Toronto address · Ward 8, Eglinton-Lawrence
27 Cortland Ave
The City of Toronto has 4 building permits since 2017 (4 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Permit issued
Heating and ventilation
HVAC - Proposed new 2 storey rear addition with basement walk-up, new deck, and interior alterations
Applied Aug 12, 2026 · issued Aug 26, 2026 · Permit 25 261301 HVA
- Permit issued
Plumbing
Plumbing - Proposed new 2 storey rear addition with basement walk-up, new deck, and interior alterations
Applied Dec 2, 2025 · issued Jan 19, 2026 · Permit 25 261301 PLB
- Permit issued
Drains and site services
Drain - Proposed new 2 storey rear addition with basement walk-up, new deck, and interior alterations
Applied Dec 2, 2025 · issued Jan 19, 2026 · Permit 25 261301 DRN
- Inspections under way
Small residential project · Multiple projects
Proposed new 2 storey rear addition with basement walk-up, new deck, and interior alterations
Applied Dec 2, 2025 · issued Jan 19, 2026 · Permit 25 261301 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To alter the existing two-storey detached dwelling by constructing a two-storey rear addition, with a basement walk-up and a new deck. Please note, the application was previously deferred by the Committee of Adjustment on July 24, 2025.
Decision: Approved (hearing Sep 11, 2025)
Filed Jun 6, 2025 · File A0248/25NY
What’s planned nearby
Development sites within 500 m
- Under appeal
9 storeys · 40 homes · Residential
300 m away · Rezoning · Under appeal · filed Mar 3, 2023
- Approved
4 storeys · 16 homes · Residential
420 m away · Site plan · Approved · filed Jun 30, 2022
- Under review
109 homes · Residential
440 m away · Condominium · Under review · filed Oct 29, 2021
- Under review
Neighbours’ Committee of Adjustment files within 250 m
57 St Edmund's Dr · Minor variance
To alter the existing 2 1/2 storey detached dwelling by demolishing the existing two-storey rear addition and construct a new rear addition, rear deck and canopy, with associated changes to the parking area and landscaping.
210 m away · filed Sep 9, 2026 · Tentatively scheduled
37 Unsworth Ave · Minor variance
To alter the existing semi-detached dwelling and convert into a duplex by constructing a rear two-storey addition with a new rear deck.
230 m away · filed Jan 14, 2026 · Approved
30 Chudleigh Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a two-storey rear addition and a new rear deck. Please note, this application was previously deferred at the September 11, 2025 Committee of Adjustment Hearing.
150 m away · filed Jun 17, 2025 · Approved
28 Chatsworth Dr · Minor variance
To legalize and maintain the pool cabana in the rear yard and the front and rear yard landscaping.
200 m away · filed Mar 24, 2025 · Approved
33 Chudleigh Ave · Minor variance
To construct a two-storey addition to the rear of the existing dwelling, in conjunction with other interior and exterior alterations.
140 m away · filed Sep 13, 2023 · Approved
39 Chudleigh Ave · Minor variance
Proposal to construct new two storey dwelling with a rear deck, rear walkout, covered porch and window projection on the east wall.
170 m away · filed Jun 13, 2023 · Approved
39 Chudleigh Ave · Minor variance
Proposal to construct new 2 storey detached house with integrated basement and garage
170 m away · filed Apr 21, 2023 · Refused
15 Chudleigh Ave · Minor variance
Proposal to construct a two storey rear addition, a one storey front extension, a rear deck, and a detached rear yard garage and shed to the existing dwelling.
80 m away · filed Oct 17, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.