Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 13, Toronto Centre

262 Jarvis St

The City of Toronto has 3 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation · Other

    Proposal for installation of heat pump.

    Applied Feb 27, 2025 · issued Mar 5, 2025 · completed Nov 18, 2025 · Permit 25 122859 MSA

    Closed
  • Plumbing · Backflow prevention devices (Water only)

    Proposal to install 2 backflow prevention devices in existing apartment building.

    Applied Jun 13, 2013 · issued Jun 20, 2013 · completed Sep 21, 2018 · Permit 13 187576 PSA

    Closed
  • Fire and security upgrade · Sprinklers

    Install 14 Sprinkler heads in the basement.

    Applied Aug 28, 2001 · issued Feb 11, 2002 · completed Nov 30, 2018 · Permit 01 172536 FSU

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 291 Jarvis St · Consent

    To obtain consent for the purpose of a stratified lot addition (air-rights) above an elevation of 119 m of the property municipally known as 285-291 Jarvis Street.

    140 m away · filed Apr 2, 2026 · Approved

  • 296 Jarvis St · Minor variance

    To alter the existing 18-storey mixed-use building (as approved under Site Specific Zoning By-law 298-88) by converting the existing service and retail office floor area on the first storey, and the hotel conference and banquet room floor areas on the second storey into a hotel with 50 guest suites. The existing second storey bridge connecting to 300 Jarvis Street will be demolished..

    160 m away · filed Jul 22, 2025 · Postponed

  • 291 George St · Minor variance

    To alter the existing five-storey apartment building by converting one parking space (located on the B1 parking level) into a storage area use. There will be a total of 47 parking spaces on-site instead of 48 parking spaces.

    250 m away · filed Jan 29, 2025 · Approved

  • 145 Mutual St · Minor variance

    To alter the existing 15-storey apartment building by constructing a garbage storage enclosure (to be located on the upper-level of the underground parking garage), which will be the cause for a reduction in two vehicular parking spaces.

    60 m away · filed Aug 28, 2024 · Approved

  • 109 1/2 Granby St · Consent

    To obtain consent for a technical severance to re-establish two residential lots which merged on title.

    240 m away · filed Dec 7, 2021 · Approved

  • 104 Pembroke St · Minor variance

    To construct a new two-storey rear detached laneway suite with a second floor rear terrace and green roof facing the interior of the lot.

    230 m away · filed Sep 3, 2019 · Approved

  • 311 Jarvis St · Minor variance

    To convert a portion of the existing three-storey mixed-use building from a youth detention centre into a municipal homeless shelter.

    110 m away · filed Mar 19, 2019 · Withdrawn

  • 87 Gerrard St E · Minor variance

    To construct a one-storey addition in the interior courtyard area of an existing university residence that will be used as amenity space. Note: 160 Mutual Street is a convenience address.

    120 m away · filed May 28, 2018 · Approved

Everything planned in Toronto Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.