Toronto address · Ward 9, Davenport
279 Westmoreland Ave
The City of Toronto has 1 building permit since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Drains and site services · Back water valve (Sewer only)
Proposal to install a backwater valve on the sanitary line in an existing SFD-semi dwelling.
Applied Apr 29, 2019 · issued Apr 29, 2019 · completed Apr 30, 2019 · Permit 19 146444 DRN
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
- Under review
19 storeys · 251 homes · Residential
400 m away · Site plan · Under review · filed Aug 31, 2021
Neighbours’ Committee of Adjustment files within 250 m
195 Hallam St · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a complete third storey addition with a rear balcony.
230 m away · filed Jan 15, 2026 · Approved
975 Dovercourt Rd · Minor variance
To convert the existing two-storey mixed-use building into a residential building (fourplex) by constructing a rear two-storey addition with a ground floor deck and stairs, and second and third storey balconies. Also, to construct a complete third storey addition. In addition, to construct a two-storey ancillary building to contain one garden suite. There will be a total of five residential dwelling units on this lot (four dwelling units within the main house and one dwelling unit within the ancillary building).
240 m away · filed Jan 20, 2025 · Deferred
205 Westmoreland Ave · Minor variance
To convert the existing two-and-one-half-storey semi-detached dwelling into a duplex by constructing a rear two-storey addition, a rear ground floor deck, a covered front porch with a second storey balcony. Also, to construct a new two-storey ancillary building (one car lift from a basement level and one laneway suite with a second storey balcony), in the rear yard, abutting the laneway. There will be a total of three residential dwelling units on this lot (two units within the main dwelling and one unit within the ancillary building).
230 m away · filed Apr 2, 2024 · Approved
181 Hallam St · Minor variance
To alter the existing two-storey townhouse dwelling by reconstructing and enlarging the rear one-storey addition with a rear ground floor deck and reconstructing the rear basement walkout.
200 m away · filed Jan 23, 2024 · Approved
216 Westmoreland Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear third storey addition with a rear third storey deck.
220 m away · filed Nov 16, 2023 · Approved
314 Westmoreland Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling (currently under construction, as approved by Minor Variance Application Number A1089/21TEY) by constructing a rear exterior staircase (three levels). Also, to install a secondary suite on the second and third storeys.
90 m away · filed Oct 30, 2023 · Approved
270 Westmoreland Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear three-storey addition with a third storey deck, new side exterior stairs leading to the first and second storeys, and a new rear first storey deck.
60 m away · filed Mar 6, 2023 · Approved
157 Hallam St · Minor variance
To construct a new three-storey triplex dwelling with side entrances and third storey balconies for Units A and B and a rear entrance and ground floor deck for Unit C. Also, to construct a two-storey ancillary building (two-car garage and one laneway suite) in the rear yard, abutting the laneway.
190 m away · filed Oct 21, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.