Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 3, Etobicoke-Lakeshore

27 Fifth St

The City of Toronto has 6 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Drains and site services · Back water valve (Sewer only)

    Proposed backwater valve installation in driveway

    Applied May 5, 2025 · issued May 5, 2025 · completed Jun 4, 2025 · Permit 25 154156 DRN

    Closed
  • Small residential project · Multiple projects

    Basement underpinning and alterations

    Applied Jun 12, 2014 · issued Jun 19, 2014 · completed Aug 21, 2019 · Permit 14 173049 BLD

    Closed
  • Small residential project · Multiple projects

    Second-storey addition and ground-floor interior alterations to an existing bungalow.**REVISION - remove breakfast area at rear and replace with a wood deck, relocate the washroom**

    Applied May 18, 2007 · issued Jun 6, 2007 · completed Aug 21, 2019 · Permit 06 147645 BLD (revision 01)

    Closed
  • Heating and ventilation

    HVAC - Second-storey addition and ground-floor interior alterations to an existing bungalow.

    Applied Jun 16, 2006 · issued Nov 28, 2006 · completed Aug 22, 2019 · Permit 06 147645 HVA

    Closed
  • Plumbing

    Plumbing - Second-storey addition and ground-floor interior alterations to an existing bungalow.

    Applied Jun 16, 2006 · issued Sep 11, 2006 · completed Aug 21, 2019 · Permit 06 147645 PLB

    Closed
  • Small residential project · Multiple projects

    Second-storey addition and ground-floor interior alterations to an existing bungalow.

    Applied Jun 16, 2006 · issued Sep 11, 2006 · completed Aug 21, 2019 · Permit 06 147645 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

  • 66 Third Street

    4 storeys · Not stated in the file

    460 m away · Site plan · Under review · filed Mar 13, 2026

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 4 Sixth St · Minor variance

    To construct a second and third storey addition above the existing detached dwelling.

    190 m away · filed Aug 11, 2025 · Approved

  • 53 Lake Shore Dr · Minor variance

    To construct a second storey addition above the existing dwelling, to reconfigure the existing basment walkout and a new covered deck along the south side.

    80 m away · filed Oct 4, 2024 · Approved

  • 45 Fourth St · Minor variance

    To construct a two-storey front addition and a new front porch.

    200 m away · filed Aug 21, 2023 · Approved

  • 38 Fourth St · Minor variance

    To construct a two-storey south side addition and to maintain the existing driveway.

    160 m away · filed Dec 15, 2022 · Approved

  • 5 Seventh St · Minor variance

    To construct a new detached dwelling with an attached garage.

    220 m away · filed Feb 17, 2022 · Approved

  • 35 Emerald Cres · Minor variance

    To construct a one-storey rear addition, a second storey addition above the existing dwelling, a new rear deck and a basement walkout.

    190 m away · filed Dec 8, 2021 · Approved

  • 43 Fifth St · Minor variance

    To construct a one-storey rear addition, a second storey addition above the existing dwelling, a new covered front porch and a rear yard deck.

    70 m away · filed Oct 8, 2021 · Approved

  • 5 Seventh St · Minor variance

    To construct a new detached dwelling with an attached garage.

    220 m away · filed Sep 14, 2021 · Refused

Everything planned in Etobicoke-Lakeshore

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.