Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

266 Symington Ave

The City of Toronto has 3 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    Plumbing - Proposed new 3rd unit (basement suite) in existing semi-detached house with existing 2 units above. Separate entrance already exists. Adding 2 small windows (fire-rated) to the south wall - includes 2 bedrooms, 1 bath, 1 kitchen and a living/dining room and on-site laundry

    Applied Feb 6, 2024 · issued Oct 24, 2024 · completed Mar 26, 2025 · Permit 24 112279 PLB

    Closed
  • Small residential project · Interior alterations

    Proposed new 3rd unit (basement suite) in existing semi-detached house to 3 units (triplex)Separate entrance already exists. Adding 2 small windows (fire-rated) to the south wall - includes 2 bedrooms, 1 bath, 1 kitchen and a living/dining room and on-site laundry

    Applied Feb 6, 2024 · issued Sep 23, 2024 · completed Mar 28, 2025 · 2 homes added · Permit 24 112279 BLD

    Closed
  • Small residential project · Second suite (New)

    Interior alterations to add basement unit. Separate entrance already exists, adding a small window (fire-rated) to the elevation facing the property line. 2 bedrooms, 1 bath, 1 kitchen and a living room

    Applied Jan 5, 2024 · completed Jan 10, 2024 · 1 home added · Permit 24 101377 BLD

    Cancelled

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 209 Symington Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear two-storey addition (including a basement level) with a covered deck and stairs.

    170 m away · filed Jul 28, 2026 · Approved

  • 255 Campbell Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a front ground floor addition (porch enclosure).

    140 m away · filed Jun 20, 2024 · Approved

  • 267 Symington Ave · Minor variance

    To construct a new two-storey semi-detached ancillary building (containing one laneway suite), in the rear yard, abutting the laneway. There will be two dwelling units on this lot.

    40 m away · filed May 14, 2024 · Approved

  • 265 Symington Ave · Minor variance

    To construct a new two-storey ancillary building (containing one laneway suite), in the rear yard, abutting the laneway. There will be two dwelling units on this lot.

    30 m away · filed Apr 6, 2024 · Approved

  • 316 Campbell Ave · Minor variance

    To alter the development standards for the 26-storey mixed-use building (as approved under Site Specific Zoning By-Law 1074-2022) by increasing the project average rent across the 21 Affordable Housing Units.

    230 m away · filed Jan 12, 2024 · Approved

  • 5 Ruskin Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a front covered porch, a rear two-storey addition, a partial third storey addition with a rooftop deck (located on the east side), and a rear ground floor deck.

    230 m away · filed Aug 8, 2023 · Approved

  • 317 Perth Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a complete third storey addition.

    140 m away · filed Apr 11, 2022 · Approved

  • 315 Perth Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a complete third storey addition.

    130 m away · filed Apr 11, 2022 · Approved

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.