 HVA (revision 02)
- Revision issued
Heating and ventilation
Revision 01 - Revision 2 - Updated kitchen designHVAC - PHASE 1 - Basement Level 02 to Level 7Proposal for interior demolition to prepare for change of use and construction to convert existing hotel to affordable housing.
Applied May 12, 2025 · issued May 13, 2025 · Permit 22 217753 HVA (revision 01)
- Under review
Addition or alteration · Interior alterations
Revision 2 - Updated kitchen designREV#1: Renovation and conversion of existing Hotel Building into affordable housing by City of Toronto. Updated fire separation assemblies as per project requirements.PHASE 1 - Basement Level 02 to Level 7Proposal for interior demolition to prepare for change of use and construction to convert existing hotel to affordable housing.
Applied May 12, 2025 · Permit 22 217753 BLD (revision 02)
- Inspections under way
Addition or alteration · Interior alterations
Proposal for renovation and conversion of existing Hotel Building into affordable housing by City of Toronto. Scope of work includes renovating the interior spaces and finishes and associated Mechanical, Electrical and Plumbing services as per the new program requirements. This application is for Phase 03 work only, which includes the work on Level 13 to Level 18 along with penthouse floor
Applied Mar 14, 2024 · issued May 3, 2024 · 279 homes added · Permit 24 125466 BLD
- Closed
Plumbing
Plumbing - PHASE 3 - Level 13 to Level 18Proposal for renovation and conversion of existing Hotel Building into affordable housing by City of Toronto. Scope of work includes renovating the interior spaces and finishes and associated Mechanical, Electrical and Plumbing services as per the new program requirements. This application is for Phase 03 work only, which includes the work on Level 13 to Level 18 along with penthouse floor.
Applied Mar 14, 2024 · issued May 8, 2024 · completed Sep 3, 2026 · Permit 24 125466 PLB
- Inspections under way
Heating and ventilation
- PHASE 3 - Level 13 to Level 18Proposal for renovation and conversion of existing Hotel Building into affordable housing by City of Toronto. Scope of work includes renovating the interior spaces and finishes and associated Mechanical, Electrical and Plumbing services as per the new program requirements. This application is for Phase 03 work only, which includes the work on Level 13 to Level 18 along with penthouse floor.
Applied Mar 14, 2024 · issued May 8, 2024 · Permit 24 125466 HVA
- Revision issued
Addition or alteration · Interior alterations
REV#1: Renovation and conversion of existing Hotel Building into affordable housing by City of Toronto. Updated fire separation assemblies as per project requirements.PHASE 1 - Basement Level 02 to Level 7Proposal for interior demolition to prepare for change of use and construction to convert existing hotel to affordable housing.
Applied Feb 13, 2024 · issued Mar 7, 2024 · Permit 22 217753 BLD (revision 01)
- Approved
Alternative solution
* A standpipe system will be installed in accordance with requirements of NBC article 3.2.5.7 to 3.2.5.10.* The standpipe system will be designed, constructed, installed and tested to conform with the requirements of NFPA 14, Installation of Standpipe and Hose System.* A standpipe main feed will be provided for each stairwell located in the northwest and southeast of the building. * A 65mm hose connections will be provided on each stair landing.* A 65mm to 38mm hose valve adapters and fire hoses will be stored in the fire pumps room in basement 2 level.
Applied Oct 2, 2023 · completed Jan 31, 2024 · Permit 23 209817 ALT
- Inspections under way
Fire and security upgrade · Sprinklers
Proposal to design and install the fire protection systems for the 19 storey building being converted to affordable housing. See related permits 22 217753 BLD (Phase 1), and 23 108352 BLD (Phase 2).
Applied Mar 7, 2023 · issued Jan 31, 2024 · Permit 23 120734 FSU
- Application on hold
Fire and security upgrade
FS - Sprinkler Shop Drawing - PHASE 2 - Level 8 to Level 12Proposal for interior demolition to prepare for change of use and construction to convert existing hotel to affordable housing. Refer to Permit 22 217753 BLD 0 BA For Phase 1 (Basement 02 to Level 7).
Applied Mar 6, 2023 · Permit 23 108352 FSU
- Closed
Plumbing
Plumbing - PHASE 2 - Level 8 to Level 13Proposal for interior demolition to prepare for change of use and construction to convert existing hotel to affordable housing.
Applied Jan 30, 2023 · issued Mar 6, 2023 · completed Sep 3, 2026 · Permit 23 108352 PLB
Show 7 more permits
- Inspections under way
Heating and ventilation
HVAC - PHASE 2 - Level 8 to Level 13Proposal for interior demolition to prepare for change of use and construction to convert existing hotel to affordable housing.
Applied Jan 30, 2023 · issued Mar 6, 2023 · Permit 23 108352 HVA
- Inspections under way
Addition or alteration · Interior alterations
PHASE 2 - Level 8 to Level 12Proposal for interior demolition to prepare for change of use and construction to convert existing hotel to affordable housing. Refer to Permit 22 217753 BLD 0 BA For Phase 1 (Basement 02 to Level 7).
Applied Jan 30, 2023 · issued Mar 6, 2023 · Permit 23 108352 BLD
- Application on hold
Fire and security upgrade
FS - Sprinkler Shop Drawing - PHASE 1 - Basement Level 02 to Level 7Proposal for interior demolition to prepare for change of use and construction to convert existing hotel to affordable housing.
Applied Dec 21, 2022 · Permit 22 217753 FSU
- Inspections under way
Heating and ventilation
HVAC - PHASE 1 - Basement Level 02 to Level 7Proposal for interior demolition to prepare for change of use and construction to convert existing hotel to affordable housing.
Applied Oct 17, 2022 · issued Dec 21, 2022 · Permit 22 217753 HVA
- Inspections under way
Plumbing
Plumbing - PHASE 1 - Basement Level 02 to Level 7Proposal for interior demolition to prepare for change of use and construction to convert existing hotel to affordable housing.
Applied Oct 17, 2022 · issued Dec 21, 2022 · Permit 22 217753 PLB
- Inspections under way
Addition or alteration · Interior alterations
PHASE 1 - Basement Level 02 to Level 7Proposal for interior demolition to prepare for change of use and construction to convert existing hotel to affordable housing.
Applied Oct 17, 2022 · issued Dec 22, 2022 · Permit 22 217753 BLD
- Closed
Designated structure · Sign building permit related
To erect and display two illuminated wall signs, one on the east elevation on Bond St and one on the north elevation on Dundas St. E. Signs are on the first storey and in conjunction with a juice bar & grill.**Pomanar**
Applied Aug 9, 2012 · issued Sep 7, 2012 · completed May 19, 2017 · Permit 12 226283 DST
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · Other
To convert the existing hotel building into an apartment building with a total of 280 affordable housing units.
Decision: Approved (hearing Sep 21, 2022)
Filed Aug 16, 2022 · File A0918/22TEY
What’s planned nearby
Development sites within 500 m
- Under review
- Under review
24 storeys · 256 homes · Residential
80 m away · Site plan · Under review · filed Sep 1, 2022
- Approved
53 storeys · 591 homes · Mixed use
130 m away · Site plan · Approved · filed Aug 31, 2021
- Under review
- Under review
67 storeys · 774 homes · Mixed use
200 m away · Site plan · Under review · filed Jan 8, 2025
- Under review
595 Bay Street and 306 Yonge Street
25 storeys · 224 homes · Mixed use
260 m away · Subdivision · Under review · filed Nov 8, 2021
Neighbours’ Committee of Adjustment files within 250 m
247 Yonge St · Minor variance
To permit a place of amusement (arcade) use on this subject lot.
170 m away · filed Aug 9, 2024 · Approved
244 Church St · Minor variance
To alter the development standards (approved by Site Specific Zoning By-law 517-2021 and 518-2021), for a 52-storey mixed-use building, with four levels of underground parking, by reducing the required retail/visitor parking spaces.
90 m away · filed Oct 17, 2023 · Approved
137 Bond St · Minor variance
To alter the existing three-storey building by constructing an east side five-storey addition above, a rear eight-storey addition, front and west side third storey dormer additions, with a fourth storey rooftop terrace, and green roofs on the second, sixth, seventh, and eighth storey. The building will be used to facilitate the University Health and Wellness programs.
200 m away · filed Apr 6, 2023 · Approved
244 Church St · Consent
To obtain consent to create a new easement/right-of-way for pedestrian access.
90 m away · filed Feb 27, 2023 · Approved
111 Bond St · Minor variance
To construct a new five-storey administrative building associated with Ryerson University.
120 m away · filed May 22, 2020 · Withdrawn
40 Gould St · Minor variance
To construct cooling towers on the roof of an existing three-storey university building.
230 m away · filed Feb 13, 2019 · Approved
15 Shuter St · Minor variance
To alter, the historic Massey Hall concert venue, by constructing, an eight storey rear addition with passerelles, along the east and west elevations of the building.
230 m away · filed Mar 27, 2018 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.