Toronto address · Ward 11, University-Rosedale
268 College St
The City of Toronto has 2 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Plumbing · Backflow prevention devices (Water only)
Proposal for the installation of a backflow prevention device.
Applied Feb 28, 2021 · issued Mar 31, 2021 · completed May 27, 2021 · Permit 21 121180 PSA
- Closed
Designated structure · Sign building permit related
In conjunction with a two-storey building on the premises, proposal to erect and display two illuminated signs, displaying static copy at the 2nd floor on the east and south elevations. ****CIBC****
Applied Jan 31, 2020 · issued Jun 2, 2020 · completed Jan 13, 2022 · Permit 20 109585 DST
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
9 storeys · 109 homes · Mixed use
70 m away · Site plan · Under review · filed Apr 20, 2022
- Approved
- Under review
- Under review
191-199 College Street and 74-76 Henry Street
31 storeys · 492 homes · Mixed use
430 m away · Site plan · Under review · filed Aug 28, 2022
Neighbours’ Committee of Adjustment files within 250 m
281 College St · Minor variance
To alter the existing three-storey mixed-use building by converting the office unit (occupying the rear portion of the ground level) into one additional residential dwelling unit. The exising retail unit (occupying the front portion of the ground level), and two residential units (occupying the second and third levels) will be maintained.
60 m away · filed Dec 18, 2025 · Approved
46 Russell St · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear three-storey addition, rear and side (west) balconies on the second and third storeys, and a side (west) basement window well. There will be a total of two residential dwelling units on this lot (one unit occupying the basement and ground floor, and one unit occupying the second and third storeys).
210 m away · filed Aug 5, 2025 · Deferred
55 Oxford St · Minor variance
To alter the existing three-storey semi-detached dwelling by demolishing the rear one-storey addition and to construct a new rear two-storey addition.
240 m away · filed Oct 31, 2024 · Approved
25 Major St · Minor variance
To legalize and to maintain the construction of a basement dwelling unit with front basement walkout stairs, which was constructed without an authorized building permit.There are a total of three residential dwelling units on this lot.
200 m away · filed Dec 21, 2023 · Approved
13 Oxford St · Minor variance
To alter the existing two-storey townhouse by constructing a fire shutter on the west side of the previously approved two-storey rear addition.
190 m away · filed Apr 27, 2021 · Approved
23 Major St · Minor variance
To convert the existing three-storey, one unit townhouse to a three-storey, two unit townhouse by creating a secondary suite in the basement with a new front porch and a new front basement walkout.
200 m away · filed Apr 21, 2021 · Approved
6 Nassau St · Minor variance
To construct five four-storey townhouse dwellings.
230 m away · filed Feb 28, 2021 · Approved
305 Augusta Ave · Minor variance
To alter the three-storey residential building by converting the basement and first storey into an eating establishment and constructing a rear ground floor patio. The two dwelling units located on the second and third floors will be maintained.
240 m away · filed Jun 11, 2020 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.