Toronto address · Ward 8, Eglinton-Lawrence
37 Unsworth Ave
The City of Toronto has 5 building permits since 2017 (5 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Under review
Small residential project · Multiple projects
REV 01: revision per drawingsProposal for a two-storey rear addition with a basement walkout, and the addition of a secondary suite
Applied Sep 10, 2026 · Permit 26 131722 BLD (revision 01)
- Permit issued
Heating and ventilation
HVAC - Proposal for a two-storey rear addition with a basement walkout, and the addition of a secondary suite
Applied Mar 20, 2026 · issued May 27, 2026 · Permit 26 131722 HVA
- Permit issued
Drains and site services
Drain - Proposal for a two-storey rear addition with a basement walkout, and the addition of a secondary suite
Applied Mar 20, 2026 · issued May 27, 2026 · Permit 26 131722 DRN
- Permit issued
Plumbing
Plumbing - Proposal for a two-storey rear addition with a basement walkout, and the addition of a secondary suite
Applied Mar 20, 2026 · issued May 27, 2026 · Permit 26 131722 PLB
- Inspections under way
Small residential project · Multiple projects
Proposal for a two-storey rear addition with a basement walkout, and the addition of a secondary suite
Applied Mar 19, 2026 · issued May 27, 2026 · 1 home added · Permit 26 131722 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To alter the existing semi-detached dwelling and convert into a duplex by constructing a rear two-storey addition with a new rear deck.
Decision: Approved (hearing Feb 19, 2026)
Filed Jan 14, 2026 · File A0020/26NY
What’s planned nearby
Development sites within 500 m
- Under review
109 homes · Residential
280 m away · Condominium · Under review · filed Oct 29, 2021
- Approved
4 storeys · 16 homes · Residential
340 m away · Site plan · Approved · filed Jun 30, 2022
- Under appeal
9 storeys · 40 homes · Residential
400 m away · Rezoning · Under appeal · filed Mar 3, 2023
Neighbours’ Committee of Adjustment files within 250 m
64 Unsworth Ave · Minor variance
To construct a new three-storey detached dwelling with a detached garage in the rear yard.
100 m away · filed Jun 12, 2026 · Approved with conditions
30 Chudleigh Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a two-storey rear addition and a new rear deck. Please note, this application was previously deferred at the September 11, 2025 Committee of Adjustment Hearing.
190 m away · filed Jun 17, 2025 · Approved
27 Cortland Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a two-storey rear addition, with a basement walk-up and a new deck. Please note, the application was previously deferred by the Committee of Adjustment on July 24, 2025.
230 m away · filed Jun 6, 2025 · Approved
44 Glengarry Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear addition and deck.
190 m away · filed Sep 12, 2024 · Approved
33 Chudleigh Ave · Minor variance
To construct a two-storey addition to the rear of the existing dwelling, in conjunction with other interior and exterior alterations.
230 m away · filed Sep 13, 2023 · Approved
39 Chudleigh Ave · Minor variance
Proposal to construct new two storey dwelling with a rear deck, rear walkout, covered porch and window projection on the east wall.
250 m away · filed Jun 13, 2023 · Approved
39 Chudleigh Ave · Minor variance
Proposal to construct new 2 storey detached house with integrated basement and garage
250 m away · filed Apr 21, 2023 · Refused
35 Bedford Park Ave · Minor variance
Proposed renovation to existing front and rear porches.
140 m away · filed Oct 18, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.