Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 3, Etobicoke-Lakeshore

28 Eleventh St

The City of Toronto has 4 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    Plumbing - Interior alterations and renovations consisting fo the removal of load bearing waslls and the removal of two concrete piers in basement, replace by new structural beams, and underpinning the foundation to lower the basement slab.

    Applied Oct 26, 2022 · issued Oct 26, 2022 · completed Dec 5, 2024 · Permit 21 238598 PLB

    Closed
  • Drains and site services

    Drain - Interior alterations and renovations consisting fo the removal of load bearing waslls and the removal of two concrete piers in basement, replace by new structural beams, and underpinning the foundation to lower the basement slab.

    Applied Oct 26, 2022 · issued Oct 26, 2022 · completed Dec 5, 2024 · Permit 21 238598 DRN

    Closed
  • Small residential project · Multiple projects

    Interior alterations and renovations consisting fo the removal of load bearing waslls and the removal of two concrete piers in basement, replace by new structural beams, and underpinning the foundation to lower the basement slab.REVISION 01 :In this revision the only change is to enlarge an existing window on main floor faceing south. The existing header remains and window sill is lowered to create larger glazed opening.

    Applied Mar 21, 2022 · issued Jun 22, 2022 · completed Dec 5, 2024 · Permit 21 238598 BLD (revision 01)

    Closed
  • Small residential project · Multiple projects

    Interior alterations and renovations consisting fo the removal of load bearing waslls and the removal of two concrete piers in basement, replace by new structural beams, and underpinning the foundation to lower the basement slab.

    Applied Nov 16, 2021 · issued Dec 13, 2021 · completed Dec 5, 2024 · Permit 21 238598 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 46 Tenth St · Minor variance

    To maintain the existing front porch that is currently uncer construction.

    140 m away · filed Sep 26, 2025 · Approved

  • 36 Eleventh St · Minor variance

    To construct a new semi-detached garage in the rear yard.

    30 m away · filed Sep 3, 2025 · Approved

  • 69 Tenth St · Minor variance

    To construct a two-storey rear addition including a deck in the rear yard.

    230 m away · filed Aug 9, 2024 · Approved

  • 69 Twelfth St · Minor variance

    To construct a new detached dwelling with an attached garage.

    200 m away · filed Mar 26, 2024 · Approved

  • 52 Thirteenth St · Minor variance

    To construct a new triplex.

    210 m away · filed Feb 15, 2024 · Approved

  • 46 Tenth St · Minor variance

    To construct a second storey addition above the existing dwelling and to legalize and to maintain a detached garage in the rear yard currently under construction.

    140 m away · filed Nov 6, 2023 · Approved

  • 33 Twelfth St · Minor variance

    To construct a new detached dwelling with an attached garage.

    50 m away · filed Jun 13, 2023 · Approved

  • 42 Thirteenth St · Minor variance

    To construct a two-storey rear addition, a second storey over the existing dwelling and a new rear yard deck.

    190 m away · filed May 17, 2023 · Approved

Everything planned in Etobicoke-Lakeshore

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.