Toronto address · Ward 14, Toronto-Danforth
264 Riverdale Ave
The City of Toronto has 2 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Interior alterations
Proposal for interior alterations to remove non- load bearing walls, one in the basement and one on the ground floor.
Applied Sep 26, 2019 · issued Sep 27, 2019 · completed Jan 20, 2020 · Permit 19 227600 BLD
- Closed
Small residential project · Carport
Proposal to construct detached carport at rear of existing single family detached dwelling.
Applied Oct 9, 2015 · issued Oct 23, 2015 · completed May 31, 2019 · Permit 15 235731 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
198 Withrow Ave · Minor variance
To alter the existing three-storey semi-detached dwelling by constructing front and rear basement additions, and a rear three-storey addition with a third floor balcony. Also, to construct a new front basement walkout, a front porch with stairs, and a rear deck with stairs. In addition, to convert the rear two-storey ancillary building (abutting the laneway) into a one-car garage and interior staircase on the first level and office/habitable space on the second level.
240 m away · filed Nov 3, 2025 · Approved
260 Bain Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey addition and a third storey side (west) roof deck. The rear ground floor one-storey addition has been demolished and a new rear ground floor deck with stairs and as well as a rear basement walkout has already been constructed under approved Building Permit No. 24 172386 BLD 02 SR.
190 m away · filed May 23, 2025 · Approved
255 Bain Ave · Minor variance
To construct a new three-storey detached dwelling with a front porch, a third storey terrace (above the second floor at the southwest portion of the dwelling), and a rear ground floor deck. Also, to construct a new one-storey ancillary building (detached garage) in the rear yard, abutting the laneway.
160 m away · filed Dec 27, 2024 · Approved
301 Riverdale Ave · Minor variance
To legalize and to maintain the rear second floor addition, of the existing two-storey semi-detached dwelling, which was constructed beyond the limits of the authorized building permit.
130 m away · filed Nov 5, 2024 · Approved
10 Poucher St · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear second storey addition.
220 m away · filed Jul 26, 2024 · Approved
195 Withrow Ave · Minor variance
To construct a new three-storey detached dwelling with a rear ground level deck, a rear basement walkout with stairs, and a rear third floor balcony. Also, to construct a new one-storey ancillary building (detached garage), in the rear yard, abutting the laneway. The existing three-storey apartment building (containing three dwelling units), and rear detached garage will be demolished.
220 m away · filed Jan 8, 2024 · Approved
287 Withrow Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a partial front second storey addition, partial front and rear third storey additions (with front second and third storey juliette balconies), and a rear third storey balcony.
180 m away · filed Aug 16, 2023 · Approved
203 Withrow Ave · Minor variance
To construct a new two-storey ancillary building (laneway suite), in the rear yard, abutting the laneway.
190 m away · filed Aug 11, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.