Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 3, Etobicoke-Lakeshore

2845 Bloor St W

The City of Toronto has 26 building permits since 2017 (14 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Interior finishing of the existing third floor of Paradise Mausoleum at Park Lawn Cemetery.

    Applied Apr 16, 2026 · issued May 7, 2026 · Permit 26 145251 HVA

    Inspections under way
  • Addition or alteration · Interior alterations

    Interior finishing of the existing third floor of Paradise Mausoleum at Park Lawn Cemetery.

    Applied Apr 16, 2026 · issued May 7, 2026 · Permit 26 145251 BLD

    Inspections under way
  • Addition or alteration · Interior alterations

    Interior alterations to 2nd floor and relocation of existing sprinkler heads

    Applied Dec 15, 2020 · issued Jan 22, 2021 · completed Aug 9, 2021 · Permit 20 229334 BLD

    Closed
  • Plumbing

    Plumbing - Interior alterations to 2nd floor and relocation of existing sprinkler heads

    Applied Dec 15, 2020 · completed Jan 18, 2021 · Permit 20 229334 PLB

    Cancelled
  • Heating and ventilation

    HVAC - Interior alterations to 2nd floor and relocation of existing sprinkler heads

    Applied Dec 15, 2020 · issued Jan 22, 2021 · completed Jul 26, 2021 · Permit 20 229334 HVA

    Closed
  • Plumbing · Backflow prevention devices (Water only)

    Proposal to install (2) DCVA backflow prevention devices. 1 - Domestic Water, 1 - Summer Irrigation Service.

    Applied May 17, 2019 · issued Jun 24, 2019 · Permit 19 156082 PSA

    Inspections under way
  • Plumbing · Backflow prevention devices (Water only)

    Proposal to install a backflow prevention device and thermal expansion tank for existing office building.

    Applied May 10, 2019 · issued Jun 25, 2019 · completed Jul 18, 2025 · Permit 19 152625 PSA

    Closed
  • Heating and ventilation

    HVAC Revision 01 - Revision to second floor to be left unfinished as identified on drawings.Proposed 3-storey addition to existing 3-storey mausoleum.

    Applied Apr 4, 2016 · issued May 5, 2016 · completed Jan 12, 2017 · Permit 15 143028 HVA (revision 01)

    Closed
  • Addition or alteration · Multiple projects

    Revision 01 - Revision to second floor to be left unfinished as identified on drawings.Proposed 3-storey addition to existing 3-storey mausoleum.

    Applied Apr 4, 2016 · issued Apr 25, 2016 · completed Feb 23, 2017 · Permit 15 143028 BLD (revision 01)

    Closed
  • Designated structure · Retaining wall

    Revision 01 - Proposal to revise entire retaining wall construction with retain wall masonry units. Permit to construct new retaining wall with excavation of existing slope on Cemetary property.

    Applied Jul 31, 2015 · issued Sep 3, 2015 · completed Jun 8, 2017 · Permit 15 132530 DST (revision 01)

    Cancelled
  • Heating and ventilation

    HVAC - Proposed 3-storey addition to existing 3-storey mausoleum.

    Applied Apr 20, 2015 · issued Jun 29, 2015 · completed Jan 12, 2017 · Permit 15 143028 HVA

    Closed
  • Addition or alteration · Multiple projects

    Proposed 3-storey addition to existing 3-storey mausoleum.

    Applied Apr 17, 2015 · issued Jun 29, 2015 · completed Feb 23, 2017 · Permit 15 143028 BLD

    Closed
Show 14 more permits
  • Designated structure · Retaining wall

    Permit to construct new retaining wall with excavation of existing slope on Cemetary property.

    Applied Mar 26, 2015 · issued May 5, 2015 · completed May 25, 2017 · Permit 15 132530 DST

    Cancelled
  • Addition or alteration · Interior alterations

    Interior alteration: 3rd floor finish.

    Applied Mar 5, 2013 · issued Apr 17, 2013 · Permit 13 128248 BLD

    Inspections under way
  • Fire and security upgrade · Electromagnetic locks

    Installation of (1) magnetic hold open device to door #201 on the 2nd floor of existing (3) storey mausoleum.

    Applied Sep 21, 2009 · issued Sep 30, 2009 · Permit 09 171360 FSU

    Inspections under way
  • Heating and ventilation

    HVAC - Proposed interior finishing to the second floor of the existing 3-storey mausoleum at Park Lawn Cemetery. No proposed exterior work. Existing unfinished portion of the third storey remains unfinished.

    Applied Aug 6, 2009 · issued Sep 10, 2009 · Permit 09 153983 HVA

    Inspections under way
  • Addition or alteration · Interior alterations

    Proposed interior finishing to the second floor of the existing 3-storey mausoleum at Park Lawn Cemetery. No proposed exterior work. Existing unfinished portion of the third storey remains unfinished.

    Applied Aug 6, 2009 · issued Sep 10, 2009 · Permit 09 153983 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - To construct a new one storey office building for "Parklawn Cemetary"

    Applied Feb 26, 2008 · issued Jul 16, 2008 · Permit 08 114367 HVA

    Inspections under way
  • New building

    To construct a new one storey office building for "Parklawn Cemetary"

    Applied Feb 26, 2008 · issued Jul 16, 2008 · Permit 08 114367 BLD

    Inspections under way
  • Drains and site services · Inside and outside drains

    Drain - To construct a new one storey office building for "Parklawn Cemetary"

    Applied Feb 26, 2008 · issued May 7, 2008 · completed Aug 24, 2026 · Permit 08 114367 STS

    Closed
  • Plumbing

    Plumbing - To construct a new one storey office building for "Parklawn Cemetary"

    Applied Feb 26, 2008 · issued Jul 16, 2008 · Permit 08 114367 PLB

    Inspections under way
  • Plumbing

    Plumbing - To construct a new three storey mausoleum addition to the existing three storey mausoleum building

    Applied Aug 21, 2006 · issued Oct 19, 2006 · Permit 06 162835 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - To construct a new three storey mausoleum addition to the existing three storey mausoleum building

    Applied Aug 21, 2006 · issued Oct 19, 2006 · Permit 06 162835 HVA

    Inspections under way
  • Residential building permit · New building

    Eight storey new condominium apartment building with underground garage.

    Applied Jul 10, 2003 · issued Aug 5, 2004 · 135 homes added · Permit 03 154733 BLD

    Inspections under way
  • Plumbing

    Plumbing - Eight storey new condominium apartment building with underground garage - New Building

    Applied Jul 10, 2003 · issued Aug 6, 2004 · Permit 03 154733 PLB

    Inspections under way
  • Non-residential building permit · Alteration to existing building

    Interior alterations to second & third floor of exisiting masoleum and sprinklers

    Applied Aug 11, 2000 · issued Dec 7, 2000 · completed Jun 8, 2026 · Permit 00 327310 CMB

    Closed (dormant)

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

  • 69 Old Mill Terrace

    39 storeys · 345 homes · Residential

    70 m away · Site plan · Under review · filed Nov 20, 2025

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 100 Old Mill Rd · Minor variance

    To construct a two-storey rear addition, a second storey rear platform and a deck in the rear yard.

    160 m away · filed Mar 18, 2026 · Approved

  • 2816 Bloor St W · Minor variance

    To permit a townhouse use and to construct five townhouse units.

    190 m away · filed Dec 21, 2022 · Deferred

Everything planned in Etobicoke-Lakeshore

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.