Toronto address · Ward 9, Davenport
29 Middleton St
The City of Toronto has 4 building permits since 2017 (4 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Plumbing
Plumbing - Proposal to underpin the basement, replace existing wall with an I beam (Maintain Cold Room) and add a rear basment walk-out to the existing single family dwelling.
Applied May 21, 2015 · issued May 22, 2015 · Permit 15 108909 PLB
- Revision issued
Small residential project · Multiple projects
REVISION - to finish the basementProposal to underpin the basement, replace existing wall with an I beam (Maintain Cold Room) and add a rear basment walk-out to the existing single family dwelling.
Applied May 21, 2015 · issued Jun 16, 2015 · Permit 15 108909 BLD (revision 01)
- Inspections under way
Drains and site services
Drain - Proposal to underpin the basement, remove the wall between the cold room and family room and replace with an I beam and add a rear basment walk-out to the existing single family dwelling.
Applied Jan 28, 2015 · issued Feb 5, 2015 · Permit 15 108909 DRN
- Inspections under way
Small residential project · Multiple projects
Proposal to underpin the basement, replace existing wall with an I beam (Maintain Cold Room) and add a rear basment walk-out to the existing single family dwelling.
Applied Jan 27, 2015 · issued Feb 5, 2015 · Permit 15 108909 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
18 storeys · 176 homes · Mixed use
300 m away · Site plan · Under review · filed Jun 30, 2025
- Under review
8 storeys · 57 homes · Mixed use
400 m away · Site plan · Under review · filed Feb 15, 2023
- Under review
1-3 Boland Lane and 646-648 Dufferin Street
8 storeys · 135 homes · Residential
430 m away · Condominium · Under review · filed Oct 12, 2021
- Under review
12 storeys · 169 homes · Mixed use
500 m away · Condominium · Under review · filed Dec 16, 2021
Neighbours’ Committee of Adjustment files within 250 m
15 Wyndham St · Minor variance
To construct a one-storey ancillary building (art workshop), including a green roof, in the rear yard (abutting Mechanic Avenue).
210 m away · filed Jul 31, 2026 · Hearing scheduled
11 Bank St · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing one and two-storey rear additions.
220 m away · filed Oct 24, 2024 · Approved
23 Delaney Cres · Minor variance
To alter the existing two-storey townhouse dwelling by constructing a complete third storey addition above the two-storey portion of the dwelling.
140 m away · filed Jan 31, 2023 · Approved
6 Delaney Cres · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a side (east) three-storey addition and a third storey addition, a rear second storey balcony and a rear third storey balcony.
110 m away · filed Nov 30, 2022 · Approved
68 Florence St · Minor variance
To alter the existing two-unit, two-and-one-half-storey townhouse by constructing a rear second storey addition and a new basement secondary suite.
60 m away · filed Oct 7, 2022 · Approved
25 Gordon St · Minor variance
To alter the existing two-storey townhouse dwelling by constructing a two-storey rear addition, a complete third storey addition, a new front porch and basement walkout, a rear third storey balcony, second and third storey front bay windows, and a side (west) basement walkout.
190 m away · filed Sep 15, 2022 · Approved
25 Delaney Cres · Minor variance
To alter the existing two-storey townhouse dwelling by constructing a new one-storey rear addition with a second storey balcony above, and a rear ground floor deck with a walkout basement.
150 m away · filed Jun 24, 2022 · Approved
11 Sheridan Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a partial third storey addition and a three-storey rear addition with a rear third storey balcony.
150 m away · filed Jan 27, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.