Toronto address · Ward 3, Etobicoke-Lakeshore
2982 Bloor St W
The City of Toronto has 7 building permits since 2017 (4 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revision issued
Addition or alteration · Interior alterations
Revision to delete rear basement fire door (adding fire alarm)Proposal for interior alterations and the construction of new stairs to basement to existing retail/commercial building
Applied Apr 8, 2014 · issued Apr 8, 2014 · Permit 13 282019 BLD (revision 01)
- Inspections under way
Addition or alteration · Interior alterations
Interior alterations to existing retail store for a new CT - clothing store.
Applied Jan 24, 2014 · issued Feb 6, 2014 · Permit 14 108891 BLD
- Inspections under way
Heating and ventilation
HVAC - Interior alterations to existing reatail store for a new CT - clothing store.
Applied Jan 24, 2014 · issued Mar 4, 2014 · Permit 14 108891 HVA
- Inspections under way
Addition or alteration · Interior alterations
Proposal for interior alterations and the construction of new stairs to basement to existing retail/commercial building
Applied Dec 30, 2013 · issued Feb 10, 2014 · Permit 13 282019 BLD
- Closed
Heating and ventilation
HVAC - Proposal for interior alterations and the construction of new stairs to basement to existing retail/commercial building
Applied Dec 30, 2013 · issued Feb 10, 2014 · completed Aug 21, 2026 · Permit 13 282019 HVA
- Closed
Plumbing
Plumbing - Proposal for interior alterations and the construction of new stairs to basement to existing retail/commercial building
Applied Dec 30, 2013 · issued Feb 10, 2014 · completed Jun 12, 2025 · Permit 13 282019 PLB
- Closed (dormant)
Addition or alteration · Other
Replace existing roof over existing patio. Replace concrete to the same patio to comercial building.
Applied Sep 27, 2001 · issued Jun 14, 2002 · completed Jun 8, 2026 · Permit 01 181221 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
7 storeys · Mixed use
110 m away · Rezoning · Under review · filed Apr 28, 2022
- Under appeal
29 storeys · 423 homes · Mixed use
180 m away · Rezoning · Under appeal · filed Aug 12, 2025
Neighbours’ Committee of Adjustment files within 250 m
19 Humbervale Blvd · Minor variance
To construct a second storey rear addition.
110 m away · filed Aug 24, 2026 · Notice prepared
44 Humbervale Blvd · Minor variance
To construct a second-storey addition above the existing dwelling.
220 m away · filed Sep 10, 2025 · Approved
11 Grenview Blvd N · Minor variance
To allow a temporary shipping container on-site.
180 m away · filed Aug 22, 2025 · Application withdrawn
237 Grenview Blvd S · Minor variance
To construct a new two-storey front and rear addition to the existing dwelling.
240 m away · filed Oct 21, 2024 · Approved
11 Birchview Blvd · Minor variance
To construct a one-storey rear addition to the existing dwelling in order to permit a secondary suite.
230 m away · filed Aug 21, 2024 · Deferred
38 Willingdon Blvd · Minor variance
To construct a new detached dwelling with an attached garage. The existing detached garage in the rear yard will be demolished.
210 m away · filed Jul 8, 2024 · Approved
44 Meadowvale Dr · Minor variance
To construct a new two-storey front addition and a second storey rear addition above the existing dwelling.
220 m away · filed Dec 6, 2023 · Approved
46 Willingdon Blvd · Minor variance
To construct a two-storey rear addition and a new detached garage in the rear yard.
240 m away · filed May 31, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.