Toronto address · Ward 3, Etobicoke-Lakeshore
2845 Bloor St W
The City of Toronto has 26 building permits since 2017 (14 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Heating and ventilation
HVAC - Interior finishing of the existing third floor of Paradise Mausoleum at Park Lawn Cemetery.
Applied Apr 16, 2026 · issued May 7, 2026 · Permit 26 145251 HVA
- Inspections under way
Addition or alteration · Interior alterations
Interior finishing of the existing third floor of Paradise Mausoleum at Park Lawn Cemetery.
Applied Apr 16, 2026 · issued May 7, 2026 · Permit 26 145251 BLD
- Closed
Addition or alteration · Interior alterations
Interior alterations to 2nd floor and relocation of existing sprinkler heads
Applied Dec 15, 2020 · issued Jan 22, 2021 · completed Aug 9, 2021 · Permit 20 229334 BLD
- Cancelled
Plumbing
Plumbing - Interior alterations to 2nd floor and relocation of existing sprinkler heads
Applied Dec 15, 2020 · completed Jan 18, 2021 · Permit 20 229334 PLB
- Closed
Heating and ventilation
HVAC - Interior alterations to 2nd floor and relocation of existing sprinkler heads
Applied Dec 15, 2020 · issued Jan 22, 2021 · completed Jul 26, 2021 · Permit 20 229334 HVA
- Inspections under way
Plumbing · Backflow prevention devices (Water only)
Proposal to install (2) DCVA backflow prevention devices. 1 - Domestic Water, 1 - Summer Irrigation Service.
Applied May 17, 2019 · issued Jun 24, 2019 · Permit 19 156082 PSA
- Closed
Plumbing · Backflow prevention devices (Water only)
Proposal to install a backflow prevention device and thermal expansion tank for existing office building.
Applied May 10, 2019 · issued Jun 25, 2019 · completed Jul 18, 2025 · Permit 19 152625 PSA
- Closed
Heating and ventilation
HVAC Revision 01 - Revision to second floor to be left unfinished as identified on drawings.Proposed 3-storey addition to existing 3-storey mausoleum.
Applied Apr 4, 2016 · issued May 5, 2016 · completed Jan 12, 2017 · Permit 15 143028 HVA (revision 01)
- Closed
Addition or alteration · Multiple projects
Revision 01 - Revision to second floor to be left unfinished as identified on drawings.Proposed 3-storey addition to existing 3-storey mausoleum.
Applied Apr 4, 2016 · issued Apr 25, 2016 · completed Feb 23, 2017 · Permit 15 143028 BLD (revision 01)
- Cancelled
Designated structure · Retaining wall
Revision 01 - Proposal to revise entire retaining wall construction with retain wall masonry units. Permit to construct new retaining wall with excavation of existing slope on Cemetary property.
Applied Jul 31, 2015 · issued Sep 3, 2015 · completed Jun 8, 2017 · Permit 15 132530 DST (revision 01)
- Closed
Heating and ventilation
HVAC - Proposed 3-storey addition to existing 3-storey mausoleum.
Applied Apr 20, 2015 · issued Jun 29, 2015 · completed Jan 12, 2017 · Permit 15 143028 HVA
- Closed
Addition or alteration · Multiple projects
Proposed 3-storey addition to existing 3-storey mausoleum.
Applied Apr 17, 2015 · issued Jun 29, 2015 · completed Feb 23, 2017 · Permit 15 143028 BLD
Show 14 more permits
- Cancelled
Designated structure · Retaining wall
Permit to construct new retaining wall with excavation of existing slope on Cemetary property.
Applied Mar 26, 2015 · issued May 5, 2015 · completed May 25, 2017 · Permit 15 132530 DST
- Inspections under way
Addition or alteration · Interior alterations
Interior alteration: 3rd floor finish.
Applied Mar 5, 2013 · issued Apr 17, 2013 · Permit 13 128248 BLD
- Inspections under way
Fire and security upgrade · Electromagnetic locks
Installation of (1) magnetic hold open device to door #201 on the 2nd floor of existing (3) storey mausoleum.
Applied Sep 21, 2009 · issued Sep 30, 2009 · Permit 09 171360 FSU
- Inspections under way
Heating and ventilation
HVAC - Proposed interior finishing to the second floor of the existing 3-storey mausoleum at Park Lawn Cemetery. No proposed exterior work. Existing unfinished portion of the third storey remains unfinished.
Applied Aug 6, 2009 · issued Sep 10, 2009 · Permit 09 153983 HVA
- Inspections under way
Addition or alteration · Interior alterations
Proposed interior finishing to the second floor of the existing 3-storey mausoleum at Park Lawn Cemetery. No proposed exterior work. Existing unfinished portion of the third storey remains unfinished.
Applied Aug 6, 2009 · issued Sep 10, 2009 · Permit 09 153983 BLD
- Inspections under way
Heating and ventilation
HVAC - To construct a new one storey office building for "Parklawn Cemetary"
Applied Feb 26, 2008 · issued Jul 16, 2008 · Permit 08 114367 HVA
- Inspections under way
New building
To construct a new one storey office building for "Parklawn Cemetary"
Applied Feb 26, 2008 · issued Jul 16, 2008 · Permit 08 114367 BLD
- Closed
Drains and site services · Inside and outside drains
Drain - To construct a new one storey office building for "Parklawn Cemetary"
Applied Feb 26, 2008 · issued May 7, 2008 · completed Aug 24, 2026 · Permit 08 114367 STS
- Inspections under way
Plumbing
Plumbing - To construct a new one storey office building for "Parklawn Cemetary"
Applied Feb 26, 2008 · issued Jul 16, 2008 · Permit 08 114367 PLB
- Inspections under way
Plumbing
Plumbing - To construct a new three storey mausoleum addition to the existing three storey mausoleum building
Applied Aug 21, 2006 · issued Oct 19, 2006 · Permit 06 162835 PLB
- Inspections under way
Heating and ventilation
HVAC - To construct a new three storey mausoleum addition to the existing three storey mausoleum building
Applied Aug 21, 2006 · issued Oct 19, 2006 · Permit 06 162835 HVA
- Inspections under way
Residential building permit · New building
Eight storey new condominium apartment building with underground garage.
Applied Jul 10, 2003 · issued Aug 5, 2004 · 135 homes added · Permit 03 154733 BLD
- Inspections under way
Plumbing
Plumbing - Eight storey new condominium apartment building with underground garage - New Building
Applied Jul 10, 2003 · issued Aug 6, 2004 · Permit 03 154733 PLB
- Closed (dormant)
Non-residential building permit · Alteration to existing building
Interior alterations to second & third floor of exisiting masoleum and sprinklers
Applied Aug 11, 2000 · issued Dec 7, 2000 · completed Jun 8, 2026 · Permit 00 327310 CMB
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
39 storeys · 345 homes · Residential
70 m away · Site plan · Under review · filed Nov 20, 2025
Neighbours’ Committee of Adjustment files within 250 m
100 Old Mill Rd · Minor variance
To construct a two-storey rear addition, a second storey rear platform and a deck in the rear yard.
160 m away · filed Mar 18, 2026 · Approved
2816 Bloor St W · Minor variance
To permit a townhouse use and to construct five townhouse units.
190 m away · filed Dec 21, 2022 · Deferred
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.