Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 3, Etobicoke-Lakeshore

270 Sheldon Ave

The City of Toronto has 7 building permits since 2017 (4 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Addition or alteration · Balcony/Guard repairs

    Proposal for localized balcony and exterior wall repairs

    Applied Feb 11, 2025 · issued Mar 6, 2025 · completed Sep 23, 2025 · Permit 25 115624 BLD

    Closed
  • Addition or alteration · Other

    Localized Balcony and Exterior Wall Repairs

    Applied Mar 7, 2024 · issued Jun 11, 2024 · completed Dec 30, 2024 · Permit 24 122980 BLD

    Closed
  • Plumbing · Backflow prevention devices (Water only)

    Proposal to install a back flow prevention device

    Applied Nov 10, 2017 · issued Nov 14, 2017 · completed Aug 14, 2018 · Permit 17 260911 PSA

    Closed
  • Heating and ventilation

    HVAC - Proposal to convert existing storage room on the 3rd floor to an additional dwelling unit. Total number of units will be 74. No new parking spaces will be provided - existing spaces = 83.

    Applied Oct 16, 2015 · issued May 5, 2016 · Permit 15 238292 HVA

    Permit issued
  • Addition or alteration · Interior alterations

    Proposal to convert existing storage room on the 3rd floor to an additional dwelling unit. Total number of units will be 74. No new parking spaces will be provided - existing spaces = 83.

    Applied Oct 16, 2015 · issued May 5, 2016 · 1 home added · Permit 15 238292 BLD

    Permit issued
  • Plumbing

    Plumbing - Proposal to convert existing storage room on the 3rd floor to an additional dwelling unit. Total number of units will be 74. No new parking spaces will be provided - existing spaces = 83.

    Applied Oct 16, 2015 · issued May 5, 2016 · Permit 15 238292 PLB

    Permit issued
  • Addition or alteration · Multiple projects

    To prepair exterior wall, balcony and boiler room foundation wall repairs to existing apartment building.Scope of work revised to balcony slab repair only. (EY Sept 19, 2014)

    Applied Sep 11, 2014 · issued Sep 25, 2014 · Permit 14 220688 BLD

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 581 Evans Ave · Minor variance

    To construct a new two-storey garden suite in the rear yard.

    220 m away · filed Oct 27, 2025 · Approved

  • 227 Sheldon Ave · Minor variance

    To construct a new semi-detached dwelling with an attached garage.

    250 m away · filed Jul 13, 2023 · Approved

  • 227 Sheldon Ave · Minor variance

    To construct a new semi-detached dwelling with an attached garage.

    250 m away · filed Jul 13, 2023 · Approved

  • 227 Sheldon Ave · Consent

    To obtain consent to sever the property into two undersized lots.

    250 m away · filed Jul 13, 2023 · Approved

  • 245 Sheldon Ave · Minor variance

    To construct a second storey addition above the existing dwelling and a rear yard deck.

    140 m away · filed May 27, 2022 · Approved

  • 25 Silvercrest Ave · Minor variance

    To construct a second-storey addition above the existing dwelling, a two-storey west side addition, a new front porch and new rear deck.

    170 m away · filed Dec 1, 2021 · Approved

  • 232 Sheldon Ave · Minor variance

    To construct a new detached dwelling with an attached garage.

    220 m away · filed May 9, 2021 · Approved

  • 77 Lunness Rd · Consent

    To obtain consent for technical severance of the property for the purpose of re-establishing two separate lots.

    190 m away · filed Apr 16, 2021 · Approved

Everything planned in Etobicoke-Lakeshore

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.