65 Dundas St E

The City of Toronto has 19 building permits since 2017 (16 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    Revision 3 - Updated kitchen designHVAC - PHASE 1 - Basement Level 02 to Level 7Proposal for interior demolition to prepare for change of use and construction to convert existing hotel to affordable housing.

    Applied Oct 23, 2025 · issued Oct 27, 2025 · Permit 22 217753 HVA (revision 03)

    Revision issued
  • Heating and ventilation

    REVISION - The MUA on the roof was not captured properly in the previous BPHVAC - PHASE 1 - Basement Level 02 to Level 7Proposal for interior demolition to prepare for change of use and construction to convert existing hotel to affordable housing.

    Applied Jul 14, 2025 · issued Jul 15, 2025 · Permit 22 217753 HVA (revision 02)

    Revision issued
  • Heating and ventilation

    Revision 01 - Revision 2 - Updated kitchen designHVAC - PHASE 1 - Basement Level 02 to Level 7Proposal for interior demolition to prepare for change of use and construction to convert existing hotel to affordable housing.

    Applied May 12, 2025 · issued May 13, 2025 · Permit 22 217753 HVA (revision 01)

    Revision issued
  • Addition or alteration · Interior alterations

    Revision 2 - Updated kitchen designREV#1: Renovation and conversion of existing Hotel Building into affordable housing by City of Toronto. Updated fire separation assemblies as per project requirements.PHASE 1 - Basement Level 02 to Level 7Proposal for interior demolition to prepare for change of use and construction to convert existing hotel to affordable housing.

    Applied May 12, 2025 · Permit 22 217753 BLD (revision 02)

    Under review
  • Addition or alteration · Interior alterations

    Proposal for renovation and conversion of existing Hotel Building into affordable housing by City of Toronto. Scope of work includes renovating the interior spaces and finishes and associated Mechanical, Electrical and Plumbing services as per the new program requirements. This application is for Phase 03 work only, which includes the work on Level 13 to Level 18 along with penthouse floor

    Applied Mar 14, 2024 · issued May 3, 2024 · 279 homes added · Permit 24 125466 BLD

    Inspections under way
  • Plumbing

    Plumbing - PHASE 3 - Level 13 to Level 18Proposal for renovation and conversion of existing Hotel Building into affordable housing by City of Toronto. Scope of work includes renovating the interior spaces and finishes and associated Mechanical, Electrical and Plumbing services as per the new program requirements. This application is for Phase 03 work only, which includes the work on Level 13 to Level 18 along with penthouse floor.

    Applied Mar 14, 2024 · issued May 8, 2024 · completed Sep 3, 2026 · Permit 24 125466 PLB

    Closed
  • Heating and ventilation

    - PHASE 3 - Level 13 to Level 18Proposal for renovation and conversion of existing Hotel Building into affordable housing by City of Toronto. Scope of work includes renovating the interior spaces and finishes and associated Mechanical, Electrical and Plumbing services as per the new program requirements. This application is for Phase 03 work only, which includes the work on Level 13 to Level 18 along with penthouse floor.

    Applied Mar 14, 2024 · issued May 8, 2024 · Permit 24 125466 HVA

    Inspections under way
  • Addition or alteration · Interior alterations

    REV#1: Renovation and conversion of existing Hotel Building into affordable housing by City of Toronto. Updated fire separation assemblies as per project requirements.PHASE 1 - Basement Level 02 to Level 7Proposal for interior demolition to prepare for change of use and construction to convert existing hotel to affordable housing.

    Applied Feb 13, 2024 · issued Mar 7, 2024 · Permit 22 217753 BLD (revision 01)

    Revision issued
  • Alternative solution

    * A standpipe system will be installed in accordance with requirements of NBC article 3.2.5.7 to 3.2.5.10.* The standpipe system will be designed, constructed, installed and tested to conform with the requirements of NFPA 14, Installation of Standpipe and Hose System.* A standpipe main feed will be provided for each stairwell located in the northwest and southeast of the building. * A 65mm hose connections will be provided on each stair landing.* A 65mm to 38mm hose valve adapters and fire hoses will be stored in the fire pumps room in basement 2 level.

    Applied Oct 2, 2023 · completed Jan 31, 2024 · Permit 23 209817 ALT

    Approved
  • Fire and security upgrade · Sprinklers

    Proposal to design and install the fire protection systems for the 19 storey building being converted to affordable housing. See related permits 22 217753 BLD (Phase 1), and 23 108352 BLD (Phase 2).

    Applied Mar 7, 2023 · issued Jan 31, 2024 · Permit 23 120734 FSU

    Inspections under way
  • Fire and security upgrade

    FS - Sprinkler Shop Drawing - PHASE 2 - Level 8 to Level 12Proposal for interior demolition to prepare for change of use and construction to convert existing hotel to affordable housing. Refer to Permit 22 217753 BLD 0 BA For Phase 1 (Basement 02 to Level 7).

    Applied Mar 6, 2023 · Permit 23 108352 FSU

    Application on hold
  • Plumbing

    Plumbing - PHASE 2 - Level 8 to Level 13Proposal for interior demolition to prepare for change of use and construction to convert existing hotel to affordable housing.

    Applied Jan 30, 2023 · issued Mar 6, 2023 · completed Sep 3, 2026 · Permit 23 108352 PLB

    Closed
Show 7 more permits
  • Heating and ventilation

    HVAC - PHASE 2 - Level 8 to Level 13Proposal for interior demolition to prepare for change of use and construction to convert existing hotel to affordable housing.

    Applied Jan 30, 2023 · issued Mar 6, 2023 · Permit 23 108352 HVA

    Inspections under way
  • Addition or alteration · Interior alterations

    PHASE 2 - Level 8 to Level 12Proposal for interior demolition to prepare for change of use and construction to convert existing hotel to affordable housing. Refer to Permit 22 217753 BLD 0 BA For Phase 1 (Basement 02 to Level 7).

    Applied Jan 30, 2023 · issued Mar 6, 2023 · Permit 23 108352 BLD

    Inspections under way
  • Fire and security upgrade

    FS - Sprinkler Shop Drawing - PHASE 1 - Basement Level 02 to Level 7Proposal for interior demolition to prepare for change of use and construction to convert existing hotel to affordable housing.

    Applied Dec 21, 2022 · Permit 22 217753 FSU

    Application on hold
  • Heating and ventilation

    HVAC - PHASE 1 - Basement Level 02 to Level 7Proposal for interior demolition to prepare for change of use and construction to convert existing hotel to affordable housing.

    Applied Oct 17, 2022 · issued Dec 21, 2022 · Permit 22 217753 HVA

    Inspections under way
  • Plumbing

    Plumbing - PHASE 1 - Basement Level 02 to Level 7Proposal for interior demolition to prepare for change of use and construction to convert existing hotel to affordable housing.

    Applied Oct 17, 2022 · issued Dec 21, 2022 · Permit 22 217753 PLB

    Inspections under way
  • Addition or alteration · Interior alterations

    PHASE 1 - Basement Level 02 to Level 7Proposal for interior demolition to prepare for change of use and construction to convert existing hotel to affordable housing.

    Applied Oct 17, 2022 · issued Dec 22, 2022 · Permit 22 217753 BLD

    Inspections under way
  • Designated structure · Sign building permit related

    To erect and display two illuminated wall signs, one on the east elevation on Bond St and one on the north elevation on Dundas St. E. Signs are on the first storey and in conjunction with a juice bar & grill.**Pomanar**

    Applied Aug 9, 2012 · issued Sep 7, 2012 · completed May 19, 2017 · Permit 12 226283 DST

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · Other

    To convert the existing hotel building into an apartment building with a total of 280 affordable housing units.

    Decision: Approved (hearing Sep 21, 2022)

    Filed Aug 16, 2022 · File A0918/22TEY

    Closed

What’s planned nearby

Development sites within 500 m

  • 33 Dundas Street East

    Residential

    70 m away · Condominium · Under review · filed Oct 1, 2025

    Under review
  • 237 Victoria Street

    24 storeys · 256 homes · Residential

    80 m away · Site plan · Under review · filed Sep 1, 2022

    Under review
  • 241 Church Street

    53 storeys · 591 homes · Mixed use

    130 m away · Site plan · Approved · filed Aug 31, 2021

    Approved
  • 56-66 Bond Street

    6 storeys · Residential

    140 m away · Site plan · Under review · filed Dec 1, 2021

    Under review
  • 239-247 Yonge Street

    67 storeys · 774 homes · Mixed use

    200 m away · Site plan · Under review · filed Jan 8, 2025

    Under review
  • 595 Bay Street and 306 Yonge Street

    25 storeys · 224 homes · Mixed use

    260 m away · Subdivision · Under review · filed Nov 8, 2021

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 247 Yonge St · Minor variance

    To permit a place of amusement (arcade) use on this subject lot.

    170 m away · filed Aug 9, 2024 · Approved

  • 244 Church St · Minor variance

    To alter the development standards (approved by Site Specific Zoning By-law 517-2021 and 518-2021), for a 52-storey mixed-use building, with four levels of underground parking, by reducing the required retail/visitor parking spaces.

    90 m away · filed Oct 17, 2023 · Approved

  • 137 Bond St · Minor variance

    To alter the existing three-storey building by constructing an east side five-storey addition above, a rear eight-storey addition, front and west side third storey dormer additions, with a fourth storey rooftop terrace, and green roofs on the second, sixth, seventh, and eighth storey. The building will be used to facilitate the University Health and Wellness programs.

    200 m away · filed Apr 6, 2023 · Approved

  • 244 Church St · Consent

    To obtain consent to create a new easement/right-of-way for pedestrian access.

    90 m away · filed Feb 27, 2023 · Approved

  • 111 Bond St · Minor variance

    To construct a new five-storey administrative building associated with Ryerson University.

    120 m away · filed May 22, 2020 · Withdrawn

  • 40 Gould St · Minor variance

    To construct cooling towers on the roof of an existing three-storey university building.

    230 m away · filed Feb 13, 2019 · Approved

  • 15 Shuter St · Minor variance

    To alter, the historic Massey Hall concert venue, by constructing, an eight storey rear addition with passerelles, along the east and west elevations of the building.

    230 m away · filed Mar 27, 2018 · Approved

Everything planned in Toronto Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.